Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (c) 16 km/h — Method: total distance = 12 + 8 = 20 km. Total time = 30 + 30 + 15 = 75 minutes = 1.25 hours. Average speed = total distance ÷ total time = 20 ÷ 1.25 = 16 km/h. Distractor origins: 20 km/h gives the total distance without ever dividing by the total time; 24 km/h uses only the speed of the first stage (12 km in 30 minutes), ignoring the second stage and the rest; 28 km/h averages the two separate stage speeds, 24 km/h and 32 km/h, instead of using total distance over total time.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (b) 8 kg — The cost above the flat £5 charge is 17 − 5 = £12. At £2 per kg, this covers 12 ÷ 2 = 6 kg above the first 2 kg, so the total weight is 2 + 6 = 8 kg. Dividing the full £17 by £2 per kg without first taking off the £5 flat charge gives 17 ÷ 2 = 8.5 kg. Taking off the £5 flat charge and dividing by £2 per kg, but forgetting to add back the 2 kg that the flat charge covers, gives 12 ÷ 2 = 6 kg. Taking off £2 instead of £5 as the flat charge, (17 − 2) ÷ 2 = 7.5 kg, swaps which number is the fixed fee.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (b) 8 — The perimeter is 2(x + (x + 3)) = 4x + 6, so 4x + 6 = 38, which gives 4x = 32 and x = 8. A candidate who forgets the '+3' and treats the rectangle as a square, solving 2(2x) = 38, gets x = 9.5. A candidate who forgets to double the sum of the sides, solving 2x + 3 = 38, gets x = 17.5. A candidate who uses 3x instead of x + 3 for the length, solving 2(x + 3x) = 38, gets x = 4.75.
- (a) t = 0 or t = 4 — The ball is at ground level exactly when h = 0. From the table, h = 0 at t = 0 and at t = 4, so those are the two times. Distractor origins: t = 1 or t = 3 picks the times with equal (but non-zero) height instead of ground level; t = 2 picks the time of maximum height instead of ground level; t = 0 finds only the starting time and misses the second one.
- (d) 1 hour 32 minutes — T = 40 × 1.8 + 20 = 72 + 20 = 92 minutes. Since 92 = 60 + 32, the cooking time is 1 hour 32 minutes. A candidate who rounds the mass to 2 kg before substituting gets 40 × 2 + 20 = 100 minutes = 1 hour 40 minutes. A candidate who forgets to add the 20 minutes gets 40 × 1.8 = 72 minutes = 1 hour 12 minutes. A candidate who multiplies the mass by (40 + 20) = 60 instead of substituting into the formula gets 1.8 × 60 = 108 minutes = 1 hour 48 minutes.
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (a) 4.897 — Method: substitute the starting value into the right-hand side of the formula to get x₁, then feed each new value back in, keeping the whole calculator display every time and rounding only at the very end. Working: x₁ = √(5 × 2 + 2) = √12 = 3.46410…; x₂ = √(5 × 3.46410… + 2) = √19.32050… = 4.39551…; x₃ = √(5 × 4.39551… + 2) = √23.97755… = 4.89668…, which is 4.897 correct to 3 decimal places. Answer: 4.897. The distractors: 4.396 is x₂, written down by a candidate who counts the starting value x₀ as the first iterate and so stops one use of the formula early; 3.464 is x₁, the value after using the formula only once; 5.146 is x₄, one use of the formula too many — the mirror image of the first slip, made by a candidate who labels the first value worked out as x₀ rather than as x₁ and so runs the count a step long.
- (d) 12 — Since a₃ = a₂ + a₁, rearranging gives a₂ = a₃ − a₁ = 17 − 5 = 12. 22 comes from adding instead of subtracting: a₃ + a₁ = 17 + 5 = 22. 11 comes from treating the sequence as if it were arithmetic and averaging the two given terms: (5 + 17) ÷ 2 = 11 — but a Fibonacci-type sequence isn't arithmetic, so this doesn't apply. −12 comes from subtracting in the wrong order: a₁ − a₃ = 5 − 17 = −12.
- (b) 5 cm³ — When P = 32, V = 480 ÷ 32 = 15 cm³. When P = 24, V = 480 ÷ 24 = 20 cm³. The increase in volume is 20 − 15 = 5 cm³. Giving only the second volume, 20 cm³, forgets to subtract the first volume. Giving only the first volume, 15 cm³, answers the wrong part of the question. Subtracting the two pressures instead of the two volumes, 32 − 24 = 8, mixes up which quantity the question asks for.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
Build your own mix at the worksheet builder.