Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 12 cm — For a square, area = side². So side² = 144, giving side = ±12. Since a length must be positive, the side length is 12 cm. A candidate who gives both square roots without rejecting the negative one, which cannot be a length, answers 12 cm or −12 cm. A candidate who halves 144 instead of taking its square root gets 72 cm. A candidate who divides 144 by 4, confusing the area formula with a perimeter calculation, gets 36 cm.
- (c) 50 — Method: the edge of the track is a circle centred on the origin, so it has equation x² + y² = r²; use the floodlight whose coordinates are given to find r², then substitute x = 0 to find where that circle meets the positive y-axis. Working: 30² + 40² = 900 + 1600 = 2500, so the edge of the track is x² + y² = 2500. Substituting x = 0 gives k² = 2500, so k = √2500 = 50, taking the positive root because k is positive. Answer: k = 50. The distractors: 2500 is r² used as though it were the radius, which would place the second floodlight fifty times too far from the centre; 70 adds the two coordinates, 30 + 40, instead of adding their squares; 40 takes the y-coordinate of the first floodlight to be the radius, which would only be true if that floodlight stood on the y-axis itself.
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (b) s = d / t — Method: undo the multiplication by t by dividing both sides by t. Working: d = st, so dividing both sides by t gives s = d / t. The value s = dt comes from multiplying by t instead of dividing. The value s = t / d comes from inverting the fraction, dividing t by d instead of d by t. The value s = d − t comes from subtracting t instead of dividing by it.
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (a) −2 m/s² — The gradient of a line through two points is the change in the y-value divided by the change in the x-value: (6 − 22)/(16 − 8) = −16/8 = −2 m/s². The negative sign confirms the deceleration mentioned in the question. Writing 2 m/s² comes from subtracting the velocities in the wrong order, using (22 − 6) instead of (6 − 22), which loses the sign that shows the car is slowing down. Writing −0.5 m/s² comes from inverting the fraction, dividing the change in time by the change in velocity instead of the other way round. Writing −16 m/s² comes from finding the change in velocity, −16, but forgetting to divide by the change in time, 8 seconds.
- (a) It gets closer to zero but never actually reaches it. — y = 60 × (0.5)ˣ is always positive, however large x is, because a positive number raised to any power stays positive. As x increases, (0.5)ˣ gets smaller and smaller but never equals zero, so y approaches zero without ever reaching it. Believing the curve reaches zero when x = 60, because 60 is the starting value, mixes up the y-intercept with a stopping point — an exponential decay curve like this one never actually reaches the x-axis, so this is wrong. Believing the curve goes negative for large x is wrong because multiplying a positive number by (0.5) any number of times can never produce a negative result. Believing the curve levels off at y = 0.5, confusing the base of the exponential with its eventual level, is wrong: the base only controls how fast the curve falls, not where it settles — this curve settles at y = 0, not y = 0.5. Whenever you sketch an exponential decay curve, draw it approaching the x-axis but never touching it.
- (b) 5 cm³ — When P = 32, V = 480 ÷ 32 = 15 cm³. When P = 24, V = 480 ÷ 24 = 20 cm³. The increase in volume is 20 − 15 = 5 cm³. Giving only the second volume, 20 cm³, forgets to subtract the first volume. Giving only the first volume, 15 cm³, answers the wrong part of the question. Subtracting the two pressures instead of the two volumes, 32 − 24 = 8, mixes up which quantity the question asks for.
- (b) (2, 4) and (−2, −4) — Substitute y = 2x into x² + y² = 20: x² + (2x)² = 20, which gives x² + 4x² = 20, so 5x² = 20, x² = 4, and x = 2 or x = −2. Using y = 2x for each x-value: x = 2 gives y = 4; x = −2 gives y = −4. The path meets the pond's edge at (2, 4) and (−2, −4). Distractor routes: (2, −4) and (−2, 4) swaps the sign pairing, matching each x-value with the wrong sign of y instead of keeping each x with its own correctly-signed y. (2, 1) and (−2, −1) comes from using y = x/2 instead of y = 2x when finding the y-coordinates. (2, 4) alone stops after the positive square root of x² = 4 and never finds the second point from x = −2.
- (a) 1.8 — E = (1/2)kx² = 0.5 × 40 × 0.3² = 0.5 × 40 × 0.09 = 1.8 joules. 3.6 comes from forgetting the (1/2) at the front, 40 × 0.09. 72 comes from squaring kx together instead of squaring only x, 0.5 × (40 × 0.3)² = 0.5 × 144 = 72. 6 comes from using x instead of x², 0.5 × 40 × 0.3.
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (a) 7.9 m — Method: the iteration converges on the width of the plot, so run the formula three times from the starting value and then add 4 m, because the length is 4 m greater than the width. Working: x₁ = √(30 − 4 × 3) = √18 = 4.24264…; x₂ = √(30 − 4 × 4.24264…) = √13.02943… = 3.60963…; x₃ = √(30 − 4 × 3.60963…) = √15.56147… = 3.94480…. The estimate for the length is 3.94480… + 4 = 7.94480…, which is 7.9 m correct to 1 decimal place. Answer: 7.9 m. The iteration is still oscillating at x₃, so this is the estimate that three uses of the formula give, not a settled value. The distractors: 3.9 m is x₃ itself, the width, given by a candidate who runs the iteration correctly and then stops before the step the question actually asks for; 7.6 m uses x₂ in place of x₃, one use of the formula short, and then adds the 4 m correctly; 15.8 m multiplies the width by 4 instead of adding 4 m to it, reading greater than as a multiplier.
- (c) Fastest at t = 2 min — steepest gradient. — The rate of cooling is given by the size (magnitude) of the gradient, ignoring its sign — the steeper the tangent, the faster the temperature is changing. Of −8, −3 and −0.5, the gradient −8 has the greatest magnitude, so the tea is cooling fastest at t = 2 minutes. 'Fastest at t = 20 min — largest gradient' confuses the signed value with the size of the rate: −0.5 is the largest NUMBER of the three, but it's the smallest in magnitude, meaning the tea is barely cooling at all by then. 'Cools at the same rate throughout' ignores that the three gradients are different sizes, not just all negative. 'Fastest at t = 10 min — the middle reading' isn't a mathematical reason at all — the gradients themselves have to be compared, not their position in the list.
- (b) 5.00 — Continuing the iteration: x₁ = √(2 × 1 + 15) = √17 = 4.1231, x₂ = √(2 × 4.1231 + 15) = √23.2462 = 4.8214, x₃ = √(2 × 4.8214 + 15) = √24.6428 = 4.9642, x₄ = √(2 × 4.9642 + 15) = √24.9284 = 4.9928, and the values keep climbing towards 5.00 as n increases (the limit L satisfies L² = 2L + 15, so L² − 2L − 15 = 0, giving L = 5). Choosing 4.99 stops after x₄, one iteration before the value has settled fully to 5.00. Choosing 17.00 uses the value under the very first square root (2 × 1 + 15 = 17) as if that number itself were the limit. Choosing 1.00 assumes the sequence never moves from the starting value x₀.
Build your own mix at the worksheet builder.