Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) 45 — v = s ÷ t = 180 ÷ 4 = 45 km/h. 720 comes from multiplying s and t instead of dividing, 180 × 4. 184 comes from adding s and t instead of dividing, 180 + 4. 176 comes from subtracting t from s instead of dividing, 180 − 4.
- (c) (3, 9) — Reflecting in the horizontal line y = 2 keeps the x-coordinate the same and maps y to 2 × 2 − y = 4 − (−5) = 9, so S = (3, 9). A candidate who uses k − y instead of 2k − y gets 2 − (−5) = 7, giving (3, 7). A candidate who reflects in the x-axis instead of the line y = 2, simply changing the sign of y, gets (3, 5). A candidate who also changes the sign of the x-coordinate, as if reflecting in both axes, gets (−3, 9).
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (a) 36 km/h — Speed is distance ÷ time. Convert 25 minutes to hours: 25 ÷ 60 = 5/12 hours. Then 15 ÷ (5/12) = 15 × 12/5 = 36 km/h. Dividing 15 by 25 without converting minutes to hours gives 0.6 km/h. Multiplying 15 by 25/60 instead of dividing by it gives 6.25 km/h. Working out the speed in km per minute, 0.6, and then multiplying by 24 instead of 60 gives 14.4 km/h.
- (d) x² − 7x − 3 = 0 — Method: an iteration settles where the next value equals the one before it, so both can be written as the same letter x; replace every xₙ by x, square both sides to clear the square root, and collect all the terms on one side. Working: x = √(7x + 3) gives x² = 7x + 3 on squaring both sides; subtracting 7x and 3 from both sides gives x² − 7x − 3 = 0. Answer: x² − 7x − 3 = 0. The distractors: x² + 7x − 3 = 0 moves the 7x across the equals sign without changing its sign; x² − 7x + 3 = 0 makes that same slip on the constant instead, leaving the 3 positive as it crosses; x² − 7x − 9 = 0 squares the expression term by term, squaring the 3 to give 9 as though squaring √(7x + 3) gave 7x + 9, which is the (a + b)² = a² + b² mistake dressed as a square root.
- (d) 2.7 — The height after 3 years of 10% compound growth is 2 × 1.1³ = 2.662 m, which rounds to 2.7 m. A candidate who adds 10% of the original height (0.2 m) in each of the 3 years, instead of compounding on the new height each time, would reach 2 + 3×0.2 = 2.6 m. A candidate who compounds for only 2 years would reach 2 × 1.1² = 2.42 m, rounding to 2.4 m. A candidate who compounds for 4 years instead of 3 would reach 2 × 1.1⁴ = 2.928 m, rounding to 2.9 m.
- (c) x = −2 or x = 4 — The solutions of x² − 2x − 8 = 0 are the x-values where y = 0. From the table, y = 0 when x = −2 and when x = 4, so those are the two solutions. Distractor origins: x = −1 or x = 3 picks the pair of x-values that give equal (but non-zero) y-values instead of y = 0; x = 0 or x = −8 mixes up an x-value with its corresponding y-value; x = −2 only reads off one of the two roots and misses the other.
- (d) 23 — Method: let the smallest integer be n, so the three consecutive integers are n, n + 1 and n + 2. Form the equation n + (n + 1) + (n + 2) = 72. Working: simplify the left side: 3n + 3 = 72, so 3n = 69, giving n = 23. Answer: 23. 24 comes from dividing 72 by 3 directly, 72 ÷ 3 = 24, which finds the middle integer rather than realising the three numbers differ. 25 comes from correctly finding n = 23 but reading off the largest integer, n + 2, instead of the smallest as asked. 21 comes from dividing first and subtracting after, (72 ÷ 3) − 3, instead of subtracting 3 before dividing by 3.
- (b) 1.6 m/s² — Acceleration is the change in velocity divided by the time taken: (11 − 3) ÷ 5 = 8 ÷ 5 = 1.6 m/s². Forgetting to subtract the initial velocity and dividing the final velocity by the time instead gives 11 ÷ 5 = 2.2 m/s². Inverting the fraction, dividing the time by the change in velocity, gives 5 ÷ 8 = 0.625 m/s². Finding the change in velocity, 8 m/s, but stopping without dividing by the time gives 8 m/s².
- (a) £50 — Substituting x = 200 into y = 0.15x + 20 gives y = 0.15 × 200 + 20 = 30 + 20 = £50. A candidate who forgets to add the standing charge would get only 0.15 × 200 = £30. A candidate who misplaces the decimal point in the rate, using 1.5 instead of 0.15, would get 1.5 × 200 + 20 = £320. A candidate who swaps the roles of the rate and the number of units would work out 0.15 × 20 + 200 = £203.
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
- (d) 37.0 — C = 5(98.6 − 32) ÷ 9 = 5 × 66.6 ÷ 9 = 333 ÷ 9 = 37.0. A candidate who forgets to subtract 32 first gets 5 × 98.6 ÷ 9 = 54.8 (1 d.p.). A candidate who forgets the 5 ÷ 9 factor entirely and just works out F − 32 gets 66.6. A candidate who multiplies by 9 ÷ 5 instead of 5 ÷ 9 gets 66.6 × 9 ÷ 5 = 119.9 (1 d.p.).
- (d) £20 — Let f be the joining fee and m the monthly fee: f + 3m = 100 and f + 6m = 160. Subtracting the first equation from the second eliminates f: 3m = 60, so m = 20. A candidate who finds the joining fee instead of the monthly fee would get f = 100 − 3(20) = £40. A candidate who divides Ben's total by his number of months, ignoring that part of the cost is a fixed joining fee, would get 160 ÷ 6 ≈ £26.67. A candidate who divides the difference in cost by the total number of months instead of the difference in months would get (160 − 100) ÷ 9 ≈ £6.67.
- (d) £16.70 — The mileage charge is 2.20 × 6 = £13.20. Adding the fixed fee: £13.20 + £3.50 = £16.70. A candidate who forgets the fixed fee gives just the mileage charge, £13.20. A candidate who adds the fixed fee to the per-mile rate before multiplying by the number of miles, (3.50 + 2.20) × 6, gets £34.20. A candidate who rounds £2.20 down to £2 gets 2 × 6 + 3.50 = £15.50.
- (b) x ≥ 5 — Expand the bracket: 2(3x − 1) = 6x − 2, so the inequality is 6x − 2 ≥ 4x + 8. Subtract 4x from both sides and add 2 to both sides: 2x ≥ 10. Divide both sides by 2: x ≥ 5. A candidate who only multiplies the 3x by 2 and forgets to multiply the −1 gets 6x − 1 ≥ 4x + 8, leading to x ≥ 4.5. A candidate who adds 4x instead of subtracting it gets 10x ≥ 10, leading to x ≥ 1. A candidate who multiplies by 2 instead of dividing gets x ≥ 20.
Build your own mix at the worksheet builder.