Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) x = 4 or x = −4 — Method: divide both sides by 2 to get x² = 16, then take the square root of both sides: x = 4 or x = −4. Distractor origins: x = 4 forgets the negative root; x = 8 comes from halving 16 instead of taking its square root; x = 16 stops at x² = 16 without ever taking the square root.
- (d) 3 and 4 — f(3) = 3³ − 3 × 3² − 4 = 27 − 27 − 4 = −4, and f(4) = 4³ − 3 × 4² − 4 = 64 − 48 − 4 = 12. Since f(3) is negative and f(4) is positive, there is a change of sign, so the solution lies between 3 and 4. A sign slip when expanding −3x², treating it as +3x², gives f(3) = 27 + 27 − 4 = 50, a positive value; taken with the correctly negative f(2) = 8 − 12 − 4 = −8, this reads as a change of sign between 2 and 3. The same sign slip applied at x = 1 gives f(1) = 1 + 3 − 4 = 0, read as the point the sign changes, against f(0) = 0 + 0 − 4 = −4, giving 0 and 1. Shifting the correctly found interval up by one integer, an indexing slip, reports the change as lying between 4 and 5 instead of 3 and 4.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (d) 5 — Method: rearrange the formula to make m the subject, then substitute F = 15.50. Working: F = 3 + 2.5m, so subtracting 3 from both sides gives F − 3 = 2.5m, then dividing by 2.5 gives m = (F − 3) / 2.5. Substituting F = 15.50: m = (15.50 − 3) / 2.5 = 12.50 / 2.5 = 5. The value 6.2 comes from dividing 15.50 by 2.5 without subtracting the fixed £3 first. The value 3.2 comes from dividing first and subtracting afterwards, in the wrong order: (15.50 / 2.5) − 3 = 3.2. The value 7.4 comes from adding £3 instead of subtracting it before dividing: (15.50 + 3) / 2.5 = 7.4.
- (d) It has a solution between x = 2.2 and x = 2.3 — Since f(2.2) is negative and f(2.3) is positive, the graph of f crosses the x-axis somewhere between x = 2.2 and x = 2.3, so the equation has a solution in that interval. Choosing 'between x = −2.2 and x = −2.3' confuses the negative f-VALUE at 2.2 with a negative x-value. Choosing 'no solution' misreads a change of sign as meaning the opposite of what it shows. Choosing 'exactly two solutions' assumes a single change of sign must give two roots, which is not what the rule guarantees.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (b) 118 m — Width = 840 ÷ 35 = 24 m. Perimeter = 2 × (length + width) = 2 × (35 + 24) = 2 × 59 = 118 m. The option 59 m gives the sum of the length and width but forgets to double it for the perimeter. The option 70 m doubles only the length (2 × 35 = 70) and leaves out the width entirely. The option 48 m doubles only the width (2 × 24 = 48) and leaves out the length entirely.
- (c) 2 — At x = 1, y = 1² − 3(1) = 1 − 3 = −2. At x = 4, y = 4² − 3(4) = 16 − 12 = 4. Gradient of the chord = change in y ÷ change in x = (4 − (−2)) ÷ (4 − 1) = 6 ÷ 3 = 2. Writing down the change in y, 6, and stopping there without dividing by the change in x gives 6. Losing the negative sign on y = −2 at x = 1 and treating it as +2 gives (4 − 2) ÷ (4 − 1) = 2 ÷ 3 = 2/3. Dividing the wrong way round, change in x ÷ change in y, gives (4 − 1) ÷ (4 − (−2)) = 3 ÷ 6 = 1/2.
- (c) 4 years — The yearly multiplier is 1 − 0.12 = 0.88. After 1 year: 2400 × 0.88 = 2112. After 2 years: 2112 × 0.88 = 1858.56. After 3 years: 1858.56 × 0.88 = 1635.5328. After 4 years: 1635.5328 × 0.88 = 1439.27 (2 d.p.), which is the first value below £1,500 — so it takes 4 complete years. Stopping after 3 years, where the value is still £1,635.53, above £1,500, gives 3 years — wrong, because the threshold has not been crossed yet at that point. Continuing for one year longer than needed gives 5 years — wrong, because the value has already fallen below £1,500 by year 4, so year 5 overcounts. Multiplying by the percentage itself instead of by the multiplier — using 0.12 in place of 0.88 — gives 2400 × 0.12 = £288 after a single year, apparently below £1,500 straight away, so 1 year — wrong, because 12% is the part lost each year, and the part left is 88%, so the multiplier is 0.88.
- (d) x + y = 7 — The midpoint of AB is (−1 + 5)/2, (2 + 8)/2, which is (2, 5). The gradient of AB is (8 − 2)/(5 − (−1)) = 6/6 = 1. The perpendicular bisector has gradient −1 and passes through (2, 5): y − 5 = −(x − 2), which rearranges to x + y = 7. Distractor routes: x − y = −3 uses the gradient of AB itself, 1, rather than its negative reciprocal, giving a line PARALLEL to AB through the midpoint instead of perpendicular to it. x + y = 12 comes from adding the y-coordinates, 2 + 8 = 10, but forgetting to divide by 2, using the midpoint (2, 10) instead of (2, 5). x + y = 4 comes from using A's x-coordinate, −1, directly instead of averaging it with B's, giving the point (−1, 5) instead of the true midpoint (2, 5).
- (b) 1.6 m/s² — Acceleration is the change in velocity divided by the time taken: (11 − 3) ÷ 5 = 8 ÷ 5 = 1.6 m/s². Forgetting to subtract the initial velocity and dividing the final velocity by the time instead gives 11 ÷ 5 = 2.2 m/s². Inverting the fraction, dividing the time by the change in velocity, gives 5 ÷ 8 = 0.625 m/s². Finding the change in velocity, 8 m/s, but stopping without dividing by the time gives 8 m/s².
- (d) t = 5 — The maximum height occurs halfway between the two times when the ball is at ground level: the midpoint of t = 1 and t = 9 is (1 + 9) ÷ 2 = 5, so the ball reaches its maximum height at t = 5 seconds. Getting t = 4 comes from halving the DIFFERENCE between the times, 9 − 1 = 8, then 8 ÷ 2 = 4, instead of finding their midpoint. Getting t = 8 uses that difference, 9 − 1 = 8, as if the gap between the two times were itself the time of the maximum. Getting t = 10 adds the two times, 1 + 9 = 10, but forgets to divide by 2.
- (c) 6,400 — 9 hours contains 9 ÷ 3 = 3 whole periods of doubling, so the population is 800 × 2³. Since 2³ = 8, the population after 9 hours is 800 × 8 = 6,400. Adding 100% growth three times instead of compounding it — treating the growth as simple, not repeated doubling — gives 800 × 4 = 3,200, which is wrong because each period doubles the CURRENT population, not the original one. Using 9 as the power instead of dividing by the 3-hour period first gives 800 × 2⁹ = 409,600, which is wrong because the exponent counts periods, not hours. Giving the growth factor 2³ = 8 on its own, without multiplying by the starting population 800, leaves the answer as 8, which is wrong because the question asks for the population, not the multiplier. Always check that your final number of periods matches the total time divided by the period length.
- (d) £20 — Let f be the joining fee and m the monthly fee: f + 3m = 100 and f + 6m = 160. Subtracting the first equation from the second eliminates f: 3m = 60, so m = 20. A candidate who finds the joining fee instead of the monthly fee would get f = 100 − 3(20) = £40. A candidate who divides Ben's total by his number of months, ignoring that part of the cost is a fixed joining fee, would get 160 ÷ 6 ≈ £26.67. A candidate who divides the difference in cost by the total number of months instead of the difference in months would get (160 − 100) ÷ 9 ≈ £6.67.
- (b) 3 — At the limit, L = √(2L + 3). Squaring both sides: L² = 2L + 3, so L² − 2L − 3 = 0, which factorises as (L − 3)(L + 1) = 0, giving L = 3 or L = −1. Since the sequence of iterates stays positive throughout, the limit is L = 3. Taking the other, negative root without rejecting it gives −1. Treating the equation L = 2L + 3 as already linear, forgetting to square both sides first, gives −L = 3, so L = −3. A sign error when factorising, writing (L + 3)(L − 1) = 0 instead of (L − 3)(L + 1) = 0, gives L = 1.
Build your own mix at the worksheet builder.