Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) 4.30 — Method: substitute the starting value into the right-hand side to get x₁, then feed each value back in, keeping the whole display and respecting the order of operations, which divides before it subtracts. Working: x₁ = 5 − 3 ÷ 2.5 = 5 − 1.2 = 3.8; x₂ = 5 − 3 ÷ 3.8 = 5 − 0.78947… = 4.21052…; x₃ = 5 − 3 ÷ 4.21052… = 5 − 0.7125 = 4.2875; x₄ = 5 − 3 ÷ 4.2875 = 5 − 0.69970… = 4.30029…, which is 4.30 correct to 3 significant figures. Answer: 4.30. The distractors: 4.29 is x₃ = 4.2875 rounded, reached by counting the starting value itself as the first iterate and so stopping one use of the formula early; 3.80 is x₁, the value after a single use of the formula; 2.50 comes from working out (5 − 3) ÷ xₙ instead of 5 − (3 ÷ xₙ), subtracting before dividing, which produces the sequence 0.8, 2.5, 0.8, 2.5 and lands on 2.5 at the fourth step.
- (c) 6,400 — 9 hours contains 9 ÷ 3 = 3 whole periods of doubling, so the population is 800 × 2³. Since 2³ = 8, the population after 9 hours is 800 × 8 = 6,400. Adding 100% growth three times instead of compounding it — treating the growth as simple, not repeated doubling — gives 800 × 4 = 3,200, which is wrong because each period doubles the CURRENT population, not the original one. Using 9 as the power instead of dividing by the 3-hour period first gives 800 × 2⁹ = 409,600, which is wrong because the exponent counts periods, not hours. Giving the growth factor 2³ = 8 on its own, without multiplying by the starting population 800, leaves the answer as 8, which is wrong because the question asks for the population, not the multiplier. Always check that your final number of periods matches the total time divided by the period length.
- (a) 6x + 12 — A regular hexagon has 6 equal sides, so the perimeter is 6(x + 2) = 6x + 12. A candidate who multiplies only the x-term by 6 and forgets to multiply the 2 gets 6x + 2. A candidate who multiplies only the number term by 6 and forgets to multiply the x gets x + 12. A candidate who adds 6 and 2 to make a single coefficient of x instead of expanding the brackets gets 8x.
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
- (c) 21.6 — m² = (−2.4)² = 5.76, since a negative number squared is positive, so 5m² = 28.8. Then 3m = 3 × (−2.4) = −7.2. Total: 28.8 + (−7.2) = 21.6. −36 comes from taking m² as negative, 5 × (−5.76) − 7.2 = −36, forgetting that squaring removes the negative sign. 36 comes from ignoring the negative sign on m altogether and using m = 2.4 throughout. 29.4 comes from treating 3m as 3 + m instead of 3 × m, giving 28.8 + (3 + (−2.4)).
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (d) It has a solution between x = 2.2 and x = 2.3 — Since f(2.2) is negative and f(2.3) is positive, the graph of f crosses the x-axis somewhere between x = 2.2 and x = 2.3, so the equation has a solution in that interval. Choosing 'between x = −2.2 and x = −2.3' confuses the negative f-VALUE at 2.2 with a negative x-value. Choosing 'no solution' misreads a change of sign as meaning the opposite of what it shows. Choosing 'exactly two solutions' assumes a single change of sign must give two roots, which is not what the rule guarantees.
- (b) 1.50 — Substituting (0, 8) gives A = 8, since r⁰ = 1. Substituting (2, 18) gives 8 × r² = 18, so r² = 18 ÷ 8 = 2.25. Taking the square root of 2.25 gives r = 1.50 (2 d.p.). Stopping after finding r² and giving 2.25 as the final answer, without taking the square root, is wrong because r² is not the same as r. Dividing r² by the exponent 2 instead of taking its square root — treating the power as something you divide by rather than root — gives 2.25 ÷ 2 = 1.13 (2 d.p.), which is wrong. Inverting the ratio, working out 8 ÷ 18 instead of 18 ÷ 8, gives 0.44 (2 d.p.), which is wrong because the LATER value must be divided by the EARLIER one to find the growth multiplier, not the other way round.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (c) x + 3 — Expand the bracket: 0.5(4x + 6) = 2x + 3. Then subtract the x: 2x + 3 − x = x + 3. The option 2x + 3 comes from expanding the bracket correctly but then forgetting to subtract the x at all. The option x + 6 comes from forgetting to multiply the 6 inside the bracket by 0.5 (treating it as 2x + 6), then subtracting x. The option 3x + 3 comes from adding the x instead of subtracting it: 2x + 3 + x = 3x + 3.
- (d) x₂ closer: f(x₂) = 0.0225, nearer to 0 — f(2.6) = 2.6² − 7 = 6.76 − 7 = −0.24, and f(2.65) = 2.65² − 7 = 7.0225 − 7 = 0.0225. The closer a value of x is to the root, the closer f(x) is to zero — regardless of sign. Since |0.0225| = 0.0225 is much smaller than |−0.24| = 0.24, x₂ = 2.65 is closer to the root. 'x₁ closer: −0.24 is the smaller value' comes from comparing the SIGNED values of f(x) rather than their distances from zero — −0.24 is indeed less than 0.0225 as a number, but that does not mean x₁ is closer to the root. 'x₁ closer: f(x₁) negative ⇒ nearer root' invents a rule that a negative f(x) means x is closer to the root; the sign of f(x) only tells you which side of the root x is on, not how close it is. 'x₂ is the exact root, since f(x₂) ≈ 0' misreads f(x₂) = 0.0225 as zero; the true root is √7 ≈ 2.6458, so f(2.65) is close to zero but not equal to it, and x₂ is an approximation, not the exact root.
- (d) 168 m — Split the area under the graph into two parts. The rising section (0 to 8 s) is a triangle: area = 0.5 × 8 × 12 = 48. The constant section, from 8 s to 18 s (10 s), is a rectangle: area = 12 × 10 = 120. Total distance = 48 + 120 = 168 m. Leaving out the 0.5 doubles the triangle, giving 8 × 12 + 120 = 216 m; ignoring the triangle section altogether gives only 120 m; averaging the start and final speeds over the whole 18 seconds, (0 + 12) ÷ 2 = 6, then 6 × 18 = 108 m, wrongly treats the tram as accelerating the whole time, when the graph is flat for the last 10 seconds.
- (a) 4.897 — Method: substitute the starting value into the right-hand side of the formula to get x₁, then feed each new value back in, keeping the whole calculator display every time and rounding only at the very end. Working: x₁ = √(5 × 2 + 2) = √12 = 3.46410…; x₂ = √(5 × 3.46410… + 2) = √19.32050… = 4.39551…; x₃ = √(5 × 4.39551… + 2) = √23.97755… = 4.89668…, which is 4.897 correct to 3 decimal places. Answer: 4.897. The distractors: 4.396 is x₂, written down by a candidate who counts the starting value x₀ as the first iterate and so stops one use of the formula early; 3.464 is x₁, the value after using the formula only once; 5.146 is x₄, one use of the formula too many — the mirror image of the first slip, made by a candidate who labels the first value worked out as x₀ rather than as x₁ and so runs the count a step long.
- (a) −2 m/s² — The gradient of a line through two points is the change in the y-value divided by the change in the x-value: (6 − 22)/(16 − 8) = −16/8 = −2 m/s². The negative sign confirms the deceleration mentioned in the question. Writing 2 m/s² comes from subtracting the velocities in the wrong order, using (22 − 6) instead of (6 − 22), which loses the sign that shows the car is slowing down. Writing −0.5 m/s² comes from inverting the fraction, dividing the change in time by the change in velocity instead of the other way round. Writing −16 m/s² comes from finding the change in velocity, −16, but forgetting to divide by the change in time, 8 seconds.
Build your own mix at the worksheet builder.