Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 3.5 km/h — Average speed is total distance ÷ total time. Total distance = 5 + 9 = 14 km. Total time, including the rest, = 1 + 1 + 2 = 4 hours. So average speed = 14 ÷ 4 = 3.5 km/h. Leaving out the 1 hour rest and dividing by only the 3 hours of walking gives 14 ÷ 3 = 4.67 km/h. Averaging the two separate speeds, 5 km/h and 4.5 km/h, instead of using total distance over total time, gives (5 + 4.5) ÷ 2 = 4.75 km/h. Dividing only the second leg's distance by the total time, 9 ÷ 4 = 2.25 km/h, ignores the first leg's distance.
- (b) 12 years — Method: call the number of years t, add t to both ages, and form an equation from the comparison at that future time. Working: in t years the leader will be 44 + t and the scout will be 16 + t, so 44 + t = 2(16 + t); expanding gives 44 + t = 32 + 2t, and subtracting t and 32 from both sides gives t = 12. Checking: in 12 years the leader will be 56 and the scout 28, and 56 = 2 × 28. Answer: 12 years. The distractors: 6 years comes from halving the leader's present age instead, so that the scout has to reach 22, which takes 6 years; 14 years comes from halving the 28-year gap between the two ages; 28 years comes from giving the age gap itself as the number of years.
- (a) 1.36 — Method: put the starting value into the right-hand side to get x₁, feed that value back in to get x₂, and round only once the second value has been found. Working: x₁ = 5 ÷ (1 + 2) = 5 ÷ 3 = 1.66666…; x₂ = 5 ÷ (1.66666… + 2) = 5 ÷ 3.66666… = 1.36363…. The digit in the third decimal place is 3, so x₂ = 1.36 correct to 2 decimal places. Answer: 1.36. The distractors: 1.67 is x₁, the value after a single use of the formula, given by a candidate who counts the starting value itself as x₁; 1.49 is x₃ = 1.48648…, one use of the formula too many; 1.37 comes from writing x₁ down as 1.66, truncating the display instead of keeping it in full, and then working out 5 ÷ 3.66 = 1.36612…, which rounds up to 1.37.
- (c) 6 km/h — Total distance = 8 + 4 = 12 km. Total time = 1 hour + 0.5 hours resting + 0.5 hours = 2 hours. Average speed = total distance ÷ total time = 12 ÷ 2 = 6 km/h. A speed of 8 km/h comes from leaving the resting time out of the total time: 12 ÷ 1.5 = 8. A speed of 4 km/h comes from dividing by too much time, such as double-counting the rest period: 12 ÷ 3 = 4. A speed of 12 km/h simply gives the total distance and forgets to divide by the total time at all.
- (c) 81 m — Split the velocity-time graph into its three phases. The accelerating phase (0 to 4 s) is a triangle: 1/2 × 4 × 6 = 12. The constant phase (4 s at 6 m/s, for 10 s) is a rectangle: 10 × 6 = 60. The decelerating phase (3 s) is a triangle: 1/2 × 3 × 6 = 9. Total distance: 12 + 60 + 9 = 81 m. Forgetting the final decelerating phase entirely and adding only the first two areas gives 12 + 60 = 72 m. Treating all three phases as rectangles, forgetting to halve either triangular phase, gives 4 × 6 + 10 × 6 + 3 × 6 = 102 m. Halving only the deceleration triangle correctly but treating the acceleration phase as a rectangle too gives 4 × 6 + 60 + 9 = 93 m.
- (b) x ≥ 5 — Expand the bracket: 2(3x − 1) = 6x − 2, so the inequality is 6x − 2 ≥ 4x + 8. Subtract 4x from both sides and add 2 to both sides: 2x ≥ 10. Divide both sides by 2: x ≥ 5. A candidate who only multiplies the 3x by 2 and forgets to multiply the −1 gets 6x − 1 ≥ 4x + 8, leading to x ≥ 4.5. A candidate who adds 4x instead of subtracting it gets 10x ≥ 10, leading to x ≥ 1. A candidate who multiplies by 2 instead of dividing gets x ≥ 20.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (c) 496 — d = 0.4v² + 6. First v² = 35 × 35 = 1225. Then 0.4 × 1225 = 490. Add 6: 490 + 6 = 496 m. 490 comes from forgetting to add the 6 at the end. 202 comes from squaring 0.4v together instead of squaring only v, (0.4 × 35)² + 6 = 14² + 6 = 202. 20 comes from using v instead of v², 0.4 × 35 + 6.
- (b) 58.8 km/h — Total distance = 100 + 47 = 147 km. Total time = 1.5 + 0.25 + 0.75 = 2.5 hours. Average speed = 147 ÷ 2.5 = 58.8 km/h. Leaving out the 0.25 hours of waiting from the total time gives 147 ÷ 2.25 = 65.3 km/h (1 d.p.) — wrong, because the train is stationary but time is still passing on the whole journey. Using only the first leg gives 100 ÷ 1.5 = 66.7 km/h (1 d.p.) — wrong, because it ignores the second leg of the journey entirely. Working out each leg's own speed (100 ÷ 1.5 = 66.7 km/h and 47 ÷ 0.75 = 62.7 km/h) and then averaging those two speeds gives 64.7 km/h (1 d.p.) — wrong, because the average of two speeds over DIFFERENT times is not the same as total distance divided by total time.
- (c) 22 — p² means p × p. Substitute p = 2.5: p² = 6.25, so 4p² = 4 × 6.25 = 25, and 25 − 3 = 22. 97 comes from squaring 4p together instead of just p, (4 × 2.5)² − 3 = 10² − 3 = 97. 7 comes from using p instead of p², 4 × 2.5 − 3. 1 comes from squaring the 3 instead of the p, 4 × 2.5 − 3².
- (a) 4 — The gradient of a straight line through two points is the change in y divided by the change in x. Change in y = 21 − 5 = 16. Change in x = 6 − 2 = 4. Gradient = 16 ÷ 4 = 4. Dividing x by y instead of y by x gives 0.25; forgetting to divide by the change in x at all leaves 16; dividing by only one of the two x-coordinates, 16 ÷ 2 = 8, uses the wrong denominator.
- (c) 4.30 — Method: substitute the starting value into the right-hand side to get x₁, then feed each value back in, keeping the whole display and respecting the order of operations, which divides before it subtracts. Working: x₁ = 5 − 3 ÷ 2.5 = 5 − 1.2 = 3.8; x₂ = 5 − 3 ÷ 3.8 = 5 − 0.78947… = 4.21052…; x₃ = 5 − 3 ÷ 4.21052… = 5 − 0.7125 = 4.2875; x₄ = 5 − 3 ÷ 4.2875 = 5 − 0.69970… = 4.30029…, which is 4.30 correct to 3 significant figures. Answer: 4.30. The distractors: 4.29 is x₃ = 4.2875 rounded, reached by counting the starting value itself as the first iterate and so stopping one use of the formula early; 3.80 is x₁, the value after a single use of the formula; 2.50 comes from working out (5 − 3) ÷ xₙ instead of 5 − (3 ÷ xₙ), subtracting before dividing, which produces the sequence 0.8, 2.5, 0.8, 2.5 and lands on 2.5 at the fourth step.
- (c) £2.80 — 3n + 1.50 = 9.90, so 3n = 8.40 and n = 2.80, so each notebook costs £2.80. A candidate who forgets to subtract the cost of the pen and divides the total by 3 gets n = 9.90 ÷ 3 = £3.30. A candidate who adds the cost of the pen instead of subtracting it gets 3n = 11.40 and n = £3.80. A candidate who treats the pen as a fourth notebook and divides the total by 4 gets n = 9.90 ÷ 4 = £2.48 (2 d.p.).
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (c) Week 16, £37,000 — y = f(x − 6) − 8000 combines a horizontal translation of 6 units RIGHT (subtracting 6 inside the brackets) with a vertical translation of £8000 DOWN (subtracting 8000 outside). Applying both to the maximum (10, 45000): 10 + 6 = 16, so the new maximum is in week 16. And 45000 − 8000 = 37000, so the maximum weekly profit is £37,000.
Build your own mix at the worksheet builder.