Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (c) x = 0 or x = 3 — Method: take out the common factor 5x: 5x(x − 3) = 0, so 5x = 0 or x − 3 = 0, giving x = 0 or x = 3. Distractor origins: x = 0 or x = 15 comes from forgetting to divide the second term by the common factor 5x correctly, leaving 15 instead of 3; x = 3 loses the solution x = 0 by dividing both sides by x; x = 5 or x = 3 mistakes the coefficient 5 itself for one of the solutions.
- (a) 25 — Gradient = change in y ÷ change in x = (100 − 0) ÷ (4 − 0) = 100 ÷ 4 = 25. Dividing time by distance instead of distance by time gives 0.04; multiplying the two values instead of dividing gives 400; stopping at the change in distance, 100, forgets to divide by the change in time.
- (c) 50 — Method: the edge of the track is a circle centred on the origin, so it has equation x² + y² = r²; use the floodlight whose coordinates are given to find r², then substitute x = 0 to find where that circle meets the positive y-axis. Working: 30² + 40² = 900 + 1600 = 2500, so the edge of the track is x² + y² = 2500. Substituting x = 0 gives k² = 2500, so k = √2500 = 50, taking the positive root because k is positive. Answer: k = 50. The distractors: 2500 is r² used as though it were the radius, which would place the second floodlight fifty times too far from the centre; 70 adds the two coordinates, 30 + 40, instead of adding their squares; 40 takes the y-coordinate of the first floodlight to be the radius, which would only be true if that floodlight stood on the y-axis itself.
- (b) 4 — Method: form the equation 30 + 25h = 130, where h is the number of hours, then solve for h. Working: subtract the call-out fee from the total bill: 25h = 130 − 30 = 100. Divide by the hourly rate: h = 100 ÷ 25 = 4. Answer: 4 hours. 5.2 comes from dividing the whole bill by the hourly rate without subtracting the fixed fee first, 130 ÷ 25. 3.5 comes from swapping the fee and the rate, subtracting the rate from the bill and dividing by the fee, (130 − 25) ÷ 30. 6.4 comes from adding the call-out fee to the bill instead of subtracting it, before dividing by the rate, (130 + 30) ÷ 25.
- (d) 23 — Method: let the smallest integer be n, so the three consecutive integers are n, n + 1 and n + 2. Form the equation n + (n + 1) + (n + 2) = 72. Working: simplify the left side: 3n + 3 = 72, so 3n = 69, giving n = 23. Answer: 23. 24 comes from dividing 72 by 3 directly, 72 ÷ 3 = 24, which finds the middle integer rather than realising the three numbers differ. 25 comes from correctly finding n = 23 but reading off the largest integer, n + 2, instead of the smallest as asked. 21 comes from dividing first and subtracting after, (72 ÷ 3) − 3, instead of subtracting 3 before dividing by 3.
- (a) They always charge the same, since 3(2n + 4) = 6n + 12. — Expand Advert A's formula by multiplying both terms inside the bracket by 3: 3 × 2n = 6n, and 3 × 4 = 12, giving 3(2n + 4) = 6n + 12, which is identical to Advert B's formula — so the two adverts always charge the same amount, whatever n is. Getting 6n + 4 comes from multiplying the 2n by 3 but leaving the 4 unmultiplied. Getting 2n + 7 comes from adding 3 to the bracket instead of multiplying by it. Saying it depends on n avoids expanding the bracket at all — once expanded, both formulas are identical for every value of n, so the cost can be compared directly.
- (a) 4n + 1 — Method: find the increase in cost per hour, then find the constant by adjusting the 1-hour cost. Working: the cost goes up by £4 for each extra hour (9 − 5 = 4), so the coefficient of n is 4. The constant is the 1-hour cost minus the common difference: 5 − 4 = 1. Answer: the nth term is 4n + 1. 4n + 5 comes from using the 1-hour cost, 5, as the constant without subtracting the common difference. 4n − 3 comes from a slip in working out the constant, subtracting the common difference twice (5 − 4 − 4 = −3) instead of once. n + 4 comes from swapping the hourly increase and the constant.
- (b) £105 — The hourly charge is 25 × 3 = £75. Adding the call-out fee: £75 + £30 = £105. A candidate who forgets the call-out fee gives just the hourly charge, £75. A candidate who adds the call-out fee to the hourly rate before multiplying by the hours, (30 + 25) × 3, gets £165. A candidate who multiplies the call-out fee by the number of hours instead of the hourly rate, 30 × 3, gets £90.
- (b) £47, and T=15+8h is a formula (relates T and h). — The charge is £15 fixed plus £8 for each hour: T=15+8h, so for h=4, T=15+8×4=15+32=47. Because T=15+8h relates two different quantities, the total charge T and the number of hours h, it is a formula, not an equation — an equation is solved for one particular value of an unknown, but this relationship holds for every value of h a job might last. A candidate who forgets to include the fixed £15 fee would compute only 8×4=32. A candidate who adds the three numbers in the formula together instead of multiplying the hourly rate by the number of hours would compute 15+8+4=27. A candidate who correctly finds the charge but mistakes the formula for an equation, treating it as something to be solved for one specific value of h rather than a general relationship between T and h, would pick the correct charge with the wrong classification.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (b) 5.00 — Continuing the iteration: x₁ = √(2 × 1 + 15) = √17 = 4.1231, x₂ = √(2 × 4.1231 + 15) = √23.2462 = 4.8214, x₃ = √(2 × 4.8214 + 15) = √24.6428 = 4.9642, x₄ = √(2 × 4.9642 + 15) = √24.9284 = 4.9928, and the values keep climbing towards 5.00 as n increases (the limit L satisfies L² = 2L + 15, so L² − 2L − 15 = 0, giving L = 5). Choosing 4.99 stops after x₄, one iteration before the value has settled fully to 5.00. Choosing 17.00 uses the value under the very first square root (2 × 1 + 15 = 17) as if that number itself were the limit. Choosing 1.00 assumes the sequence never moves from the starting value x₀.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (c) 12 cm — For a square, area = side². So side² = 144, giving side = ±12. Since a length must be positive, the side length is 12 cm. A candidate who gives both square roots without rejecting the negative one, which cannot be a length, answers 12 cm or −12 cm. A candidate who halves 144 instead of taking its square root gets 72 cm. A candidate who divides 144 by 4, confusing the area formula with a perimeter calculation, gets 36 cm.
- (a) −2 m/s² — The gradient of a line through two points is the change in the y-value divided by the change in the x-value: (6 − 22)/(16 − 8) = −16/8 = −2 m/s². The negative sign confirms the deceleration mentioned in the question. Writing 2 m/s² comes from subtracting the velocities in the wrong order, using (22 − 6) instead of (6 − 22), which loses the sign that shows the car is slowing down. Writing −0.5 m/s² comes from inverting the fraction, dividing the change in time by the change in velocity instead of the other way round. Writing −16 m/s² comes from finding the change in velocity, −16, but forgetting to divide by the change in time, 8 seconds.
- (a) 40 — From 9am to 12 noon is 3 hours, so the population doubles three times: 5 × 2³ = 40. A candidate who counts the elapsed time as 4 hours (an off-by-one counting error) would reach 5 × 2⁴ = 80. A candidate who counts it as only 2 hours would reach 5 × 2² = 20. A candidate who misreads 'doubles' as 'increases by 2' each hour would compute 5 + 3 × 2 = 11.
Build your own mix at the worksheet builder.