Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) An equation, true for one value of x — 2x + 5 = 17 is only true when x = 6, so it is an equation. A candidate who ignores the equals sign and focuses only on the x terms and numbers present picks the expression option. A candidate who sees an equals sign and assumes it must relate two different quantities, as a formula does, picks that option, missing that there is only one quantity, x, involved here. A candidate who wrongly checks whether both sides look similar in structure rather than testing specific values picks the identity option, missing that the two sides are not equal for every value of x.
- (b) x² + y² = 1369 — For a circle centred at the origin, the radius squared equals the sum of the squares of the coordinates of any point on it: r² = 12² + 35² = 144 + 1225 = 1369. The equation is x² + y² = 1369. x² + y² = 2209 comes from adding the coordinates first and then squaring the sum: (12 + 35)² = 47² = 2209, instead of squaring each coordinate separately. x² + y² = 1225 comes from using only 35² and leaving out the 12² term. x² + y² = 144 comes from using only 12² and leaving out the 35² term.
- (b) 58.8 km/h — Total distance = 100 + 47 = 147 km. Total time = 1.5 + 0.25 + 0.75 = 2.5 hours. Average speed = 147 ÷ 2.5 = 58.8 km/h. Leaving out the 0.25 hours of waiting from the total time gives 147 ÷ 2.25 = 65.3 km/h (1 d.p.) — wrong, because the train is stationary but time is still passing on the whole journey. Using only the first leg gives 100 ÷ 1.5 = 66.7 km/h (1 d.p.) — wrong, because it ignores the second leg of the journey entirely. Working out each leg's own speed (100 ÷ 1.5 = 66.7 km/h and 47 ÷ 0.75 = 62.7 km/h) and then averaging those two speeds gives 64.7 km/h (1 d.p.) — wrong, because the average of two speeds over DIFFERENT times is not the same as total distance divided by total time.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (d) 3 and 4 — f(3) = 3³ − 3 × 3² − 4 = 27 − 27 − 4 = −4, and f(4) = 4³ − 3 × 4² − 4 = 64 − 48 − 4 = 12. Since f(3) is negative and f(4) is positive, there is a change of sign, so the solution lies between 3 and 4. A sign slip when expanding −3x², treating it as +3x², gives f(3) = 27 + 27 − 4 = 50, a positive value; taken with the correctly negative f(2) = 8 − 12 − 4 = −8, this reads as a change of sign between 2 and 3. The same sign slip applied at x = 1 gives f(1) = 1 + 3 − 4 = 0, read as the point the sign changes, against f(0) = 0 + 0 − 4 = −4, giving 0 and 1. Shifting the correctly found interval up by one integer, an indexing slip, reports the change as lying between 4 and 5 instead of 3 and 4.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (c) 10 m/s — A symmetric chord gradient uses the two points either side of t = 3: (2, 40) and (4, 60). The gradient is the change in height divided by the change in time: (60 − 40) ÷ (4 − 2) = 20 ÷ 2 = 10 m/s. Using only the values either side of one gap, (2, 40) and (3, 54), instead of the full symmetric chord, gives (54 − 40) ÷ (3 − 2) = 14 m/s. Getting the correct number but dropping the time unit, leaving only metres, gives 10 m. Dividing time by height instead of height by time inverts the calculation to (4 − 2) ÷ (60 − 40) = 0.1 s/m.
- (d) 680 m — First find how long the acceleration takes: acceleration = change in speed ÷ time, so 2.5 = 20 ÷ t, giving t = 20 ÷ 2.5 = 8 seconds. The distance during this phase is the area of a triangle with base 8 and height 20: 1/2 × 8 × 20 = 80 m. The distance during the constant-speed phase is 20 × 30 = 600 m, since distance = speed × time at a constant speed. The total distance is 80 + 600 = 680 m. Using the given 30 seconds for the acceleration phase as well, 1/2 × 30 × 20 = 300, plus the correct 600, gives 900 m — but 30 seconds is only stated for the constant-speed phase. Leaving out the 1/2 and using the full rectangle for the acceleration phase, 8 × 20 = 160, plus the correct 600, gives 760 m — the speed is not constant during acceleration, so this area is a triangle, not a rectangle. Swapping the two times round, and using 8 seconds for the constant-speed distance instead of 30, 20 × 8 = 160, plus the correct triangle area of 80, gives 240 m.
- (d) The cost increases by about £10 per extra item — Gradient = change in cost ÷ change in items = (800 − 400) ÷ (70 − 30) = 400 ÷ 40 = 10. The units of the gradient are £ per item, so the cost is increasing by about £10 for every extra item produced, near x = 50. Subtracting in the wrong order, (400 − 800) ÷ (70 − 30) = −10, gives the right size but the wrong sign — check which point comes first each time. Leaving out the division by 40 gives £400 per item; dividing the wrong way round, 40 ÷ 400 = 0.1, gives £0.10 per item.
- (d) 300 m — For a constant speed, the speed-time graph is a horizontal line, and the area underneath is a rectangle: distance = speed × time = 15 × 20 = 300 m. Adding the two numbers instead of multiplying gives 35 m; dividing instead of multiplying gives 1.33 m; halving the product, as you would for a triangle, gives 7.5 m — but this section of the graph is a rectangle, not a triangle, so there is no halving to do.
- (d) £195 — Substituting x = 3 into y = 45x + 60 gives y = 45 × 3 + 60 = 135 + 60 = 195. A candidate who forgets to add the call-out fee would get only 45 × 3 = £135. A candidate who adds the hours to the fee and the rate instead of multiplying would get 45 + 60 + 3 = £108. A candidate who multiplies both the hourly rate and the call-out fee by the number of hours would get 45 × 3 + 60 × 3 = £315.
- (a) Underestimate: the chord lies below the curve — For a curve that is concave down (bending downward), the straight line joining any two points on the curve lies BELOW the curve. The trapezium's top edge is this straight line, so the trapezium's area is smaller than the true area under the curve — the trapezium rule UNDERESTIMATES the distance in this case. This is because a curve whose gradient keeps decreasing bends away from any chord joining two of its points, dropping the chord below every point of the curve in between. The reverse, a chord lying above the curve, is the rule for a concave-up curve, not this one — check which way the curve bends before deciding. The trapezium rule does not always overestimate or underestimate, and it is not exact except when the graph really is a straight line.
- (c) £9.70 — F = 2.50 + 1.20 × 6 = 2.50 + 7.20 = £9.70. £7.20 comes from forgetting to add the £2.50 fixed charge. £10.20 comes from adding the 2.50 to the number of miles before multiplying by 1.20, 1.20 × (6 + 2.50). £22.20 comes from adding the fixed charge and the rate together first and then multiplying by the miles, (2.50 + 1.20) × 6.
- (a) −2 m/s² — The gradient of a line through two points is the change in the y-value divided by the change in the x-value: (6 − 22)/(16 − 8) = −16/8 = −2 m/s². The negative sign confirms the deceleration mentioned in the question. Writing 2 m/s² comes from subtracting the velocities in the wrong order, using (22 − 6) instead of (6 − 22), which loses the sign that shows the car is slowing down. Writing −0.5 m/s² comes from inverting the fraction, dividing the change in time by the change in velocity instead of the other way round. Writing −16 m/s² comes from finding the change in velocity, −16, but forgetting to divide by the change in time, 8 seconds.
- (b) f(1) = −3 and f(2) = 3 — f(1) = 1³ − 1 − 3 = 1 − 1 − 3 = −3. f(2) = 2³ − 2 − 3 = 8 − 2 − 3 = 3. Since f(1) is negative and f(2) is positive, there is a change of sign, so a solution lies between x = 1 and x = 2. Dropping the −x term entirely gives f(1) = 1 − 3 = −2 and f(2) = 8 − 3 = 5. Using x² instead of x³ throughout gives f(1) = 1 − 1 − 3 = −3, which happens to coincide with the correct value at x = 1, but f(2) = 4 − 2 − 3 = −1, which does not show a change of sign at all. Working out −f(x) instead of f(x), a sign-flip error, gives f(1) = 3 and f(2) = −3, the correct sizes but with both signs reversed.
Build your own mix at the worksheet builder.