Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 8 kg — The cost above the flat £5 charge is 17 − 5 = £12. At £2 per kg, this covers 12 ÷ 2 = 6 kg above the first 2 kg, so the total weight is 2 + 6 = 8 kg. Dividing the full £17 by £2 per kg without first taking off the £5 flat charge gives 17 ÷ 2 = 8.5 kg. Taking off the £5 flat charge and dividing by £2 per kg, but forgetting to add back the 2 kg that the flat charge covers, gives 12 ÷ 2 = 6 kg. Taking off £2 instead of £5 as the flat charge, (17 − 2) ÷ 2 = 7.5 kg, swaps which number is the fixed fee.
- (c) 2 < x < 3 — Factorise x² − 5x + 6 = (x − 2)(x − 3), giving roots x = 2 and x = 3. Since the coefficient of x² is positive, the graph is a U-shape that dips below the x-axis between its roots. So x² − 5x + 6 < 0 for 2 < x < 3. Distractor routes: x < 2 or x > 3 takes the region OUTSIDE the roots, where the graph is above the x-axis, the opposite of what is wanted. 2 ≤ x ≤ 3 uses ≤ instead of the strict < the question asks for, wrongly including the roots themselves, where the expression equals zero, not less than zero. −3 < x < −2 comes from factorising as (x + 2)(x + 3), reversing the sign of both roots.
- (a) Tuesday, by 2 km/h — Monday's speed is 15 ÷ 2.5 = 6 km/h and Tuesday's speed is 12 ÷ 1.5 = 8 km/h, so Tuesday was faster, by 8 − 6 = 2 km/h. A candidate who works out the correct speeds but mislabels which day is faster gets Monday, by 2 km/h. A candidate who divides 15 ÷ 2.5 incorrectly as 5 instead of 6 gets a difference of 8 − 5 = 3 km/h, still crediting Tuesday. A candidate who forgets to find Monday's speed and gives Tuesday's speed itself as the difference states Tuesday, by 8 km/h.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (b) 319 — Substitute n = 10: 3 × 10² + 2 × 10 − 1 = 3 × 100 + 20 − 1 = 300 + 20 − 1 = 319. A sign error on the +2n term, treating it as −2n, gives 300 − 20 − 1 = 279. Working out 3 × 10² + 2 × 10 but forgetting to subtract the final 1 gives 300 + 20 = 320. Using n = 9 instead of n = 10 gives 3 × 81 + 18 − 1 = 243 + 18 − 1 = 260.
- (d) 68, and it is a formula — Substituting C = 20 gives F = 1.8 × 20 + 32 = 36 + 32 = 68. The statement F = 1.8C + 32 is a formula because it expresses a general relationship between F and C that holds for any value of C, not just C = 20. A candidate who gets the correct value but calls it an equation is confusing "has an equals sign" with "is an equation" — an equation is only true for particular value(s) of the unknown, whereas this relationship is used to calculate rather than to be solved. A candidate who forgets to multiply C by 1.8 and just adds 32 to 20 gets 52. A candidate who multiplies correctly but forgets to add 32 gets 36.
- (b) The total volume of water, in litres, that has flowed in. — On a rate-time graph, the y-axis is in litres per minute and the x-axis is in minutes; multiplying a rate by a time gives litres per minute × minutes = litres, a total volume. So the area under the graph represents the total volume of water that has flowed in. Thinking the area itself represents the rate, rather than what the rate accumulates to, gives the wrong claim about the average rate of flow. Confusing the area with the gradient of the graph — which measures how the rate is changing — gives the wrong claim about litres per minute squared. Ignoring the flow-rate axis and focusing only on the time axis gives the wrong claim that the area is simply the total time.
- (a) y = 2ˣ — An exponential graph y = 2ˣ passes through (0, 1) since 2⁰ = 1, rises more and more steeply for positive x, and has the x-axis as an asymptote as x becomes very negative, since 2ˣ gets closer to 0 without ever reaching it. y = x² + 1 also passes through (0, 1) and also rises steeply for positive x, but as x becomes very negative it rises to infinity too, rather than settling towards the x-axis — mistaking any curve that gets steeper for an exponential misses this. y = x³ + 1 passes through (0, 1) and rises for positive x, but as x becomes very negative it falls towards negative infinity rather than approaching the x-axis from above. y = 1 − x² also passes through (0, 1), but it falls for large positive x rather than rising — a candidate who checks only the y-intercept, without reading the described shape of the curve, could pick this.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (c) 37 — The first differences are 3, 5, 7, 9 — they increase by 2 each time (the second difference), so the next first difference is 11, giving 26+11=37. A candidate who repeats the last first difference (9) instead of increasing it would reach 26+9=35. A candidate who increases the difference by 4 instead of 2 would reach 26+13=39. A candidate who adds only the second difference (2) to the last term, instead of the next first difference, would reach 26+2=28.
- (c) 360° — The graph of y = cos x repeats itself every 360°, so its period is 360°. 180° is the period of y = tan x, not y = cos x — confusing the two graphs gives this. 90° is the horizontal distance from a maximum of y = cos x to the next point where the graph crosses the x-axis, a quarter of the period, mistaken for the whole period. 720° comes from counting the interval containing two full repeats of the graph, from one maximum to the second repeat of that maximum, instead of the first.
- (a) x + 14 — Expand each bracket separately: 3(x + 4) = 3x + 12, and −2(x − 1) = −2x + 2 (multiply −2 by both x and −1). Combine: 3x + 12 − 2x + 2 = x + 14. Writing x + 10 comes from taking −2(x − 1) as −2x − 2, not flipping the sign of the −1 inside the bracket. Writing 5x + 10 comes from treating the second bracket as +2(x − 1) instead of subtracting it, so the x-terms are added rather than subtracted. Writing x + 13 comes from only multiplying the 2 by the x, and carrying the −1 across unmultiplied.
- (b) (2, 6) — y = f(x − 3) translates y = f(x) horizontally by 3 units to the RIGHT — inside the brackets, subtracting moves the graph in the positive x-direction. Turning point (−1, 6) → (−1 + 3, 6) = (2, 6). The common slip is to move LEFT instead, since the sign inside the bracket is negative — that gives (−4, 6). Changing the y-coordinate instead of the x-coordinate, as in (−1, 3) or (−1, 9), treats this as a vertical shift, which y = f(x − 3) is not.
- (b) 192 — This is a geometric sequence with first term 3 and common ratio 4: round 2 has 3 × 4 = 12, round 3 has 12 × 4 = 48, round 4 has 48 × 4 = 192. A candidate who applies the ×4 multiplier four times instead of three gets 3 × 4⁴ = 768. A candidate who wrongly treats the growth as arithmetic, taking the round 2 figure of 12 as a fixed amount added each round, gets 3, 15, 27, 39. A candidate who forgets the starting 3 people and just works out 4⁴ gets 256.
- (c) r = √(A/π) — A = πr² means r has been squared and then multiplied by π. To make r the subject, first divide both sides by π to get A/π = r², then take the square root of both sides: r = √(A/π). Writing r = A/π stops after dividing by π and forgets that r is still squared — it never undoes the square. Writing r = √A/π takes the square root before dividing by π, which square-roots only the A and not the whole of A/π. Writing r = (A/π)² squares A/π instead of taking its square root — the opposite of what is needed to undo r². The correct rearrangement is r = √(A/π).
Build your own mix at the worksheet builder.