Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) x = 6 — Method: a minus sign in front of a bracket changes the sign of every term inside it, so expand the bracket first and then simplify. Working: expanding gives 4x − 2x + 6 = 18, which simplifies to 2x + 6 = 18; subtracting 6 from both sides gives 2x = 12, and dividing both sides by 2 gives x = 6. Answer: x = 6. The distractors: x = 12 comes from leaving the −6 unchanged when the bracket is removed, giving 4x − 2x − 6 = 18 and so 2x = 24; x = 24 comes from reaching 2x = 12 correctly and then multiplying by 2 instead of dividing by 2; x = 3 comes from dividing by 2 too early, at 2x + 6 = 18, and dividing only the 2x and the 18 while leaving the 6 untouched, which gives x + 6 = 9.
- (b) y = f(−x) — y = f(−x) reflects the graph of y = f(x) in the y-axis: every x-coordinate changes sign. The x-intercepts −3 and 7 become 3 and −7, matching the second graph's intercepts −7 and 3. A point already on the y-axis is unaffected, since −0 = 0, so the y-intercept (0, 21) stays exactly where it is — matching the second graph as well. y = −f(x) leaves the x-intercepts unchanged at −3 and 7, since f(x) = 0 exactly where −f(x) = 0, which does not match; it also sends the y-intercept to (0, −21), a second mismatch. y = −f(−x) does send the x-intercepts to the right places, −7 and 3, but it sends the y-intercept to (0, −21) instead of (0, 21), so it fails the second clue. y = f(x) − 4 moves every point down 4, sending the y-intercept to (0, 17) instead of (0, 21), so it fails the y-axis clue. Test each option against BOTH clues — the pair of x-intercepts and the point on the y-axis — because more than one option gets only one of the two right.
- (d) 7n − 2 — Method: find how much the total cost rises each month, then find the constant that fits the cost for one month. Working: the cost rises by £7 for each extra month (12 − 5 = 7, 19 − 12 = 7, 26 − 19 = 7), so the cost has the form 7n + c. Substituting n = 1: 7(1) + c = 5, so c = −2. Answer: the total cost in pounds is 7n − 2. The value 7n comes from leaving out the constant. The value 7n + 5 comes from using the cost of one month as the constant directly, without subtracting the monthly rise first. The value 5n + 7 comes from swapping the roles of the cost of one month, £5, and the monthly rise, £7 — using the cost of one month as the coefficient of n and the rise as the constant.
- (c) 4(n + 3) — 'Add 3 to n' must happen before 'multiply the result by 4', so the addition needs brackets to show it happens first: 4(n + 3). Writing 4n + 3 multiplies n by 4 immediately and only adds the 3 afterwards, which reverses the order the words describe. Writing n + 3 × 4 only multiplies the 3 by 4, and adds n as a separate, unmultiplied term — it treats 'the result' as just the 3, not the whole of n + 3. Writing 3(n + 4) keeps the correct structure but swaps which number is added and which is multiplied. The expression for 'add 3 to n, then multiply the result by 4' is 4(n + 3).
- (b) 1.6 m/s² — Acceleration is the change in velocity divided by the time taken: (11 − 3) ÷ 5 = 8 ÷ 5 = 1.6 m/s². Forgetting to subtract the initial velocity and dividing the final velocity by the time instead gives 11 ÷ 5 = 2.2 m/s². Inverting the fraction, dividing the time by the change in velocity, gives 5 ÷ 8 = 0.625 m/s². Finding the change in velocity, 8 m/s, but stopping without dividing by the time gives 8 m/s².
- (d) −2 — y = f(x) − 6 is f(x) shifted down by 6, so every y-value on the graph decreases by 6. At x = 0, f(0) = 4, so the new y-value is 4 − 6 = −2. Adding 6 instead of subtracting gives 10; writing down the shift itself, −6, or leaving the original value 4 unchanged both skip the translation altogether.
- (b) (x − 3)/(x + 2) — Factorise both: x² − 9 = (x − 3)(x + 3) (difference of two squares), and x² + 5x + 6 = (x + 2)(x + 3) (two numbers multiplying to 6 and adding to 5, namely 2 and 3). The factor (x + 3) is common to both, so it cancels, leaving (x − 3)/(x + 2). Choosing −9/(5x + 6) comes from cancelling the x² terms directly without factorising first — x² is not a common factor of the whole numerator or denominator. Choosing (x + 3)/(x + 2) cancels the (x − 3) factor instead of the shared (x + 3) factor, and (x − 3) does not appear in the denominator to cancel with. Choosing x − 3 cancels the whole denominator (x + 2) as though it were equal to 1.
- (d) y = −f(x + 2) has a maximum turning point at (1, 5). — y = f(x + 2) translates the graph 2 units in the negative x-direction, so the turning point's x-coordinate moves from 3 to 1; reflecting in the x-axis then negates the y-coordinate, turning −5 into 5, and also turns a minimum into a maximum — giving a true maximum turning point at (1, 5). Translating the root at x = 1 in the wrong direction, adding 2 instead of subtracting it, gives x = 3, but the true image root is at 1 − 2 = −1, so that statement is false. Keeping the coordinates (1, 5) correct but forgetting that reflecting in the x-axis turns a minimum into a maximum gives a false "minimum turning point" statement. Getting the reflection's effect on the turning-point type right (a maximum) but translating the x-coordinate in the wrong direction, using 3 + 2 = 5 instead of 3 − 2 = 1, gives a false statement at (5, 5).
- (b) 2x + 3 — fg(x) means f(g(x)): apply g first, then apply f to the result. g(x) = 2x, so f(g(x)) = f(2x) = 2x + 3. Writing 2x + 6 comes from working out gf(x) instead — g(f(x)) = g(x + 3) = 2(x + 3) = 2x + 6 — which applies the functions in the wrong order. Writing 3x + 3 comes from adding f(x) and g(x) together, (x + 3) + 2x = 3x + 3, instead of composing them. Writing 2x² + 6x comes from multiplying f(x) and g(x) together, (x + 3)(2x) = 2x² + 6x, instead of substituting one into the other.
- (a) 8 — Method: rate = height gained ÷ time taken. Working: height gained = 52 − 20 = 32 m, time taken = 4 minutes, so rate = 32 ÷ 4 = 8 metres per minute. Answer: the rate is 8 metres per minute. 32 comes from working out the height gained but forgetting to divide by the time taken. 13 comes from dividing the final height, 52, by the time taken instead of the height gained. 5 comes from dividing the starting height, 20, by the time taken instead of the height gained.
- (a) 8 — f(x − 1) means every input to f is reduced by 1 before it is looked up. At x = 2, the input to f becomes 2 − 1 = 1, so f(x − 1) at x = 2 is f(1) = 8. Reading f(2) = 4 directly from the table, without applying the shift, gives 4. Shifting in the wrong direction, using x + 1 = 3 instead of x − 1 = 1, gives f(3) = 1. Confusing f(x − 1) with f(x) − 1 — taking f(2) = 4 and then subtracting 1 — gives 3.
- (a) Litres — The area under a graph is found by multiplying a y-value by an x-value, so its units are the y-axis units multiplied by the x-axis units: litres per minute × minutes = litres, since the 'per minute' cancels with the 'minutes'. Answering 'litres per minute' keeps the y-axis units unchanged, as if multiplying by time did nothing to the units at all. Answering 'litres per minute squared' treats the x-axis as also being measured 'per minute', squaring a unit that should instead cancel. Answering 'minutes' keeps only the x-axis units and drops the rate altogether.
- (d) 28 — The height decreases by 8 cm at each bounce after the first, so the nth bounce reaches 60−(n−1)×8 cm. For the 5th bounce: 60−4×8=60−32=28. A candidate who subtracts 8 one time too many, five times instead of four, would compute 60−5×8=20. A candidate who adds the decrease instead of subtracting it, a sign error, would compute 60+4×8=92. A candidate who works out only the total decrease and forgets to include the starting height of 60 cm would compute just 5×8=40.
- (b) (0, −2) — Method: a translation acts on the two coordinates separately: moving right or left changes the x-coordinate only, moving up or down changes the y-coordinate only, and right and up add while left and down subtract. Working: the point starts at (−4, 7); moving 4 units to the right gives an x-coordinate of −4 + 4 = 0; moving 9 units down gives a y-coordinate of 7 − 9 = −2. Answer: (0, −2). The distractors: (5, 3) comes from pairing each number with the wrong coordinate, adding 9 to −4 and taking 4 from 7; (0, 16) comes from treating 'down' as an addition, giving 7 + 9 = 16 for the second coordinate; (−8, −2) comes from treating 'to the right' as a subtraction, giving −4 − 4 = −8 for the first coordinate.
- (d) 4 — Subtracting the second equation from the first: the y-terms cancel, and the x-terms combine as 3x − x = 2x; the right-hand sides give 14 − 6 = 8. This gives 2x = 8, so x = 4. A candidate who subtracts in the wrong order would get 2x = 6 − 14 = −8, so x = −4. A candidate who uses only the first equation, dividing 14 by 3 as if y were 0, would get x ≈ 4.67. A candidate who reports the value of y instead of x would get y = 6 − 4 = 2.
Build your own mix at the worksheet builder.