Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (a) 9 km — Ravi's house and the library have the same y-coordinate, so the distance between them is the difference between their x-coordinates: 6 − (−3) = 9 km. 3 km comes from dropping the negative sign on Ravi's x-coordinate and working out 6 − 3 instead. 0 km comes from using the y-coordinates, which are equal, instead of the x-coordinates. −9 km comes from working out −3 − 6 = −9 and not converting it to a positive distance.
- (d) x = −2, y = −5 — 3x² + 12x + 7 rewrites as 3(x² + 4x) + 7, then as 3[(x + 2)² − 4] + 7, which simplifies to 3(x + 2)² − 5, since −3 × 4 + 7 = −5. Substituting x = −2: 3 × (−2)² = 12, 12 × (−2) = −24, so 12 − 24 + 7 = −5, confirming the minimum value −5 at x = −2: turning point x = −2, y = −5. Halving b instead of halving b/a — using −4 as the shift instead of −2 — lands on turning point x = −4, y = −41, which is wrong because when a ≠ 1 the shift inside the bracket is b/(2a), not b/a alone. Reading the bracket's sign directly as the turning point's x-coordinate gives x = 2, y = −5 — wrong, because (x + 2)² is zero at x = −2, not x = 2. Computing 12 − 7 = 5 instead of 7 − 12 = −5 flips the sign of the constant, giving x = −2, y = 5 — wrong, since the completed square's constant must be evaluated as 7 minus 12, not 12 minus 7. Whenever a ≠ 1, factor a out of the x² and x terms first, and always check a turning point by substituting back into the original equation.
- (d) The fixed call-out fee, charged before the hourly rate. — Method: compare the formula with C = (fixed charge) + (rate) × h, where the fixed charge is the part that does not depend on h. Working: in C = 40 + 25h, the term 25h depends on the number of hours, h, but 40 does not change however many hours the job takes. Answer: 40 is the fixed call-out fee. 'The hourly rate' confuses the fixed term with the coefficient of h, which is actually 25. 'The total cost for a job lasting 1 hour' comes from substituting h = 1 into the formula (40 + 25 = 65) rather than reading off the constant term. 'The number of hours worked before charging starts' wrongly treats the constant, which is in pounds, as if it were measured in hours.
- (d) 4.521 — x₁ = √(3 × 4 + 7) = √19 = 4.358898944. x₂ = √(3 × 4.358898944 + 7) = √20.076696833 = 4.480702716. x₃ = √(3 × 4.480702716 + 7) = √20.442108148 = 4.521294964, which rounds to 4.521. Mislabelling the starting value x₀ as x₁, so that the working stops one iteration too early, reports the true x₂ = 4.480702716, which rounds to 4.481. Working out one iteration too many reports the true x₄ = √(3 × 4.521294964 + 7) = 4.534741987, which rounds to 4.535. Applying the formula in the wrong order, calculating √(3xₙ) + 7 at every step instead of √(3xₙ + 7), gives, from x₀ = 4: √12 + 7 = 10.464101615, then √(3 × 10.464101615) + 7 = 12.602883619, then √(3 × 12.602883619) + 7 = 13.148873950, which rounds to 13.149.
- (d) line 2 — Line 1 correctly represents three consecutive integers using n. Line 2 adds them: n + (n + 1) + (n + 2). Collecting terms: the n-terms give 3n, and the constants give 1 + 2 = 3, so the correct sum is 3n + 3, not 3n + 2 as Line 2 states — this is the first error, an arithmetic slip in collecting the constant terms. Lines 3 and 4 both follow correctly from Line 2's incorrect result, but that result itself is wrong: the true sum, 3n + 3 = 3(n + 1), is a multiple of 3 for every whole number n. Check the working of each line against what came before it, in order, rather than judging whether the final conclusion feels right — an error that flips the conclusion can sit several lines before the line that states it.
- (d) It is n-shaped, since the x² coefficient is negative. — The coefficient of x² is −2, which is negative, so the quadratic curve opens downward — shaped like an n, with a maximum turning point. Saying it is U-shaped focuses only on x² being non-negative and ignores that the −2 in front of it flips the whole curve to open downward. Saying it is a straight line confuses having a constant term with being linear — any equation with an x² term is a curve, not a line. Saying it repeatedly rises and falls like a wave describes a trigonometric graph such as y = sin x, not a quadratic.
- (d) Overestimate — the curve bends upward (convex). — The first differences of the speeds are 3, 5, 7 and 9, so the second differences are 2, 2 and 2 — constant and positive, which means the speed-time graph curves upwards (is convex). On a convex curve, each straight chord used by the trapezium rule lies above the curve, so the trapezium rule overestimates the true distance. 'Underestimate — the curve bends upward' states the same correct geometry but gets the conclusion backwards — a chord above the curve means too much area is counted, not too little. 'Overestimate — the speed values are increasing' uses the wrong evidence: increasing speed alone doesn't tell you whether the curve bends up or down, only the second differences do. 'Underestimate — second differences are constant' confuses a constant second difference with a steady rate of change in speed, which isn't what the second difference of a speed-time table measures.
- (a) An identity, because it is true for every value of x — Expanding the brackets multiplies both terms inside by 4, giving 4x + 12, which is exactly the right-hand side. The two sides are therefore equal whatever x is, and a statement true for every value of the letter is an identity. An equation is true only for particular values, and trying to solve this one leads to 0 = 0, which places no restriction on x at all. Being able to expand brackets is not what makes a statement an identity, since any equation with brackets can be expanded. Nor is it a formula: a formula links two different quantities, and only one letter appears here.
- (b) 158 minutes — Rearranging C = 15 + 0.2m for m: subtract 15 from both sides to get C − 15 = 0.2m, then divide by 0.2: m = (C − 15)/0.2. Substituting C = 46.60: m = (46.60 − 15)/0.2 = 31.60/0.2 = 158. Answering 233 minutes comes from dividing the whole £46.60 by 0.2 without first taking off the £15 fixed charge. Answering 308 minutes comes from adding the £15 instead of subtracting it: (46.60 + 15)/0.2. Answering 218 minutes divides first and subtracts 15 afterwards, in the wrong order: 46.60/0.2 − 15 = 233 − 15 = 218. Ali made 158 minutes of calls.
- (a) k = 3 — Method: a solution of an equation makes both sides balance, so substitute it in and solve the equation in k that is left. Working: putting x = 3 gives 3² − (k + 1) × 3 + k = 0, that is 9 − 3k − 3 + k = 0, so 6 − 2k = 0 and k = 3; the equation is then x² − 4x + 3 = 0, whose solutions are 3 and 1. Answer: k = 3. The distractors: k = −3 comes from solving 6 − 2k = 0 as though it gave 2k = −6; k = 4 comes from expanding −3(k + 1) as −3k − 1, multiplying only the k by 3; k = 1.5 comes from working 3² as 3 × 2 = 6, which leaves 3 − 2k = 0.
- (d) It crosses the x-axis at x = 3 and x = −3. — y = x² − 9 factorises as (x − 3)(x + 3), since 9 = 3², so the curve crosses the x-axis at x = 3 and x = −3. Saying it crosses once at x = 9 mistakes the constant term for a root directly, without taking its square root. Saying it crosses at x = 9 and x = −9 makes the same mistake but adds a sign either way. Saying it does not cross the x-axis confuses the y-intercept, which is negative at (0, −9), with the number of times the curve meets the x-axis — a negative y-intercept combined with an upward-opening curve guarantees it crosses the x-axis twice.
- (b) 1.50 — Substituting (0, 8) gives A = 8, since r⁰ = 1. Substituting (2, 18) gives 8 × r² = 18, so r² = 18 ÷ 8 = 2.25. Taking the square root of 2.25 gives r = 1.50 (2 d.p.). Stopping after finding r² and giving 2.25 as the final answer, without taking the square root, is wrong because r² is not the same as r. Dividing r² by the exponent 2 instead of taking its square root — treating the power as something you divide by rather than root — gives 2.25 ÷ 2 = 1.13 (2 d.p.), which is wrong. Inverting the ratio, working out 8 ÷ 18 instead of 18 ÷ 8, gives 0.44 (2 d.p.), which is wrong because the LATER value must be divided by the EARLIER one to find the growth multiplier, not the other way round.
- (a) (40, 0) — Method: a graph crosses the x-axis where y = 0, which in this context is the moment the tank holds no water, so substituting y = 0 and solving gives the time. Working: 0 = −5x + 200 gives 5x = 200, so x = 200 ÷ 5 = 40 and the crossing point is (40, 0); the tank is empty after 40 minutes. Answer: (40, 0). The distractors: (0, 200) is the y-axis crossing, the 200 litres in the tank at the start, found by substituting x = 0 instead of y = 0; (200, 0) comes from reading the constant 200 as the x-coordinate without dividing by the 5 litres lost each minute; (0, 40) has the right number in the wrong place, with the time written as a y-coordinate.
- (a) y = −2x + 3 — Method: find the step in the outputs for each step of 1 in the input — falling outputs mean a negative multiplier — then read off the output when the input is 0, because that is the number added on. Working: the outputs 5, 3, 1, −1 fall by 2 each time x rises by 1, so x is multiplied by −2; the output at x = 0 is 3, so 3 is added. Answer: y = −2x + 3, checked at x = 2 by −2 × 2 + 3 = −1. The distractors: y = 2x + 3 comes from taking the size of the step, 2, as the multiplier and ignoring the fact that the outputs are falling; y = −2x − 3 comes from using the correct multiplier but writing the number added on as −3 instead of the output 3 listed at x = 0; y = −x + 4 comes from taking the multiplier as −1, its size read from the step of 1 in the inputs instead of the step of 2 in the outputs and its sign from the fact that the outputs fall, and then fitting the number added on to the pair x = −1, y = 5.
- (c) 2 — For a geometric sequence, a₄ = a₂ × r². So r² = a₄ ÷ a₂ = 24 ÷ 6 = 4, giving r = 2 or r = −2. Since all the terms are positive, r = 2. 4 comes from computing a₄ ÷ a₂ = 4 and stopping there, without taking the square root to find r. 18 comes from subtracting instead of dividing: a₄ − a₂ = 24 − 6 = 18, taken directly as the common ratio. −2 is the other square root of 4, but it is rejected because all the sequence's terms are given as positive.
Build your own mix at the worksheet builder.