Printable · GCSE Higher · ages 14-16
Algebra worksheet — GCSE Higher
Fifteen questions across the algebra statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Answer key: Algebra worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (d) x² − 49 — Area = length × width = (x + 7)(x − 7). Expanding: x × x = x², x × (−7) = −7x, 7 × x = 7x, 7 × (−7) = −49. The two middle terms −7x and 7x cancel, leaving x² − 49. A candidate who misremembers the difference-of-two-squares result as a sum gets x² + 49. A candidate who makes a sign error and treats both middle terms as −7x instead of cancelling gets x² − 14x − 49. A candidate who confuses area with perimeter and simply adds the length and width gets 2x.
- (a) Overestimates — trapezium edges lie above the curve. — For a concave-up curve, each chord connecting two points on the curve lies ABOVE the curve between those points, because the curve bends away from the chord underneath it. The trapezium rule uses these chords as the top edges of each trapezium, so the trapeziums cover a larger region than the true area under the curve — the estimate is an overestimate. Saying it underestimates because the edges lie below the curve gets the direction backwards: for a concave-up curve the edges lie above, not below. Saying it overestimates 'because more strips always increase it' gives the right verdict for the wrong reason — using MORE, narrower strips makes a trapezium estimate more accurate and brings it closer to the true area, it does not simply increase the total. Saying the estimate is exact ignores that straight edges cannot follow a curved line perfectly; there is always a gap between the chord and the curve on a bend, which is exactly what makes the rule an estimate rather than an exact calculation.
- (d) 1 — Method: find the step in the outputs for each step of 1 in the input, write the rule from that step and from one pair of values, then apply the rule to the last input. Working: the outputs −5, −3, −1 rise by 2 while x rises in ones, so x is multiplied by 2; at x = 1, 2 × 1 = 2 while y = −5, so 7 is subtracted, giving y = 2x − 7; at x = 4 the rule gives 2 × 4 = 8 and 8 − 7 = 1. Answer: y = 1. The distractors: 3 comes from carrying the outputs on one step too far, to x = 5; 0 comes from assuming the outputs −5, −3, −1 carry on by adding 1 rather than by adding 2; 8 comes from doubling the input and forgetting to subtract the 7.
- (a) 25 — Gradient = change in y ÷ change in x = (100 − 0) ÷ (4 − 0) = 100 ÷ 4 = 25. Dividing time by distance instead of distance by time gives 0.04; multiplying the two values instead of dividing gives 400; stopping at the change in distance, 100, forgets to divide by the change in time.
- (b) n² + 4n — First differences of 5, 12, 21, 32, 45 are 7, 9, 11, 13. Second differences are 2, 2, 2, so a = 2 ÷ 2 = 1. Subtracting n² (1, 4, 9, 16, 25) from the totals (5, 12, 21, 32, 45) leaves 4, 8, 12, 16, 20, the linear expression 4n. So the number of oranges is n² + 4n. Using the second difference itself as the coefficient of n², without halving it, gives 2n² + 4n. Finding a = 1 correctly but dropping the linear remainder 4n entirely leaves n². Treating the first first difference (7) as a constant common difference and building a linear formula 5 + 7(n − 1) = 7n − 2 fits only the first two totals, and gives 19 for n = 3 instead of 21.
- (a) They always charge the same, since 3(2n + 4) = 6n + 12. — Expand Advert A's formula by multiplying both terms inside the bracket by 3: 3 × 2n = 6n, and 3 × 4 = 12, giving 3(2n + 4) = 6n + 12, which is identical to Advert B's formula — so the two adverts always charge the same amount, whatever n is. Getting 6n + 4 comes from multiplying the 2n by 3 but leaving the 4 unmultiplied. Getting 2n + 7 comes from adding 3 to the bracket instead of multiplying by it. Saying it depends on n avoids expanding the bracket at all — once expanded, both formulas are identical for every value of n, so the cost can be compared directly.
- (c) Line D — Method: the steeper of two lines is the one whose gradient is greater, and the gradient of a line through two points is the change in y divided by the change in x. Working: line C rises 2 for a run of 4, so its gradient is 2 ÷ 4 = 1/2; the other line rises 2 for a run of 2, so its gradient is 2 ÷ 2 = 1; since 1 is greater than 1/2, it is line D that is the steeper. Answer: Line D. The distractors: Line C is chosen by comparing the x-coordinates and calling the line that reaches further along the x-axis the steeper one; They are equally steep comes from comparing only the y-coordinates, which are both 2, without dividing by the two different runs; There is not enough information comes from believing that a gradient can only be measured off a drawn graph, when two points on a line are enough to work it out.
- (c) 72 m — The first section is a triangle with base 4 s and height 8 m/s, area = 1/2 × 4 × 8 = 16 m. The middle section is a rectangle with base 6 s and height 8 m/s, area = 6 × 8 = 48 m. The final section is a triangle with base 2 s and height 8 m/s, area = 1/2 × 2 × 8 = 8 m. Total distance = 16 + 48 + 8 = 72 m. Treating both sloping sections as full rectangles instead of triangles — forgetting the factor of a half — gives 4 × 8 + 6 × 8 + 2 × 8 = 96 m, which is wrong because a sloping speed-time section is a triangle, not a rectangle. Leaving out the final, decreasing section entirely gives 16 + 48 = 64 m, which is wrong because the cyclist is still moving and covering distance while slowing down. Leaving out the middle, constant-speed section gives 16 + 8 = 24 m, which is wrong because the cyclist covers the most distance of all during the 6 seconds of constant speed.
- (b) 319 — Substitute n = 10: 3 × 10² + 2 × 10 − 1 = 3 × 100 + 20 − 1 = 300 + 20 − 1 = 319. A sign error on the +2n term, treating it as −2n, gives 300 − 20 − 1 = 279. Working out 3 × 10² + 2 × 10 but forgetting to subtract the final 1 gives 300 + 20 = 320. Using n = 9 instead of n = 10 gives 3 × 81 + 18 − 1 = 243 + 18 − 1 = 260.
- (d) 7 — Method: set up the equation 2.50 + 1.80m = 15.10, then subtract the booking fee and divide by the cost per mile. Working: 1.80m = 15.10 − 2.50 = 12.60; m = 12.60 ÷ 1.80 = 7. Answer: 7 miles. 8.39 comes from dividing the whole £15.10 by £1.80 without first subtracting the booking fee: 15.10 ÷ 1.80 ≈ 8.39. 5.32 comes from swapping the two amounts round, subtracting £1.80 and dividing by £2.50: (15.10 − 1.80) ÷ 2.50 ≈ 5.32. 9.78 comes from adding the booking fee instead of subtracting it: (15.10 + 2.50) ÷ 1.80 ≈ 9.78.
- (a) Yes — the t² coefficient is negative, giving an n-shape. — The coefficient of t² in h = −5t² + 20t is −5, which is negative, so the graph is n-shaped with a maximum point — this matches the physical story of the rocket rising then falling, but the shape itself is decided by the negative coefficient of t², not by the story alone. Saying the shape comes from the story rather than the coefficient gets the reasoning backwards — the algebra determines the shape, and the story happens to agree with it. Saying it is U-shaped because height starts by increasing confuses the early part of the curve with its overall shape; a U-shaped curve would mean the rocket's height eventually increases again forever, which does not happen here. Saying it is n-shaped only because the rocket lands treats a consequence of the shape as if it were the cause.
- (b) x = 7, y = 3 — Method: one equation contains +y and the other −y, so adding them removes y; the value found is then substituted back to get the other letter. Working: adding x + y = 10 and x − y = 4 gives 2x = 14, so x = 7; substituting into x + y = 10 gives 7 + y = 10, so y = 3. Answer: x = 7, y = 3, and 7 − 3 = 4 as required. The distractors: x = 7, y = 4 comes from finding x correctly and then taking the 4 in x − y = 4 to be the value of y; x = 5, y = 5 comes from splitting the total of 10 equally and never using the difference; x = 14, y = −4 comes from adding the equations to 2x = 14 and forgetting to halve, so that x is taken as 14 and y as 10 − 14.
- (c) 64 m — The distance travelled is the area under the speed-time graph. From t = 0 to t = 4, the shape is a triangle with base 4 and height 8, area 1/2 × 4 × 8 = 16. From t = 4 to t = 10, the shape is a rectangle with base 6 and height 8, area 6 × 8 = 48. Total distance: 16 + 48 = 64 m. Treating the whole 10 seconds as a single trapezium with parallel sides 0 and 8 and width 10, instead of splitting it into the triangle and rectangle, gives 40 m. Ignoring the acceleration phase completely and assuming the car travels at a constant 8 m/s for all 10 seconds gives 8 × 10 = 80 m. Misreading the second interval as running from t = 4 to t = 8 instead of t = 4 to t = 10 gives a rectangle area of 4 × 8 = 32, plus the correct triangle of 16, totalling 48 m.
- (d) x = 0, y = −1 and x = 3, y = 5 — Set the two expressions for y equal: 2x − 1 = x² − x − 1. Rearranging, subtracting 2x and adding 1 to both sides: 0 = x² − x − 1 − 2x + 1 = x² − 3x, so x² − 3x = 0. Factorise: x(x − 3) = 0, giving x = 0 or x = 3. Using y = 2x − 1: x = 0 gives y = −1; x = 3 gives y = 5. Distractor routes: x = 0, y = −1 alone stops after the factor x = 0 and never checks the second factor, x − 3 = 0. x = 0, y = −1 and x = −3, y = −7 comes from mis-factorising x² − 3x as x(x + 3), a sign error that gives a second root of −3 instead of 3. x = −2, y = −5 and x = 1, y = 1 comes from adding 2x to both sides instead of subtracting it when rearranging, giving x² + x − 2 = 0 instead of x² − 3x = 0.
- (c) 10x − 15 — Expand the bracket first: 3(2x − 5) = 6x − 15. Then add the 4x: 6x − 15 + 4x = 10x − 15. The option 10x − 5 comes from forgetting to multiply the 5 inside the bracket by 3 (treating it as 6x − 5), then adding 4x. The option 10x + 15 comes from a sign error when expanding, treating 3 × (−5) as +15 instead of −15, then adding 4x. The option 6x − 15 comes from expanding the bracket correctly but forgetting to add the 4x term at all.
Build your own mix at the worksheet builder.