Printable · GCSE Higher · ages 14-16
Number worksheet — GCSE Higher
Fifteen questions across the number statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Number worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A country's population is 8,340,000, and it is estimated that 1,950,000 of them live in the capital city. By rounding each number to 1 significant figure, work out an estimate for the number of people who do not live in the capital city.
- 2.Two-digit numbers are made using the digits 1, 2, 3 and 4, and no digit may be used twice in the same number. Work out how many different two-digit numbers can be made.
- 3.A cinema has 250 seats. 12% of the seats are reserved. Work out how many of the seats are reserved.
- 4.Work out 35% of 180.
- 5.By listing systematically, work out how many two-digit multiples of 5 can be made using the digits 0, 3 and 5, if each digit can be used at most once and the number cannot start with 0.
- 6.Which of these is written correctly in standard form?
- 7.A circle has a radius of 3 cm. Which of these is the exact area of the circle?
- 8.The error interval for the mass of a suitcase, m kg, is given as 22.5 ≤ m < 23.5. Write down the mass of the suitcase, correct to the nearest whole number.
- 9.Given that 2⁵ = 32, work out 2⁶.
- 10.Work out 10% of 30% of £200.
- 11.Round 0.006482 to 2 significant figures.
- 12.In a science experiment, the temperature of a liquid is recorded as 18.6 °C, correct to the nearest 0.2 °C. Write down the error interval for the actual temperature, T °C.
- 13.A pair of trainers is priced at £80 online. The shop takes 25% off the price and then adds £10 for next-day delivery. Work out the total cost.
- 14.To estimate the cost of buying 38.7 m of rope at £21.40 per metre, both numbers are first rounded to 1 significant figure. Work out the estimate.
- 15.Maya buys 4 plants at £3.20 each and a bag of compost for £6.75. She pays with a £20 note. Work out her change.
Build your own mix at the worksheet builder.