Printable · GCSE Higher · ages 14-16
Conditional probability worksheet — GCSE Higher
Fifteen questions on "conditional probability" — DfE statement P9. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Higher only
Answer key: Conditional probability worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- (b) 12/19 — Method: turn the percentages into expected frequencies out of 1000, total the faulty pens, then divide supplier Y's faulty pens by that total, because the pen picked is known to be faulty. Working: supplier X provided 700 pens and 2% of them are faulty, which is 14 pens. Supplier Y provided 300 pens and 8% of them are faulty, which is 24 pens. Altogether 38 pens are faulty, so the probability is 24/38, and dividing the numerator and the denominator by 2 gives 12/19. Answer: the probability is 12/19. The distractors: 3/10 is supplier Y's share of the stock, the answer before the faulty information is used at all; 3/125 is 24/1000, the probability that a pen is from supplier Y and faulty, which stops at the joint probability and never divides by the probability of a fault; 4/5 is 8 divided by 2 + 8, comparing the two fault rates as though the suppliers provided equal numbers of pens, so the 70 to 30 split is thrown away.
- (c) 0.04 — Method: 'made by machine B and faulty' is the second branch of a tree followed after the first, so multiply the probability of machine B by the probability of a fault given machine B. Working: machine B makes 0.4 of the bolts, and 0.1 of those bolts are faulty, so the probability is 0.4 × 0.1 = 0.04. Answer: the probability is 0.04. The distractors: 0.5 comes from adding 0.4 and 0.1 instead of multiplying, treating two stages of one journey as two separate outcomes; 0.1 gives the fault rate for machine B on its own, as though every bolt in the factory came from machine B, so the 40% share is never used; 0.07 is 0.6 × 0.05 added to 0.4 × 0.1, the probability that a bolt is faulty whichever machine made it, which answers a question about all the production rather than about machine B.
- (a) 9/25 — Method: P(badminton | tennis) = n(tennis and badminton) ÷ n(tennis) — restrict to the tennis-players, then find what fraction of them also play badminton. Working: n(tennis and badminton) = 18, n(tennis) = 50, so P(badminton | tennis) = 18/50 = 9/25. Answer: 9/25. Watch out: dividing by 40 (the badminton total) finds P(tennis | badminton) instead of P(badminton | tennis) — the wrong direction. Dividing by 90 (all the members named in the question) ignores that you already know the member plays tennis. And dividing by 72 (50 + 40 − 18, the number who play at least one of the two sports) answers a question about the union, not the condition you were given.
- (a) 70 — Method: two linked steps. Find the expected number of billing calls first, then take the 35% of those, because the 35% is quoted for billing calls only. Working: 40% of 500 is 200 billing calls. 35% of 200 is 70 calls. Answer: you would expect 70 calls. The distractors: 200 stops after the first step and gives the billing calls, forgetting that only some of them are dealt with quickly; 175 is 35% of 500, applying the quick response rate to every call the centre takes rather than to the billing calls only; 375 comes from adding 40% and 35% to get 75% and taking 75% of 500, which treats two stages of one journey as separate outcomes to be added.
- (b) 8/35 — Method: the pupil picked is known to play at least one of the two sports, so first count how many pupils that is, then divide the number who play both by it. Working: 25 play football and 18 play tennis, but the 8 who play both have been counted in each figure, so the number who play at least one sport is 25 + 18 minus 8, which is 35. The pupils who play both give 8/35, which will not cancel. Answer: the probability is 8/35. The distractors: 2/15 is 8/60, dividing by the whole year group instead of by the 35 pupils who play at least one sport; 8/43 uses 25 + 18 as the denominator, forgetting that the 8 pupils who play both have been counted twice; 8/25 conditions on the footballers alone, answering the probability that a footballer also plays tennis rather than using every pupil who plays a sport.
- (b) 60 — Method: independence means the proportion of part timers among the cyclists is the same as the proportion among all the employees, so find that proportion and apply it to the cyclists. Working: 150 of the 400 employees work part time, which is a proportion of 0.375. Applying it to the 160 cyclists gives 0.375 × 160 = 60 employees. Answer: you would expect 60 employees. The distractors: 310 adds 150 and 160, treating the group who do both as everyone who does one thing or the other; 10 subtracts 150 from 160, reading 'both' as the difference between the two counts; 75 halves the 150 part timers, assuming that independence means they split evenly between cyclists and non cyclists, which would need exactly half the workforce to cycle.
- (c) 0.25 — Method: P(B | A) = P(A and B) ÷ P(A). Working: P(B | A) = 0.15 ÷ 0.6 = 0.25. Answer: 0.25. Watch out: multiplying 0.6 by 0.15 instead of dividing gives 0.09, and subtracting 0.15 from 0.6 gives 0.45 — neither uses the conditional probability formula. Leaving the answer as 0.15 mistakes the probability of A and B happening together for the probability of B once you already know A has happened — those are different quantities.
- (a) 0.45, different from 0.4 for all the households — Method: work out the probability inside the restricted group of garden owners, then work out the probability across the whole survey, and compare the two. Working: 54 of the 120 households with a garden own a dog, so the conditional probability is 54 divided by 120, which is 0.45. Across the whole survey 80 of the 200 households own a dog, which is 0.4. Since 0.45 is not 0.4, having a garden changes the chance of owning a dog and the two events are not independent. Answer: 0.45, different from 0.4 for all the households. The distractors: 0.27 is 54/200, dividing the households with both by the whole survey instead of by the 120 with a garden; 0.675 is 54/80, the probability that a household has a garden given that it owns a dog, which is the condition and the event the wrong way round; 0.4 is 80/200, the probability of owning a dog with the garden information never used, which is why that route also reports no difference.
- (d) 5/11 — Method: the pen already taken was black, so update the contents of the box before working out the second probability. Working: the box held 12 pens and one black pen has gone, so 11 pens remain. None of the blue pens has been taken, so all 5 are still there, and the probability is 5/11, which will not cancel. Answer: the probability is 5/11. The distractors: 5/12 uses the box as it was at the start, which is only correct if the first pen is put back; 4/11 takes one off the blue count as well as the total, as though the pen removed had been blue; 6/11 gives the probability that the second pen is black, carrying on with the colour of the first pen instead of the colour asked for.
- (b) 11/20 — Method: the person picked is known to own a bicycle, so work inside the 20 bicycle owners and count how many of them do not own a car. Working: 9 of the 20 bicycle owners also own a car, so 11 of them do not. The probability is 11/20, which will not cancel. Answer: the probability is 11/20. The distractors: 9/20 gives the bicycle owners who DO own a car, answering the opposite event inside the correct group; 11/50 divides by the whole group of 50, keeping the restricted numerator but the full denominator; 11/32 puts the count over the number of car owners, conditioning on the wrong group entirely.
- (b) 0.355 — Method: use the law of total probability across the two Monday branches: P(rain Tue) = P(rain Mon) × P(rain Tue | rain Mon) + P(no rain Mon) × P(rain Tue | no rain Mon). Working: P(no rain Mon) = 1 − 0.3 = 0.7. P(rain Tue) = (0.3 × 0.6) + (0.7 × 0.25) = 0.18 + 0.175 = 0.355. Answer: 0.355. Watch out: using only the rain-Monday branch (0.3 × 0.6) or only the no-rain-Monday branch (0.7 × 0.25) accounts for just one of the two ways Tuesday can turn out rainy — both branches must be added. And swapping which weekday-probability multiplies which branch (0.7 with the rain branch, 0.3 with the no-rain branch) uses the right numbers on the wrong branches.
- (a) 7/16 — Method: the adult picked is known to have a driving licence, so the sample space is everyone with a licence; divide the number of men with a licence by that total. Working: 45 women and 35 men have a licence, so 80 adults have one. The men with a licence give 35/80, and dividing the numerator and the denominator by 5 gives 7/16. Answer: the probability is 7/16. The distractors: 7/10 is 35/50, the probability that an adult has a licence given that he is a man, which is the condition and the event the wrong way round; 7/24 is 35/120, dividing by all 120 adults surveyed instead of by the 80 who have a licence; 5/12 is 50/120, the probability that an adult picked from the whole survey is a man, which uses none of the licence information the question supplies.
- (b) 2/11 — Method: restrict the 36 equally likely outcomes to those where at least one die shows a 5, then find what fraction of THOSE give a total of 8. Working: outcomes with at least one 5: (5, 1), (5, 2), (5, 3), (5, 4), (5, 5), (5, 6), (1, 5), (2, 5), (3, 5), (4, 5), (6, 5) — 11 outcomes. Among these, the total is 8 for (5, 3) and (3, 5) — 2 outcomes. P(total 8 | at least one 5) = 2/11. Answer: 2/11. Watch out: 5/36 is P(total 8) over the full 36 outcomes — it ignores that you already know one die shows a 5. Treating the condition as 'the first die shows a 5' instead of 'at least one die shows a 5' restricts you to only 6 outcomes and misses the (3, 5) case, giving 1/6. And counting only (5, 3) but not its reverse (3, 5) inside the correct 11-outcome list gives 1/11 instead of 2/11.
- (c) 15/23 — Method: find P(rough and delayed) and the overall P(delayed) using the tree, then divide. Working: P(rough and delayed) = 0.2 × 0.75 = 0.15. P(calm and delayed) = 0.8 × 0.1 = 0.08. P(delayed) = 0.15 + 0.08 = 0.23. P(rough | delayed) = 0.15 ÷ 0.23 = 15/23. Answer: 15/23. Watch out: leaving the answer as 0.15 (3/20) gives P(rough and delayed) itself, without dividing by the overall probability that a crossing is delayed. Giving 0.75 (3/4) is the probability you were told to start with — that a crossing is delayed GIVEN the sea is rough — which is the reverse of what's being asked. And 0.2 (1/5) is just the original probability that the sea is rough, before you take the fact that the crossing was delayed into account.
- (b) 0.0309 — Method: P(both defective | at least one defective) = P(both defective) ÷ P(at least one defective). Find each using independence: P(both) = 0.06², P(at least one) = 1 − P(neither) = 1 − 0.94². Working: P(both) = 0.06² = 0.0036. P(neither) = 0.94² = 0.8836, so P(at least one) = 1 − 0.8836 = 0.1164. P(both | at least one) = 0.0036 ÷ 0.1164 = 0.0309 (3 s.f.). Answer: 0.0309. Watch out: leaving the answer as 0.0036 gives P(both defective) itself, not the probability once you already know at least one is defective — you still need to divide by P(at least one defective). Giving 0.0600 answers with the single-component defect rate, ignoring the condition altogether. And 0.5000 assumes that 'at least one' makes the outcomes 'exactly one defective' and 'both defective' equally likely, which is not how these probabilities combine.
Build your own mix at the worksheet builder.