- 1.The exchange rate is £1 = €1.15. Convert £200 to euros.
- 2.It takes 8 painters 6 days to paint a fence. Working at the same rate, work out how many days 4 painters would take to paint the same fence.
- 3.y is inversely proportional to x. When x = 5, y = 8. Work out the value of y when x = 10.
- 4.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 5.A 750 g box of cereal costs £2.70. A 500 g box of the same cereal costs £1.95. Work out which box is better value, and its cost per 100 g.
- 6.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 7.Two numbers a and b are in the ratio a : b = 3 : 4. Given that a = 15, work out the value of b.
- 8.A spring's extension is directly proportional to the force applied to it. A force of 5 N produces an extension of 12 mm. Work out the extension produced by a force of 20 N.
- 9.It takes 2 identical pumps 10 hours to empty a flooded basement. Working at the same rate, work out how many hours 5 of these pumps would take to empty the same basement.
- 10.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 11.y is directly proportional to x. When x = 4, y = 10. Work out the value of y when x = 6.
- 12.Work out the value of x when 4/x = 2/5.
- 13.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 14.A recipe for 8 muffins needs 200 g of sugar. Sam wants to make 20 muffins for a bake sale, and he already has 350 g of sugar. Work out how many more grams of sugar he needs to buy.
- 15.Two cars travel at constant speeds. Car A travels 150 km in 3 hours. Car B travels 180 km in 4 hours. Which car is faster, and what is its speed?
Answer key
- (b) €230.00 — Multiply the amount in pounds by the exchange rate: 200 × 1.15 = 230, so £200 = €230.00. Working out 200 + 1.15 = 201.15 treats the exchange rate as an amount to add rather than a multiplier. Working out 200 × 0.15 = 30 finds only the extra amount earned for every pound and forgets to add it back to the original £200. Working out 200 × 11.5 = 2300.00 misplaces the decimal point in the exchange rate, multiplying by 11.5 instead of 1.15. £200 converts to €230.00.
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
- (a) 4 — Method: for inverse proportion, x × y always stays the same value. Working: when x = 5 and y = 8, the constant is 5 × 8 = 40. When x = 10, y = 40 ÷ 10 = 4. So y = 4. Distractor 16 comes from treating the relationship as direct proportion instead of inverse, working out 8 × 10 ÷ 5. Distractor 3 comes from assuming y decreases by the same amount that x increases, an additive rather than proportional idea. Distractor 0.8 comes from dividing the given y-value, 8, by the new x-value, 10, without first finding the constant.
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (d) 20 — Method: equivalent ratios are linked by a single multiplier, so find it from the part you know and apply it to the other part. Working: 15 ÷ 3 = 5, so the multiplier is 5, and 4 × 5 = 20. Answer: 20. The distractors: 16 comes from adding the difference between the ratio parts, 4 − 3 = 1, to 15, treating the ratio as a difference; 60 comes from multiplying 15 by 4 without first dividing by 3; 11.25 comes from using the ratio the wrong way round, working out 15 × 3 ÷ 4.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (a) 10 — Method: two equal fractions can be rearranged by cross-multiplying, multiplying each numerator by the other denominator. Working: 4 × 5 = 2 × x, so 2x = 20 and x = 20 ÷ 2 = 10. Answer: 10. The distractors: 20 comes from cross-multiplying to 4 × 5 = 20 and stopping there, without dividing by the 2; 8 comes from multiplying the two numerators, 4 × 2; 2.5 comes from working only with the right-hand fraction, 5 ÷ 2, and ignoring the 4.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (a) 150 g — Method: scale the recipe to find the total sugar needed, then subtract the sugar Sam already has. Working: 200 ÷ 8 × 20 = 500, so 500 g is needed in total; 500 − 350 = 150, so 150 g still to buy. Stopping after finding the total, 500, without subtracting what he has gives 500 g. Scaling the wrong way round, 200 × 8 ÷ 20 = 80, wrongly suggests he already has enough, giving 0 g. Adding the amount he has instead of subtracting it, 500 + 350 = 850, gives 850 g.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.