Printable · GCSE Higher · ages 14-16
Direct and inverse proportion worksheet — GCSE Higher
Fifteen questions on "direct and inverse proportion" — DfE statement R10. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
Direct and inverse proportion worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A car uses fuel at a constant rate. It uses 24 litres of fuel to travel 300 km. Assuming the same rate, work out how many litres of fuel are needed for a journey of 175 km.
- 2.y is directly proportional to x. When x = 5, y = 18. Work out the value of y when x = 15.
- 3.It takes 8 painters 6 days to paint a fence. Working at the same rate, work out how many days 4 painters would take to paint the same fence.
- 4.A machine fills bottles at a constant rate. It fills 18 bottles in 3 minutes. Working at the same rate, work out how many bottles the machine fills in 8 minutes.
- 5.The exchange rate is £1 = 1.28 US dollars. Convert £350 into US dollars.
- 6.6 identical taps fill a paddling pool in 20 minutes. Each tap fills at the same steady rate. Work out how long 3 of these taps would take to fill the same pool.
- 7.A spring's extension is directly proportional to the force applied to it. A force of 5 N produces an extension of 12 mm. Work out the extension produced by a force of 20 N.
- 8.6 identical printers can print a batch of exam papers in 40 minutes, all working at the same rate. Working at the same rate, work out how many minutes 4 of these printers would take to print the same batch.
- 9.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 10.Amelia uses 2 kg of flour to bake 5 cakes. Using the same recipe, work out how many cakes she can bake with 6 kg of flour.
- 11.y is directly proportional to x. When x = 4, y = 10. Work out the value of y when x = 6.
- 12.The exchange rate is £1 = €1.15. Convert £200 to euros.
- 13.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 14.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 15.Two numbers a and b are in the ratio a : b = 3 : 4. Given that a = 15, work out the value of b.
Answer key
- (c) 14 litres — Method: find the amount of fuel used per km first, then use it to find the fuel needed for 175 km. Working: 24 ÷ 300 = 0.08 litres per km, and 0.08 × 175 = 14 litres. So 14 litres are needed. Distractor 24 litres comes from assuming the same amount of fuel is used no matter the distance, without scaling. Distractor 21 litres comes from misreading the original distance as 200 km instead of 300 km. Distractor 1.4 litres comes from a decimal-point slip, giving an answer ten times too small.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
- (d) 48 — Find the rate first: 18 ÷ 3 = 6 bottles per minute. Then apply it to the new time: 6 × 8 = 48 bottles. Working out 18 + (8 − 3) = 23 adds the extra 5 minutes onto the number of bottles instead of scaling proportionally. Working out 18 × 8 = 144 multiplies the given number of bottles by the new number of minutes without finding the rate first. Writing 18 keeps the count the same, not realising it must change with the time. In 8 minutes the machine fills 48 bottles.
- (c) 448.00 US dollars — Method: multiply the amount in pounds by the exchange rate. Working: £350 × 1.28 = 448.00 US dollars. Wrong options: 273.44 US dollars comes from dividing by the rate instead of multiplying (350 ÷ 1.28); 351.28 US dollars comes from adding the rate to the amount instead of multiplying; 4,480.00 US dollars comes from a decimal-point slip, using 12.8 instead of 1.28.
- (c) 40 minutes — Method: this is inverse proportion — fewer taps means longer, not shorter — so the number of taps × the time taken stays constant. Working: 6 × 20 = 120, and with 3 taps the time is 120 ÷ 3 = 40 minutes. So 3 taps take 40 minutes. Distractor 10 minutes comes from treating it as direct proportion instead of inverse, working out 20 × 3 ÷ 6. Distractor 30 minutes comes from halving the number of taps and adding half the original time, 20 + 10, instead of doubling the time. Distractor 17 minutes comes from subtracting the number of taps removed, 3, directly from the original time, 20.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
- (a) 60 minutes — Method: for inverse proportion, printers × time is constant. Working: 6 × 40 = 240 (the constant). With 4 printers: 240 ÷ 4 = 60 minutes. Wrong options: 26.7 minutes comes from treating the relationship as direct proportion, scaling the time down as printers decrease (40 × 4 ÷ 6); 24 minutes comes from multiplying the two printer counts together instead of using the constant; 40 minutes comes from not adjusting the time at all for the change in printers.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (c) 15 — Method: the number of cakes is in direct proportion to the mass of flour, so find the multiplier between the two masses and apply it to the number of cakes. Working: 6 ÷ 2 = 3, so there is three times as much flour, and 5 × 3 = 15. Answer: 15. The distractors: 10 comes from multiplying the 5 cakes by 2, the mass in the recipe, instead of by the multiplier 3; 20 comes from multiplying by the difference 6 − 2 = 4, treating a proportion problem as a difference problem; 12 comes from rounding 5 ÷ 2 down to 2 cakes per kilogram and working out 6 × 2.
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (b) €230.00 — Multiply the amount in pounds by the exchange rate: 200 × 1.15 = 230, so £200 = €230.00. Working out 200 + 1.15 = 201.15 treats the exchange rate as an amount to add rather than a multiplier. Working out 200 × 0.15 = 30 finds only the extra amount earned for every pound and forgets to add it back to the original £200. Working out 200 × 11.5 = 2300.00 misplaces the decimal point in the exchange rate, multiplying by 11.5 instead of 1.15. £200 converts to €230.00.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (d) 20 — Method: equivalent ratios are linked by a single multiplier, so find it from the part you know and apply it to the other part. Working: 15 ÷ 3 = 5, so the multiplier is 5, and 4 × 5 = 20. Answer: 20. The distractors: 16 comes from adding the difference between the ratio parts, 4 − 3 = 1, to 15, treating the ratio as a difference; 60 comes from multiplying 15 by 4 without first dividing by 3; 11.25 comes from using the ratio the wrong way round, working out 15 × 3 ÷ 4.
Build your own mix at the worksheet builder.