Printable · GCSE Higher · ages 14-16
Equations of direct and inverse proportion worksheet — GCSE Higher
Fifteen questions on "equations of direct and inverse proportion" — DfE statement R13. Print it, or print three versions so neighbours cannot copy by letter; the key gives the letter for each version.
part Higher
Equations of direct and inverse proportion worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A printer prints at a constant rate. The time taken to print a batch of forms is inversely proportional to the printer's speed, in pages per minute. Printing at 20 pages per minute takes 15 minutes. Work out how long the same batch takes to print at 25 pages per minute. Give your answer in minutes.
- 2.y is inversely proportional to x², and x is positive. When x = 2, y = 45. Construct the equation connecting x and y, then work out the value of x when y = 5.
- 3.The strength of a radio signal, in units, is inversely proportional to the square of the distance from the transmitter, in km. At a distance of 2 km the signal strength is 20 units. Construct the equation connecting signal strength S and distance d, then work out the distance at which the signal strength is 5 units.
- 4.Two quantities x and y are inversely proportional. When x = 2, the value of y is 15. Work out the value of y when x = 5.
- 5.The time taken for a train journey is inversely proportional to the average speed of the train. At an average speed of 60 km/h the journey takes 2 hours. Work out the time taken at an average speed of 40 km/h.
- 6.y is directly proportional to x². When x = 3, y = 45. Construct the equation connecting x and y, then work out the value of y when x = 5.
- 7.A coach journey of 240 km takes 3 hours. For this fixed distance the average speed needed is inversely proportional to the time taken. Work out the average speed needed to complete the same journey in 2 hours.
- 8.3 builders put up a fence in 12 days. All the builders work at the same rate, so the number of days is inversely proportional to the number of builders. Work out how long 9 builders take to put up the same fence.
- 9.y is inversely proportional to x, so y = k ÷ x. When x = 5, the value of y is 8. Work out the value of k.
- 10.The number of tickets a group can afford is inversely proportional to the price per ticket. At £4 per ticket, the group can afford 12 tickets. Work out how many tickets the group can afford at £6 per ticket.
- 11.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 12.y is directly proportional to √x. When x = 4, y = 8. Construct the equation connecting x and y, then work out the value of y when x = 9.
- 13.y is directly proportional to x², and x is positive. When x = 4, y = 32. Construct the equation connecting x and y, then work out the value of x when y = 200.
- 14.y is inversely proportional to x². When x = 2, y = 8. Construct the equation connecting x and y, then work out the value of y when x = 4.
- 15.The cost of manufacturing a spherical container is proportional to the cube of its radius. A container of radius 3 cm costs £54 to manufacture. Construct the equation connecting cost C and radius r, then work out the cost of a container of radius 5 cm.
Answer key
- (a) 12 — Speed × time is constant: k = 20 × 15 = 300. At 25 pages per minute, the time is 300 ÷ 25 = 12 minutes. Getting 18.75 comes from treating speed and time as directly proportional and working out 15 × 25 ÷ 20 instead of dividing k by the new speed. Getting 20 comes from adding the increase in speed (25 − 20 = 5) onto the time (15 + 5 = 20). Getting 10 comes from subtracting that same increase in speed from the time (15 − 5 = 10).
- (a) 6 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 45: 2² = 4, so 45 = k ÷ 4, giving k = 45 × 4 = 180. The equation is y = 180/x². When y = 5: x² = 180 ÷ 5 = 36, so x = 6, taking the positive root because the question states that x is positive. Treating the relationship as inversely proportional to x itself gives k = 45 × 2 = 90 and then x = 90 ÷ 5 = 18, a different relationship. Multiplying by y instead of dividing by it when isolating x² gives x² = 180 × 5 = 900 and x = 30, the wrong operation. Stopping at x² = 36 without taking the square root leaves 36, not the value of x. When y = 5, x = 6.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (a) 6 — Method: for inverse proportion the product xy is the same for every pair, so find that product and use it to work back to the missing value. Working: xy = 2 × 15 = 30, so when x = 5 the equation 5y = 30 gives y = 30 ÷ 5 = 6. Answer: 6. The distractors: 37.5 comes from treating the pair as direct proportion and scaling y up with x, 15 × 5 ÷ 2, although in inverse proportion y falls as x rises; 30 is the constant product itself, given as a value of y rather than used to find one; 12 comes from additive thinking — x rises by 3, so 3 is taken off y — which would make the two quantities differ by a constant instead of multiplying to one.
- (c) 3 hours — Method: inverse proportion means speed × time is constant for the journey, so find that constant and divide it by the new speed. Working: 60 × 2 = 120, which is the distance in kilometres; at 40 km/h the time is 120 ÷ 40 = 3 hours. Answer: 3 hours. The distractors: 1.5 hours is the ratio of the speeds, 60 ÷ 40, given as a time instead of being used to scale the original 2 hours; 1 hour 20 minutes comes from treating time as directly proportional to speed, 2 × 40 ÷ 60, which has the slower train arriving sooner; 2 hours comes from finding the constant 120 and then dividing it by the original 60 km/h again, so the time never changes.
- (d) 125 — Since y is directly proportional to x², y = kx² for a constant k. Using x = 3, y = 45: 45 = k × 9, so k = 45 ÷ 9 = 5. The equation is y = 5x². When x = 5: 5² = 25, and 5 × 25 = 125, so y = 125. Reporting 5² = 25 on its own, without multiplying by the constant k, gives only the square of the new x-value, not the value of y. Treating the proportion as if y were proportional to x itself, rather than to x², gives k = 45 ÷ 3 = 15 and then y = 15 × 5 = 75, which is not this relationship. Squaring the new x-value as though squaring meant doubling it instead gives 5 × 10 = 50, not the true square. When x = 5, y = 125.
- (c) 120 km/h — Method: for a fixed distance the average speed multiplied by the time is constant, and that constant is the distance, so divide the distance by the new time. Working: speed × time = 240, so in 2 hours the speed needed is 240 ÷ 2 = 120 km/h. Answer: 120 km/h. The distractors: 80 km/h is the average speed of the original journey, 240 ÷ 3, which answers for the 3-hour timing rather than the 2-hour one; 160 km/h comes from halving the 3 hours to 1.5 hours and working out 240 ÷ 1.5, instead of using the 2 hours the question gives; 480 km/h comes from multiplying the distance by the 2 hours rather than dividing by it.
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
- (d) 40 — Substitute x = 5 and y = 8 into y = k ÷ x to get 8 = k ÷ 5, so k = 8 × 5 = 40. Getting 13 comes from adding the two numbers (5 + 8) instead of multiplying. Getting 1.6 comes from dividing 8 by 5 instead of multiplying. Getting 3 comes from subtracting the two numbers (8 − 5) instead of multiplying.
- (d) 8 — The product of price and number of tickets is constant: k = 4 × 12 = 48. At £6 per ticket, the number of tickets is 48 ÷ 6 = 8. Getting 18 comes from treating price and tickets as directly proportional and working out 12 × 6 ÷ 4 instead of dividing k by the new price. Getting 12 assumes the number of tickets does not change when the price changes. Getting 6 comes from writing down the new price instead of working out the number of tickets.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) 12 — Since y is directly proportional to √x, y = k√x. Using x = 4, y = 8: √4 = 2, so 8 = k × 2, giving k = 8 ÷ 2 = 4. The equation is y = 4√x. When x = 9: √9 = 3, so y = 4 × 3 = 12. Treating the relationship as if y were proportional to x itself, rather than to √x, gives k = 8 ÷ 4 = 2 and then y = 2 × 9 = 18, which is a different relationship. Multiplying k by the new x-value instead of by its square root gives y = 4 × 9 = 36, skipping the square root altogether. Reporting √9 on its own, without multiplying by k, gives only 3, not the value of y. When x = 9, y = 12.
- (a) 10 — Since y is directly proportional to x², y = kx². Using x = 4, y = 32: 32 = k × 16, so k = 32 ÷ 16 = 2. The equation is y = 2x². When y = 200: x² = 200 ÷ 2 = 100, so x = 10, taking the positive root because the question states that x is positive. Stopping at x² = 100 without taking the square root leaves 100, not the value of x itself. Treating the relationship as if y were proportional to x itself gives k = 32 ÷ 4 = 8 and then x = 200 ÷ 8 = 25, which is a different relationship entirely. Multiplying by k instead of dividing when rearranging gives x² = 200 × 2 = 400 and x = 20, which is not this equation rearranged correctly. The value of x when y = 200 is 10.
- (a) 2 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 8: 2² = 4, so 8 = k ÷ 4, giving k = 8 × 4 = 32. The equation is y = 32/x². When x = 4: 4² = 16, so y = 32 ÷ 16 = 2. Treating the relationship as inversely proportional to x itself, rather than to x², gives k = 8 × 2 = 16 and then y = 16 ÷ 4 = 4, a different relationship. Using x instead of x² in the new calculation gives y = 32 ÷ 4 = 8, skipping the square. Multiplying by x² instead of dividing by it gives y = 32 × 16 = 512, the wrong operation for an inverse relationship. When x = 4, y = 2.
- (b) £250 — Since cost is proportional to the cube of the radius, C = kr³. Using r = 3, C = 54: 3³ = 27, so 54 = k × 27, giving k = 54 ÷ 27 = 2. The equation is C = 2r³. When r = 5: 5³ = 125, so C = 2 × 125 = 250. Treating the relationship as proportional to r² instead of r³ gives k = 54 ÷ 9 = 6 and then C = 6 × 25 = 150, which models area scaling, not volume scaling. Treating it as proportional to r itself gives k = 54 ÷ 3 = 18 and then C = 18 × 5 = 90. Finding k correctly from the cube but then multiplying it by the radius instead of by the cube of the radius gives 2 × 5 = 10, which applies the right constant to the wrong power of r. The cost of a container of radius 5 cm is £250.
Build your own mix at the worksheet builder.