- 1.A cartographer is choosing a scale for a map to show a small park in as much detail as possible. Which of these scales would show the MOST detail — 1 : 500, 1 : 5000, or 1 : 50 000? Give the correct scale and reason.
- 2.An architect builds a scale model of a staircase before construction. The model is mathematically similar to the real staircase, at a scale of 1 : 10. The model covers a floor area of 0.4 m² on the plan. Work out the floor area the real staircase will cover, giving your answer in m².
- 3.Water flows into a tank at a constant rate. After 8 minutes the tank holds 200 litres. Write the ratio of time in minutes to volume in litres, in its simplest form.
- 4.A sequence is defined by the iterative rule x_{n+1} = 0.8x_n + 50, with x_0 = 200. Work out x_2, the value of the sequence after two iterations.
- 5.Two taxi firms show their charges on straight-line graphs, with the cost in pounds on the vertical axis and the distance in miles on the horizontal axis. Firm A's line passes through (0, 4) and (5, 14). Firm B's line passes through (0, 6) and (5, 21). Work out which firm charges more per mile.
- 6.A cyclist rides at a steady speed of 20 mph. Given that 1 mile ≈ 1.6 km, work out the cyclist's speed in km/h.
- 7.Aisha invests £3200 in Account A, which pays 5% compound interest each year. She also invests £3200 in Account B, which pays 3% simple interest each year. Work out how much more Account A is worth than Account B after 2 years.
- 8.The depth of water in a tank, in cm, is recorded every 10 seconds: at t = 10, depth = 32; at t = 20, depth = 45; at t = 30, depth = 56. Use the most appropriate chord from these readings to estimate the instantaneous rate of change of depth at t = 20.
- 9.The total cost, in pounds, of manufacturing a batch of components is plotted against the number of components produced. A tangent to this graph at a particular point has gradient 3.60. What does the value 3.60 represent?
- 10.The cost, in pounds, of hiring a minibus is modelled against the number of passengers booked. A tangent to the cost graph at 20 passengers passes through the points (16, 184) and (24, 216). Work out the instantaneous rate at which the cost increases with each extra passenger, at 20 passengers.
- 11.A scale drawing of a car park has a scale of 1 : 300. On the drawing, the car park has an area of 15 cm². Work out the real area of the car park, in square metres.
- 12.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 13.Given that 1 mile ≈ 1.6 km, work out a speed of 55 mph in km/h.
- 14.A coach travels the 54 miles from London to Brighton in 1 hour 30 minutes. Work out the average speed of the coach, in mph.
- 15.Two cars travel at constant speeds. Car A travels 150 km in 3 hours. Car B travels 180 km in 4 hours. Which car is faster, and what is its speed?
Answer key
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)
- (d) 218 — The rule x_{n+1} = 0.8x_n + 50 must be applied once for each step, using the result of the previous step every time — not the same starting value repeated. Starting from x_0 = 200: 0.8 × 200 = 160, so x_1 = 160 + 50 = 210. Then 0.8 × 210 = 168, so x_2 = 168 + 50 = 218. Stopping after one iteration leaves x_1 = 210, not x_2. Applying only the multiplier twice without adding 50 at each step uses 0.8² = 0.64, and 0.64 × 200 = 128, which drops the 50 completely. Adding 50 twice at the end instead of once per step, 128 + 100 = 228, still does not reproduce the actual recurrence, because the 50 added at the first step is itself multiplied by 0.8 at the second step. After two iterations, x_2 = 218.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (c) 32 km/h — Method: to change mph into km/h, multiply by the number of kilometres in a mile. Working: 20 × 1.6 = 32 km/h. So the cyclist's speed is 32 km/h. Distractor 12.5 km/h comes from dividing by 1.6 instead of multiplying. Distractor 21.6 km/h comes from adding 1.6 instead of multiplying by it. Distractor 20 km/h comes from not converting the units at all.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (c) 1.2 cm/s — To estimate an instantaneous rate of change at a point from a table of readings, use the chord that spans the point symmetrically — equal steps either side — because the over-estimate on one side and the under-estimate on the other largely cancel. Here that is the chord from t = 10 to t = 30. The change in depth is 56 − 32 = 24 and the change in time is 30 − 10 = 20, so the estimate is 24 ÷ 20 = 1.2 cm/s. The one-sided chord from t = 20 to t = 30 gives (56 − 45) ÷ (30 − 20) = 11 ÷ 10 = 1.1 cm/s, which estimates the rate somewhere between t = 20 and t = 30 rather than at t = 20 itself. Dividing the 20-second change in depth by the 10-second gap between consecutive readings gives 24 ÷ 10 = 2.4, mixing the change from one interval with the time from another. Reporting the change in depth, 24, on its own is not a rate at all, because it has not been divided by a time. The best estimate of the instantaneous rate of change of depth at t = 20 is 1.2 cm/s.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (d) £4 — The gradient of the tangent gives the instantaneous rate of change of cost with respect to the number of passengers, in pounds per passenger. The tangent passes through (16, 184) and (24, 216), so the change in cost is 216 − 184 = 32 and the change in passengers is 24 − 16 = 8. The gradient is 32 ÷ 8 = 4. Stopping after finding the change in cost, without dividing by the change in passengers, leaves 32, not a rate. Adding the two changes instead of dividing gives 32 + 8 = 40, which is not a rate either. Reading off only the change in passengers, 8, is not a rate at all — a rate needs the change in cost as well. The instantaneous rate is £4 per extra passenger.
- (d) 135 m² — Method: for area, the scale factor must be squared. Working: area scale = 300² = 90 000. 15 × 90 000 = 1,350,000 cm². Convert to m² by dividing by 10 000: 1,350,000 ÷ 10 000 = 135 m². Wrong options: 0.45 m² comes from using the linear scale factor (×300) instead of squaring it; 1,350,000 m² comes from forgetting to convert the answer from cm² to m²; 13,500 m² comes from dividing by 100 instead of 10 000 when converting units.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (c) 88 km/h — Multiply the speed in mph by the conversion factor: 55 × 1.6 = 88 km/h. Dividing by 1.6 instead of multiplying gives 55 ÷ 1.6 ≈ 34.38 km/h, going the wrong way between the units. Adding the conversion factor instead of multiplying gives 55 + 1.6 = 56.6 km/h, treating the factor as an amount rather than a multiplier. Multiplying by 0.6 instead of 1.6 gives 55 × 0.6 = 33 km/h, using only part of the conversion factor. 55 mph is equal to 88 km/h.
- (d) 36 mph — First convert 1 hour 30 minutes to hours: 30 minutes is half an hour, so the time is 1.5 hours. Then divide the distance by the time: 54 ÷ 1.5 = 36 mph. Reading 1 hour 30 minutes as 1.3 hours (writing the minutes after the decimal point instead of as a fraction of 60) gives 54 ÷ 1.3 ≈ 41.54 mph. Working out 54 ÷ 30 = 1.8 divides by the number of minutes only, ignoring the hour. Working out 54 × 1.5 = 81 multiplies by the time instead of dividing. The coach's average speed is 36 mph.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.