Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.It takes 2 identical pumps 10 hours to empty a flooded basement. Working at the same rate, work out how many hours 5 of these pumps would take to empty the same basement.
- 2.A metal has a density of 7.8 g/cm³. Work out the density of the metal in kg/m³.
- 3.A savings account starts with £500. Each year, 4% interest is added, and then £30 is withdrawn from the account. Which recurrence correctly models the balance, £S_n, after n years, with S_0 = 500?
- 4.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 5.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
- 6.A 750 g box of cereal costs £2.70. A 500 g box of the same cereal costs £1.95. Work out which box is better value, and its cost per 100 g.
- 7.A charity collects donations from adults and children in the ratio 5:2. Altogether, £238 is collected. Work out how much more the adults donate than the children.
- 8.A company's turnover this year is £180,000. Last year's turnover was £120,000. Write down this year's turnover as a percentage of last year's turnover.
- 9.The manufacturing cost of a specialist lens, in pounds, is proportional to the square root of its diameter, in millimetres. A lens of diameter 9 mm costs £12 to manufacture. Construct the equation connecting cost C and diameter d, then work out the cost of manufacturing a lens of diameter 16 mm.
- 10.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 11.An architect builds a scale model of a staircase before construction. The model is mathematically similar to the real staircase, at a scale of 1 : 10. The model covers a floor area of 0.4 m² on the plan. Work out the floor area the real staircase will cover, giving your answer in m².
- 12.The time taken for a train journey is inversely proportional to the average speed of the train. At an average speed of 60 km/h the journey takes 2 hours. Work out the time taken at an average speed of 40 km/h.
- 13.A model railway is built at a scale where the ratio of model length to real length is 1 : 76. Given that a real carriage is 20.6 metres long, work out the length of the model carriage in centimetres, to 1 decimal place.
- 14.A delivery driver travels 45 km in the first 30 minutes of a journey, and then a further 75 km in the next 1 hour. Work out her average speed for the whole journey, in km/h.
- 15.Map A has a scale of 1 : 25000 and Map B has a scale of 1 : 50000, both showing the same area. A real distance of 10 km is measured on each map. On which map does this distance appear as the longer length, and how long is it on that map, in centimetres?
Answer key
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
- (a) S_{n+1} = 1.04S_n − 30 — Adding 4% interest multiplies the balance by 1 + 0.04 = 1.04. Withdrawing £30 afterwards subtracts a fixed 30, giving S_{n+1} = 1.04S_n − 30. Writing +30 instead of −30 mistakes a withdrawal for a deposit — the £30 leaves the account, so it must be subtracted. Writing 0.96 instead of 1.04 treats the 4% as a decrease rather than an increase, as if the interest were shrinking the balance instead of growing it. Writing 1.4 instead of 1.04 turns 4% into 40%, a common slip when converting a percentage to a multiplier — 4% as a decimal is 0.04, so the multiplier is 1.04, not 1.4. Always convert the percentage to a decimal first, then add 1 for growth or subtract from 1 for decay, before applying any fixed amount that is added or removed.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (d) The 750 g box, at 36p per 100 g — Work out the cost per 100 g of each box. 750 g box: 270p ÷ 7.5 = 36p per 100 g. 500 g box: 195p ÷ 5 = 39p per 100 g. The lower cost per 100 g is the better value, so the 750 g box at 36p per 100 g is the answer. Choosing the 500 g box at 39p per 100 g gets the maths right but picks the higher unit price, not realising a smaller cost per 100 g is the better deal. Choosing the 500 g box because £1.95 is lower than £2.70 compares the total prices without allowing for the different pack sizes at all. Working out 270 ÷ 5 = 54p divides the 750 g box's price by the wrong number of hundred-grams (the 500 g box's), giving a rate that belongs to neither box. The 750 g box, at 36p per 100 g, is the better value.
- (a) £102 — Method: find the value of one part of the ratio, then work out each group's share before comparing them. Working: the ratio 5:2 has 5 + 2 = 7 parts, so one part is £238 ÷ 7 = £34. Adults donate 5 × £34 = £170 and children donate 2 × £34 = £68, so adults donate £170 − £68 = £102 more than children. So the difference is £102. Distractor £68 is only the children's donation, without finding the difference. Distractor £170 is only the adults' donation, without finding the difference. Distractor £136 comes from doubling the children's donation instead of subtracting it from the adults' donation.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
- (b) £16 — Since cost is proportional to the square root of diameter, C = k√d. Using d = 9, C = 12: √9 = 3, so 12 = k × 3, giving k = 12 ÷ 3 = 4. The equation is C = 4√d. When d = 16: √16 = 4, so C = 4 × 4 = 16. Halving the new diameter instead of taking its square root gives 16 ÷ 2 = 8, and then C = 4 × 8 = 32 — halving a number is not the same as taking its square root, as √16 = 4, not 8. Multiplying k by the diameter itself instead of by its square root gives C = 4 × 16 = 64, skipping the square root altogether. Reporting √16 on its own, without multiplying by k, gives only 4, not the cost. The cost of manufacturing a lens of diameter 16 mm is £16.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (c) 3 hours — Method: inverse proportion means speed × time is constant for the journey, so find that constant and divide it by the new speed. Working: 60 × 2 = 120, which is the distance in kilometres; at 40 km/h the time is 120 ÷ 40 = 3 hours. Answer: 3 hours. The distractors: 1.5 hours is the ratio of the speeds, 60 ÷ 40, given as a time instead of being used to scale the original 2 hours; 1 hour 20 minutes comes from treating time as directly proportional to speed, 2 × 40 ÷ 60, which has the slower train arriving sooner; 2 hours comes from finding the constant 120 and then dividing it by the original 60 km/h again, so the time never changes.
- (c) 27.1 cm — The model length is 20.6 ÷ 76 = 0.271052... metres. Converting to centimetres by multiplying by 100 gives 27.1052..., which rounds to 27.1 cm. Forgetting to convert metres to centimetres leaves the answer as 0.271052... metres, which rounds to 0.3 cm if the unit is simply relabelled. Multiplying by 1000 instead of 100 when converting metres to centimetres gives 271.052..., which rounds to 271.1 cm. Multiplying by 76 instead of dividing, 20.6 × 76 = 1565.6, uses the scale factor the wrong way round — that would be the real length if the model were 20.6 units long, not the other way round.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (c) Map A, where the distance is 40 cm — 10 km = 1,000,000 cm. On Map A: 1000000 ÷ 25000 = 40 cm. On Map B: 1000000 ÷ 50000 = 20 cm. Since 40 cm is longer than 20 cm, the same real distance appears longer on Map A, the map with the smaller scale number. 'Map B, where the distance is 20 cm' has the correct working for Map B but names the wrong map as the one with the longer length. 'Map A, where the distance is 20 cm' correctly identifies Map A but pairs it with Map B's length. 'Map B, where the distance is 40 cm' correctly identifies Map A's length but attaches it to the wrong map.
Build your own mix at the worksheet builder.