Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The population of a town, P thousand, is plotted against time, t years, since 2020. A tangent to the graph at t = 6 has gradient 2.5. What does this gradient represent?
- 2.A vehicle is worth £18000. Its value decreases by 15% each year. Using the recurrence V_{n+1} = 0.85V_n, with V_0 = 18000, find the first whole number of years after which the vehicle's value drops below £10000.
- 3.An architect builds a scale model of a staircase before construction. The model is mathematically similar to the real staircase, at a scale of 1 : 10. The model covers a floor area of 0.4 m² on the plan. Work out the floor area the real staircase will cover, giving your answer in m².
- 4.A recipe for 8 muffins needs 200 g of sugar. Sam wants to make 20 muffins for a bake sale, and he already has 350 g of sugar. Work out how many more grams of sugar he needs to buy.
- 5.y is directly proportional to √x. When x = 4, y = 8. Construct the equation connecting x and y, then work out the value of y when x = 9.
- 6.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 7.The density of a type of wood is 0.8 g/cm³. Work out the mass of a piece of this wood with a volume of 150 cm³.
- 8.A tangent to the graph of population against time at the point where t = 4 passes through (2, 180) and (6, 260). Work out the instantaneous rate of change of the population at t = 4, in people per year.
- 9.In a choir of 30 singers, 40% are altos and the rest are sopranos. Write the number of sopranos as a fraction of the number of altos. Give your answer in its simplest form.
- 10.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
- 11.A mobile phone tariff is shown on a straight-line graph with the monthly cost, C pounds, on the vertical axis and the amount of data used, g gigabytes, on the horizontal axis. The line passes through (0, 10) and (8, 26). Work out the gradient and say what it represents.
- 12.A shop's daily profit, in pounds, is plotted against the price charged for an item, in pounds. A tangent to the profit graph at a price of £15 passes through the points (12, 540) and (18, 480). Work out the instantaneous rate of change of profit with respect to price at £15, and state whether profit is increasing or decreasing there.
- 13.A stall sells bottles of juice. Two bottles cost £3.00, five bottles cost £7.50 and eight bottles cost £12.00. The cost, C pounds, is in a fixed ratio to the number of bottles, n. Write down a formula for C in terms of n.
- 14.The temperature of a chemical reaction, in °C, is modelled by T = 80 − 6t + 0.5t², where t is the time in minutes after the reaction starts. Which of these four statements about the reaction between t = 2 and t = 6 minutes is correct?
- 15.Two printers' running costs are shown on separate straight-line graphs of total cost against number of pages printed. Printer A's graph has gradient £0.04 per page. Printer B's graph has gradient £0.05 per page. Work out how much cheaper it is to print 200 pages on Printer A than on Printer B, based on these running costs alone.
Answer key
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (d) 4 years — Apply the recurrence repeatedly. V_1 = 0.85 × 18000 = 15300. V_2 = 0.85 × 15300 = 13005. V_3 = 0.85 × 13005 = 11054.25. V_4 = 0.85 × 11054.25 = 9396.1125. V_3 = £11054.25 is still above £10000, but V_4 = £9396.11 has dropped below it, so the answer is 4 years. Stopping at V_3 and calling it '3 years' misreads £11054.25 as already below £10000, or comes from wrongly modelling the fall as a flat £2700 a year (15% of the original value each time, without compounding), which crosses £10000 a year too early. Continuing one extra step to V_5 = 0.85 × 9396.1125 = 7986.70 and calling it '5 years' overshoots, since the value had already dropped below £10000 at V_4. Doubling the percentage decrease to 30% by mistake gives V_1 = 0.7 × 18000 = 12600, then V_2 = 0.7 × 12600 = 8820, which is already below £10000 after only 2 years — the wrong rate crosses the threshold too fast.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
- (a) 150 g — Method: scale the recipe to find the total sugar needed, then subtract the sugar Sam already has. Working: 200 ÷ 8 × 20 = 500, so 500 g is needed in total; 500 − 350 = 150, so 150 g still to buy. Stopping after finding the total, 500, without subtracting what he has gives 500 g. Scaling the wrong way round, 200 × 8 ÷ 20 = 80, wrongly suggests he already has enough, giving 0 g. Adding the amount he has instead of subtracting it, 500 + 350 = 850, gives 850 g.
- (b) 12 — Since y is directly proportional to √x, y = k√x. Using x = 4, y = 8: √4 = 2, so 8 = k × 2, giving k = 8 ÷ 2 = 4. The equation is y = 4√x. When x = 9: √9 = 3, so y = 4 × 3 = 12. Treating the relationship as if y were proportional to x itself, rather than to √x, gives k = 8 ÷ 4 = 2 and then y = 2 × 9 = 18, which is a different relationship. Multiplying k by the new x-value instead of by its square root gives y = 4 × 9 = 36, skipping the square root altogether. Reporting √9 on its own, without multiplying by k, gives only 3, not the value of y. When x = 9, y = 12.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (d) 120 g — Mass = density × volume, so 0.8 × 150 = 120 g. Working out 150 ÷ 0.8 = 187.5 divides by the density instead of multiplying, the wrong way round for finding a mass. Working out 150 × 8 = 1200 misplaces the decimal point in the density, treating 0.8 g/cm³ as 8 g/cm³. Working out 150 − 0.8 = 149.2 simply subtracts the density from the volume, which does not give a mass. The piece of wood has a mass of 120 g.
- (a) 20 people/year — The gradient of a tangent to a graph at a point equals the instantaneous rate of change of the quantity there. A straight line's gradient is the change in the vertical value divided by the change in the horizontal value between two points on it. Here the tangent passes through (2, 180) and (6, 260), so the change in population is 260 − 180 = 80 and the change in time is 6 − 2 = 4. The gradient is 80 ÷ 4 = 20. Reporting the change in population, 80, on its own is not a rate, because that growth happened over 4 years and has not been divided by them. Adding the two changes instead of dividing gives 80 + 4 = 84, which is not a rate. Subtracting the coordinates in the wrong order, (180 − 260) ÷ (6 − 2), gives −80 ÷ 4 = −20, the wrong sign. The instantaneous rate of change of the population at t = 4 is 20 people per year.
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (d) Profit is decreasing by £10 per £1 rise in price. — The gradient of a tangent gives the instantaneous rate of change of profit with respect to price, found from the change in profit divided by the change in price between two points on the tangent. Here the tangent passes through (12, 540) and (18, 480), so the change in profit is 480 − 540 = −60 and the change in price is 18 − 12 = 6. The gradient is −60 ÷ 6 = −10. A negative gradient means profit is decreasing as price increases, so profit is decreasing at an instantaneous rate of £10 for every £1 rise in price. Subtracting the profits in the wrong order, 540 − 480 = 60, and dividing by the same change in price, 60 ÷ 6 = 10, gives a positive value and the wrong direction — profit is not increasing at £15. Stopping after finding only the change in profit, 480 − 540 = −60, without dividing by the change in price, is not a rate at all. Reading off the change in price, 6, and calling it the rate gives £6 per £1 rise in price, but 6 is only the width of the price interval — it is not a change in profit at all, and profit falls across that interval, so the direction is wrong too. The instantaneous rate of change of profit with respect to price at £15 is a decrease of £10 per £1 rise in price.
- (c) C = 1.5n — Method: a fixed ratio between C and n means C is always the same multiple of n, and that multiple is the cost of one bottle. Working: 3.00 ÷ 2 = 1.5, 7.50 ÷ 5 = 1.5 and 12.00 ÷ 8 = 1.5, so every bottle costs £1.50 and C = 1.5n. Answer: C = 1.5n. The distractors: C = n + 1 comes from subtracting on the first row, 3 − 2 = 1, and adding that difference instead of multiplying; it fits the first row and fails the other two, which is why three rows are given; C = 3n reads the £3.00 as the price of one bottle when it is the price of two; C = n/1.5 divides the number of bottles by the price of one bottle, which works out how many bottles a pound buys instead of what n bottles cost.
- (c) Average rate, t = 2 to 6, is −2°C/min — First find the temperature at each end of the interval. At t = 2, T = 80 − 6 × 2 + 0.5 × 2² = 80 − 12 + 2 = 70. At t = 6, T = 80 − 6 × 6 + 0.5 × 6² = 80 − 36 + 18 = 62. The average rate of change over the interval is the change in T divided by the change in t: 62 − 70 = −8, then −8 ÷ 4 = −2°C per minute, so the statement about the average rate is correct. The instantaneous rate at t = 6 is not −2: completing the square gives T = 0.5(t − 6)² + 62, so t = 6 is the turning point of the curve, where the tangent is horizontal and the rate is 0°C per minute — the reaction has stopped cooling by then. The instantaneous rate at t = 2 is not −2 either: a short chord centred on t = 2, from t = 1.9 (T = 70.405) to t = 2.1 (T = 69.605), gives −0.8 ÷ 0.2 = −4°C per minute, so the reaction is cooling twice as fast at the start of the interval as the average over it. Saying the temperature falls 2°C in total confuses the RATE, −2°C per minute, with a TOTAL drop, which is 70 − 62 = 8°C over the four minutes. Always check whether a figure is a rate, per minute, or a total change.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
Build your own mix at the worksheet builder.