- 1.On a straight-line graph the volume of water, V litres, in a tank is plotted on the vertical axis and the time, t minutes, on the horizontal axis. The line passes through (2, 50) and (6, 130). Work out the gradient of the line and give its units.
- 2.A population of penguins on an island is 2400. The population is predicted to grow by 7% each year. Work out the predicted population after 2 years, to the nearest whole number.
- 3.A cyclist travels 18 km in 45 minutes. Work out the average speed, in km/h.
- 4.A recipe for 8 muffins needs 200 g of sugar. Sam wants to make 20 muffins for a bake sale, and he already has 350 g of sugar. Work out how many more grams of sugar he needs to buy.
- 5.Triangle ABC is mathematically similar to triangle PQR, with AB corresponding to PQ and BC corresponding to QR. AB = 6 cm, BC = 8 cm and PQ = 12 cm. Work out the length of QR.
- 6.A shop sells ribbon by the metre. 2 m costs £3.00, 4 m costs £6.00, and 7 m costs £10.50. Does this data show that the cost is directly proportional to the length of ribbon bought? Choose the correct verdict and reason.
- 7.A trust fund contains £8000. Each year, 5% interest is added, and then £600 is paid out to a charity. Work out the amount remaining in the fund after 2 years.
- 8.For the pairs x = 6, y = 15 and x = 10, y = 25, which statement is correct?
- 9.A garden centre has 90 rose bushes in stock. It receives a delivery that increases its stock of rose bushes by 20%. In the same week it sells 150 lavender bushes. Work out the new number of rose bushes, then write it as a fraction of the number of lavender bushes sold, giving your answer in its simplest form.
- 10.Two mathematically similar triangular flags have areas in the ratio 4 : 25. The height of the smaller flag is 6 cm. Work out the height of the larger flag.
- 11.Before a charity campaign, donations were £6400 per month. Donations grew by 8% in the first year after the campaign, and then fell by 3% in the second year as interest faded. Work out the amount donated per month at the end of the second year, to the nearest pound.
- 12.An Ordnance Survey map has a scale of 1 : 50 000. A cycle route measures 9.4 cm on the map. Work out the real length of the route, in kilometres.
- 13.A cyclist rides 17.5 km on Saturday and 12.25 km on Sunday. Write the distance ridden on Saturday as a fraction of the distance ridden on Sunday, giving your answer in its simplest form.
- 14.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 15.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
Answer key
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.
- (d) 2748 — A 7% increase each year means the value becomes 100% + 7% = 107% of the previous year's value, and 107% = 1.07, so the multiplier is 1.07. Multiply by 1.07 for each of the 2 years: 2400 × 1.07 × 1.07 = 2747.76, which rounds to 2748. (2736 comes from using simple growth instead of compound: 2400 + 2 × (2400 × 0.07) = 2736. 2568 is the population after only 1 year, 2400 × 1.07, forgetting the second year's growth. 2747 comes from rounding 2747.76 down instead of up to the nearest whole number.)
- (b) 24 km/h — First convert 45 minutes to hours: 45 ÷ 60 = 0.75 hours. Then divide the distance by the time: 18 ÷ 0.75 = 24 km/h. Reading 45 minutes as 0.45 hours (writing the minutes after the decimal point instead of dividing by 60) gives 18 ÷ 0.45 = 40 km/h. Working out 18 × 0.75 = 13.5 multiplies by the time instead of dividing. Working out 18 ÷ 45 = 0.4 divides by 45 without ever converting the minutes to hours. The cyclist's average speed is 24 km/h.
- (a) 150 g — Method: scale the recipe to find the total sugar needed, then subtract the sugar Sam already has. Working: 200 ÷ 8 × 20 = 500, so 500 g is needed in total; 500 − 350 = 150, so 150 g still to buy. Stopping after finding the total, 500, without subtracting what he has gives 500 g. Scaling the wrong way round, 200 × 8 ÷ 20 = 80, wrongly suggests he already has enough, giving 0 g. Adding the amount he has instead of subtracting it, 500 + 350 = 850, gives 850 g.
- (c) 16 cm — Corresponding sides of similar triangles are all in the same ratio. Use the pair whose lengths are both known: the scale factor from triangle ABC to triangle PQR is 12 ÷ 6 = 2. Since QR corresponds to BC, multiply BC by that scale factor: 8 × 2 = 16, so QR = 16 cm.
- (a) Yes — the cost per metre is £1.50 each time — Direct proportion holds if the cost per metre is the same every time. Check each pair: 3.00 ÷ 2 = 1.50, 6.00 ÷ 4 = 1.50, and 10.50 ÷ 7 = 1.50. All three give the same rate, £1.50 per metre, so the data does show direct proportion. Saying only that the cost increases as the length increases is not enough on its own — many non-proportional relationships also increase, so this reason does not prove proportion. Misreading 10.50 ÷ 7 as 1.05 by misplacing the decimal point gives a false mismatch that is not actually there. Requiring every length to be a double of another confuses a special case (doubling) with the general test, which is that the rate itself stays constant. The data does show direct proportion, at £1.50 per metre.
- (c) £7590 — Apply interest, then subtract the payment, once for each year. Year 1: 8000 × 1.05 = 8400, then 8400 − 600 = 7800. Year 2: 7800 × 1.05 = 8190, then 8190 − 600 = 7590, so £7590 remains after 2 years. Forgetting the payments altogether and only compounding the interest gives 8000 × 1.05 = 8400, then 8400 × 1.05 = 8820 — this ignores that £600 leaves the fund every year. Subtracting the £600 BEFORE adding interest each year, instead of after, gives (8000 − 600) × 1.05 = 7770, then (7770 − 600) × 1.05 = 7528.50, which changes the order the two operations happen in and so changes the amount that earns interest each year. Subtracting the two payments as one lump sum of £1200 at the very end, from the no-withdrawal total 8820 − 1200 = 7620, ignores that the first £600 withdrawal also stops earning interest during the second year. Always apply interest, then the withdrawal, in that order, once for every single year.
- (c) They are in direct proportion, because y ÷ x = 2.5 for both pairs. — Testing direct proportion means checking that y ÷ x is the same for every pair: 15 ÷ 6 = 2.5 and 25 ÷ 10 = 2.5, so the quantities are in direct proportion. Saying they are not in proportion because x + y differs uses addition, which is not the correct test for proportion. Saying they are not in proportion because y − x differs also uses the wrong test — subtraction, not division. Saying they are in proportion because x × y is 90 and 250 uses multiplication, which is the test for inverse proportion, and the two products are not even equal to each other, so this option also contradicts itself.
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (a) 15 cm — Take the square root of each part of the area ratio to find the length ratio: the square root of 4 is 2 and the square root of 25 is 5, giving a length ratio of 2 : 5. Multiply the smaller flag's height by the scale factor 5 ÷ 2 = 2.5: 6 × 2.5 = 15, so the larger flag is 15 cm tall. Giving 37.5 cm uses the area ratio, 25 ÷ 4 = 6.25, directly as the scale factor without square-rooting it first (6 × 6.25 = 37.5). Giving 2.4 cm applies the length ratio the wrong way round, scaling the smaller flag down by 2 ÷ 5 instead of up by 5 ÷ 2 (6 × 0.4 = 2.4). Giving 27 cm adds the difference between the two area-ratio numbers, 25 − 4 = 21, onto the smaller height instead of using it as a scale factor (6 + 21 = 27).
- (d) £6705 — After the first year: £6400 × 1.08 = £6912. After the second year: £6912 × 0.97 = £6704.64, which rounds to £6705 (nearest pound). £6720 comes from treating the +8% and −3% changes as a single net +5% change applied to the original amount instead of applying each change in turn: £6400 × 1.05 = £6720. £6912 comes from applying only the first year's growth and stopping there, without applying the second year's fall. £7104 comes from adding the two percentages together as +11% and applying that to the original amount instead of applying each change to the correct starting amount in turn: £6400 × 1.11 = £7104.
- (d) 4.7 km — Multiply the map length by the scale factor: 9.4 × 50 000 = 470 000 cm. Convert to kilometres: 470 000 cm = 4700 m = 4.7 km. Converting only to metres and calling the answer 4700 kilometres mistakes metres for kilometres. Misreading the scale as 1 : 5000 instead of 1 : 50 000, 9.4 × 5000 = 47 000 cm = 0.47 km, is ten times too small. Misplacing the decimal point in 9.4 and effectively using 94, 94 × 50 000 = 4 700 000 cm = 47 km, is ten times too big.
- (a) 10/7 — Put Saturday's distance over Sunday's distance: 17.5/12.25. Multiply both numbers by 100 to clear the decimals: 1750/1225. Divide both by their highest common factor, 175: 1750÷175 = 10, 1225÷175 = 7, giving 10/7. (7/10 comes from writing the distances the wrong way round. 3/7 comes from finding the difference, 17.5 − 12.25 = 5.25 km, and writing it as a fraction of Sunday's distance, 5.25/12.25. 10/17 comes from comparing Saturday's distance to the total distance ridden, 17.5/29.75.)
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.