Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A stall sells bottles of juice. Two bottles cost £3.00, five bottles cost £7.50 and eight bottles cost £12.00. The cost, C pounds, is in a fixed ratio to the number of bottles, n. Write down a formula for C in terms of n.
- 2.A garden centre has 90 rose bushes in stock. It receives a delivery that increases its stock of rose bushes by 20%. In the same week it sells 150 lavender bushes. Work out the new number of rose bushes, then write it as a fraction of the number of lavender bushes sold, giving your answer in its simplest form.
- 3.A hiker's distance from the start of the trail, in kilometres, is plotted against time, in minutes, since she set off. At t = 45 minutes she stops to rest, so her distance from the start is neither increasing nor decreasing at that instant. Which statement about the tangent to the distance–time graph at t = 45 minutes is correct?
- 4.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 5.The population of a town, P thousand, is plotted against time, t years, since 2020. A tangent to the graph at t = 6 has gradient 2.5. What does this gradient represent?
- 6.A tangent to the graph of population against time at the point where t = 4 passes through (2, 180) and (6, 260). Work out the instantaneous rate of change of the population at t = 4, in people per year.
- 7.y is directly proportional to x. When x = 4, y = 10. Work out the value of y when x = 6.
- 8.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 9.In a choir of 30 singers, 40% are altos and the rest are sopranos. Write the number of sopranos as a fraction of the number of altos. Give your answer in its simplest form.
- 10.A scale model of a bridge is built at a scale of 1 : 120. The real bridge is 84 m long. Work out the length of the model, in centimetres.
- 11.Write 45 minutes : 2 hours as a ratio in its simplest form.
- 12.A map has a scale of 1 : 25 000. Two towns are 5 km apart in real life. Work out the distance between the towns on the map, in centimetres.
- 13.The total cost, in pounds, of manufacturing a batch of components is plotted against the number of components produced. A tangent to this graph at a particular point has gradient 3.60. What does the value 3.60 represent?
- 14.A curve has equation y = x² + 2x. Work out the average rate of change of y with respect to x over the interval from x = 1 to x = 4.y = x² + 2x
- 15.A furniture maker builds two mathematically similar bookcases. The smaller bookcase is 40 cm tall and uses 2 m² of wood. The larger bookcase is 60 cm tall. Work out the area of wood needed for the larger bookcase, giving your answer in m².
Answer key
- (c) C = 1.5n — Method: a fixed ratio between C and n means C is always the same multiple of n, and that multiple is the cost of one bottle. Working: 3.00 ÷ 2 = 1.5, 7.50 ÷ 5 = 1.5 and 12.00 ÷ 8 = 1.5, so every bottle costs £1.50 and C = 1.5n. Answer: C = 1.5n. The distractors: C = n + 1 comes from subtracting on the first row, 3 − 2 = 1, and adding that difference instead of multiplying; it fits the first row and fails the other two, which is why three rows are given; C = 3n reads the £3.00 as the price of one bottle when it is the price of two; C = n/1.5 divides the number of bottles by the price of one bottle, which works out how many bottles a pound buys instead of what n bottles cost.
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (c) The tangent is horizontal, so its gradient is 0. — Method: at any point where a distance–time graph is momentarily neither increasing nor decreasing, the tangent to the graph at that point is horizontal, and the gradient of a horizontal line is 0 — this is the instantaneous rate of change at that instant. Working: since the hiker's distance is neither increasing nor decreasing at t = 45 minutes, the tangent there is horizontal, so its gradient is 0. Claiming the tangent is vertical, with an undefined gradient, is the opposite of what the stem says: a vertical tangent would mean the distance was changing infinitely fast at that instant, not that it had stopped changing, and on a distance–time graph it cannot happen at all. Reading the gradient as 45, the time value given in the stem, mistakes a value used to LOCATE the point for the rate of change AT that point. Claiming the gradient cannot be found without also knowing the distance at t = 45 minutes overlooks that 'momentarily stationary' already tells you the rate of change directly, without needing to read any distance value at all. Whenever a stem tells you a quantity is momentarily not changing, that is telling you the instantaneous rate of change directly — it is 0, and no further data is needed to find it.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (a) 20 people/year — The gradient of a tangent to a graph at a point equals the instantaneous rate of change of the quantity there. A straight line's gradient is the change in the vertical value divided by the change in the horizontal value between two points on it. Here the tangent passes through (2, 180) and (6, 260), so the change in population is 260 − 180 = 80 and the change in time is 6 − 2 = 4. The gradient is 80 ÷ 4 = 20. Reporting the change in population, 80, on its own is not a rate, because that growth happened over 4 years and has not been divided by them. Adding the two changes instead of dividing gives 80 + 4 = 84, which is not a rate. Subtracting the coordinates in the wrong order, (180 − 260) ÷ (6 − 2), gives −80 ÷ 4 = −20, the wrong sign. The instantaneous rate of change of the population at t = 4 is 20 people per year.
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (c) 70 cm — Method: convert the real length to centimetres, then divide by the scale factor. Working: 84 m = 8400 cm. 8400 ÷ 120 = 70 cm. Wrong options: 0.7 cm comes from dividing 84 by 120 without converting metres to centimetres; 1,008,000 cm comes from multiplying instead of dividing (8400 × 120); 7 cm comes from converting 84 m to 840 cm (using ×10 instead of ×100) before dividing.
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (c) 20 cm — Convert 5 km to centimetres: 5 km = 5000 m = 500 000 cm. Divide by the scale factor: 500 000 ÷ 25 000 = 20, giving 20 cm. Converting only as far as metres, 5000 ÷ 25 000 = 0.2, gives 0.2 cm — the conversion to centimetres was never finished. Dropping a zero in the division gives 2 cm, ten times too small. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 500 000 ÷ 2500 = 200 cm, ten times too big.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (a) 7 — The average rate of change of y with respect to x over an interval is the change in y divided by the change in x between its two endpoints — the gradient of the chord joining them, not a rate at a single point. At x = 1: 2 × 1 = 2, so y = 1 + 2 = 3. At x = 4: 2 × 4 = 8, so y = 16 + 8 = 24. The change in y is 24 − 3 = 21 and the change in x is 4 − 1 = 3, so the average rate of change is 21 ÷ 3 = 7. Reporting the change in y, 21, on its own is not a rate of change, because it has not been divided by the 3 units of x over which it happened. Reporting 3 is not a rate either — 3 is the width of the interval, and also the value of y at x = 1, and neither of those measures how fast y is changing. Subtracting in the wrong order gives −21 ÷ 3 = −7, the wrong sign. The average rate of change of y with respect to x over the interval is 7.
- (b) 4.5 m² — The height ratio is 40 : 60, which simplifies to 2 : 3, so the larger bookcase is 1.5 times as tall as the smaller one. Areas scale with the square of the length scale factor, so the wood needed scales by 1.5² = 2.25. 2 × 2.25 = 4.5, so the larger bookcase needs 4.5 m² of wood. Giving 3 m² uses the length scale factor, 1.5, without squaring it (2 × 1.5 = 3). Giving 6.75 m² cubes the scale factor, 1.5³ = 3.375, as if wood coverage were a volume (2 × 3.375 = 6.75). Giving 2.25 m² is the squared scale factor on its own, without multiplying by the smaller bookcase's wood area of 2 m².
Build your own mix at the worksheet builder.