Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The height of water in a tank, h metres, t minutes after a tap is opened is modelled by h = 0.02t² + 0.5. Estimate the instantaneous rate of change of the height at t = 10, using the gradient of the chord joining t = 9 and t = 11.
- 2.A furniture designer makes a scale model of a wardrobe using a scale of 1 : 8. The real wardrobe is 2.4 m tall and 1.2 m wide. Work out the perimeter of the front face of the model wardrobe, in centimetres.
- 3.A force of 250 N acts on an area of 0.5 m². Using pressure = force ÷ area, work out the pressure, in pascals.
- 4.A sequence is defined by the iterative rule x_{n+1} = 0.5x_n + 20, with x_0 = 0. By working out x_1, x_2 and x_3, find the value that the sequence is approaching.
- 5.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
- 6.A water butt is being filled from a hosepipe at a constant rate while a small leak drains water out at a constant rate, giving a constant net rate of change. The volume of water in the butt, V litres, is shown on a straight-line graph against time, t minutes. The line passes through the points (5, 20) and (15, 60). The butt is empty at t = 0. Work out how many minutes it takes to reach a volume of 100 litres.
- 7.Two taxi firms show their charges on straight-line graphs, with the cost in pounds on the vertical axis and the distance in miles on the horizontal axis. Firm A's line passes through (0, 4) and (5, 14). Firm B's line passes through (0, 6) and (5, 21). Work out which firm charges more per mile.
- 8.A car is bought for £12000. Its value falls by 15% in the first year and by 10% in each year after that. Work out the value of the car 3 years after it was bought.
- 9.A cyclist rides at a steady speed of 20 mph. Given that 1 mile ≈ 1.6 km, work out the cyclist's speed in km/h.
- 10.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 11.A smoothie recipe combines 350 cm³ of mango juice with 650 cm³ of orange juice. Work out the total volume of the smoothie in litres.
- 12.The strength of a radio signal, in units, is inversely proportional to the square of the distance from the transmitter, in km. At a distance of 2 km the signal strength is 20 units. Construct the equation connecting signal strength S and distance d, then work out the distance at which the signal strength is 5 units.
- 13.Maya buys a vintage car for £15000. Its value is expected to increase by 4% each year for 2 years. She then plans to sell the car and use £2000 of the money from the sale to buy a trailer. Work out how much money she will have left after selling the car and buying the trailer.
- 14.Two printers' running costs are shown on separate straight-line graphs of total cost against number of pages printed. Printer A's graph has gradient £0.04 per page. Printer B's graph has gradient £0.05 per page. Work out how much cheaper it is to print 200 pages on Printer A than on Printer B, based on these running costs alone.
- 15.A scale drawing of a car park has a scale of 1 : 300. On the drawing, the car park has an area of 15 cm². Work out the real area of the car park, in square metres.
Answer key
- (d) 0.40 m/min — To estimate an instantaneous rate of change at a point without a diagram, use the gradient of a chord joining two points close to it, one on each side. At t = 9: 0.02 × 81 = 1.62, so h = 1.62 + 0.5 = 2.12. At t = 11: 0.02 × 121 = 2.42, so h = 2.42 + 0.5 = 2.92. The change in height is 2.92 − 2.12 = 0.80 and the change in time is 11 − 9 = 2, so the gradient of the chord is 0.80 ÷ 2 = 0.40. Reporting the change in height, 0.80, on its own is not a rate, because it has not been divided by the 2 minutes over which it happened. Using the chord from t = 0 (where h = 0.5) to t = 11 instead gives 2.92 − 0.5 = 2.42, and 2.42 ÷ 11 = 0.22, which is the average gradient over the whole 11 minutes, not the instantaneous rate at t = 10. Substituting t = 10 into the formula gives 0.02 × 100 + 0.5 = 2.50, which is the height of the water at that moment, not the rate at which the height is rising. The estimated instantaneous rate of change at t = 10 is 0.40 m/min.
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
- (c) 40 — Working out successive terms shows where the sequence is heading, but the terms themselves keep changing — the limit is the value where the sequence stops changing, so x_{n+1} = x_n = L there. Substituting into the rule: L = 0.5L + 20. Subtracting 0.5L from both sides: L − 0.5L = 20, so 0.5L = 20, and L = 20 ÷ 0.5 = 40. The individual terms are x_1 = 0.5 × 0 + 20 = 20, x_2 = 0.5 × 20 + 20 = 30 and x_3 = 0.5 × 30 + 20 = 35, getting closer to this value but not equal to it — 35 is only the third term, not the limit. Multiplying by 0.5 instead of dividing at the final step, 20 × 0.5 = 10, undoes the rearrangement rather than completing it, and gives a value smaller than terms the sequence has already passed. Writing the fixed-point equation with the wrong sign, L = 0.5L − 20, gives 0.5L = −20 and L = −40, which cannot be right since every term in the sequence is positive and increasing. The value the sequence is approaching is 40.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (d) 25 — Gradient = (60 − 20) ÷ (15 − 5) = 40 ÷ 10 = 4 litres per minute. Since the butt is empty at t = 0, V = 4t. Setting V = 100 gives t = 100 ÷ 4 = 25 minutes.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (d) £8262 — A fall of 15% is a multiplier of 0.85 and a fall of 10% is a multiplier of 0.9, and each multiplier acts on the value at the start of its own year. After year 1: 12000 × 0.85 = 10200. After year 2: 10200 × 0.9 = 9180. After year 3: 9180 × 0.9 = 8262. The value 3 years after the car was bought is £8262. Adding the percentages to make a single fall of 35% would be wrong, because the later falls are taken from smaller values.
- (c) 32 km/h — Method: to change mph into km/h, multiply by the number of kilometres in a mile. Working: 20 × 1.6 = 32 km/h. So the cyclist's speed is 32 km/h. Distractor 12.5 km/h comes from dividing by 1.6 instead of multiplying. Distractor 21.6 km/h comes from adding 1.6 instead of multiplying by it. Distractor 20 km/h comes from not converting the units at all.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (b) 1.00 litres — Total volume = 350 + 650 = 1000 cm³. Since 1000 cm³ = 1 litre, the smoothie is 1.00 litre. Using only the orange juice's 650 cm³ and converting that gives 0.65 litres, forgetting the mango juice entirely. Using only the mango juice's 350 cm³ gives 0.35 litres, forgetting the orange juice. Adding both volumes correctly to get 1000 cm³ but not converting to litres leaves the answer as 1000.00, which is the volume in the wrong unit.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (a) £14224 — Value after 2 years: £15000 × 1.04 × 1.04 = £16224. Money left after buying the trailer: £16224 − £2000 = £14224. £14200 comes from treating the two 4% increases as a single flat 8% increase applied once instead of compounding: £15000 × 1.08 = £16200, and £16200 − £2000 = £14200. £13600 comes from applying the 4% increase only once, for 1 year instead of 2: £15000 × 1.04 = £15600, and £15600 − £2000 = £13600. £18224 comes from adding the £2000 instead of subtracting it: £16224 + £2000 = £18224.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
- (d) 135 m² — Method: for area, the scale factor must be squared. Working: area scale = 300² = 90 000. 15 × 90 000 = 1,350,000 cm². Convert to m² by dividing by 10 000: 1,350,000 ÷ 10 000 = 135 m². Wrong options: 0.45 m² comes from using the linear scale factor (×300) instead of squaring it; 1,350,000 m² comes from forgetting to convert the answer from cm² to m²; 13,500 m² comes from dividing by 100 instead of 10 000 when converting units.
Build your own mix at the worksheet builder.