Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A cartographer is choosing a scale for a map to show a small park in as much detail as possible. Which of these scales would show the MOST detail — 1 : 500, 1 : 5000, or 1 : 50 000? Give the correct scale and reason.
- 2.A 1.5 kg bag of pasta costs £2.85 and a 2.4 kg bag of the same pasta costs £4.32. Work out which bag gives better value for money.
- 3.A shade of paint is made by mixing blue paint and white paint. To make 5 litres of the shade, 2 litres of blue paint is used and the rest is white paint. Write the ratio of blue paint to white paint in its simplest form.
- 4.A car travels at a constant speed. It travels 150 miles in 3 hours. At the same speed, work out how far it travels in 5 hours.
- 5.The population of a town, P thousand, is plotted against time, t years, since 2020. A tangent to the graph at t = 6 has gradient 2.5. What does this gradient represent?
- 6.The height of a ball, in metres, above the ground is plotted against time, in seconds, after it is thrown. The tangent to the graph at t = 1.5 seconds has gradient 2. Which of these four statements about the ball at t = 1.5 seconds is correct?
- 7.Ffion is paid £11.20 per hour. She works 6 hours on Monday and 4.5 hours on Tuesday. Work out her total pay for the two days.
- 8.The concentration of a pollutant in a lake, in arbitrary units, follows the recurrence C_{n+1} = 0.75C_n + 40, with C_0 = 500: each week, 25% of the pollutant breaks down naturally, and then a further 40 units enter the lake from run-off. An ecologist classifies the lake as safe once C_n first drops below 300. Find the first whole number of weeks after which the lake is safe.
- 9.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 10.Two investors put money into a business in the ratio 3:5. The first investor puts in £1,200. Work out the total amount invested by both investors.
- 11.A greenhouse's temperature, in °C, is recorded every hour during the day: 09:00, 15.0; 10:00, 18.4; 11:00, 20.1; 12:00, 19.8; 13:00, 17.2. Work out between which two consecutive readings the instantaneous rate of change of the temperature is most likely to have been zero.
- 12.A straight-line graph shows the cost, C pounds, of hiring a bike for h hours. The line passes through the points (1, 12) and (4, 27). Which of these statements about the line is true?
- 13.An online shop's total number of orders received is recorded at the end of each day for five consecutive days: Day 1, 1,284 orders; Day 2, 1,509 orders; Day 3, 1,830 orders; Day 4, 2,296 orders; Day 5, 2,510 orders. Work out between which two consecutive days the average rate of increase in orders was greatest.
- 14.y is directly proportional to x. When x = 5, y = 18. Work out the value of y when x = 15.
- 15.A concrete block exerts a force of 45 N on the ground through a base with an area of 0.05 m². Work out the pressure on the ground, in N/m².
Answer key
- (b) 1 : 500 — smallest real distance per cm (5 m), most detail — Method: compare what one centimetre represents in real life for each scale — the scale with the smallest real distance per cm shows the most detail. Working: for 1 : 500, 1 cm represents 500 cm (5 m); for 1 : 5000, 1 cm represents 50 m; for 1 : 50 000, 1 cm represents 500 m. Since 5 m is the smallest, 1 : 500 shows the most detail. Wrong options: '1 : 50 000 — covers the largest real area' wrongly assumes covering more area means more detail, when it is the opposite; '1 : 5000 — the middle value' wrongly assumes the middle scale is automatically the most balanced; '1 : 500 — covers the largest real distance' picks the correct scale but states an incorrect fact, since 1 : 500 actually covers the smallest real distance per cm.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (c) 2:3 — The white paint is 5 − 2 = 3 litres. The ratio of blue paint to white paint is 2 : 3, which has no common factor, so it is already in simplest form. Getting 2 : 5 compares the blue paint to the total amount of shade instead of to the white paint. Getting 3 : 2 has the two parts the wrong way round. Getting 5 : 3 uses the total amount of shade instead of the blue paint as the first part.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (a) 4 weeks — Apply the recurrence week by week. C_1 = 0.75 × 500 + 40 = 375 + 40 = 415. C_2 = 0.75 × 415 + 40 = 311.25 + 40 = 351.25. C_3 = 0.75 × 351.25 + 40 = 263.4375 + 40 = 303.4375. C_4 = 0.75 × 303.4375 + 40 = 227.578125 + 40 = 267.578125. C_3 = 303.4375 is still above 300, but C_4 = 267.58 has dropped below it, so the lake first becomes safe after 4 weeks. Taking 25% of the ORIGINAL 500 every week instead of 25% of the current amount, a flat 125 each time, gives 500 − 125 + 40 = 415, then 415 − 125 + 40 = 330, then 330 − 125 + 40 = 245, which crosses 300 a week too early and gives the wrong answer of 3 weeks. Continuing one extra step to C_5 = 0.75 × 267.578125 + 40 = 200.68 + 40 = 240.68 and calling it 5 weeks overshoots, since the concentration had already dropped below 300 at C_4. Forgetting the 40 units of run-off each week and only applying the decay gives C_1 = 0.75 × 500 = 375, then C_2 = 0.75 × 375 = 281.25 — this is already below 300 after only 2 weeks, because without the run-off the concentration falls much faster.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (c) £3,200 — Method: find the value of one part of the ratio from the first investor's amount, then work out the second investor's share before adding both together. Working: £1,200 is 3 parts, so one part is £1,200 ÷ 3 = £400. The second investor's share is 5 × £400 = £2,000, and the total is £1,200 + £2,000 = £3,200. So the total invested is £3,200. Distractor £2,000 is only the second investor's share, without adding the first investor's £1,200. Distractor £2,400 comes from doubling the first investor's amount instead of using the ratio. Distractor £6,000 comes from multiplying £1,200 by 5 directly instead of first finding the value of one part.
- (a) 11:00 to 12:00 — Method: the instantaneous rate of change is zero at a turning point, where a rising trend becomes a falling trend; that lies within the first interval whose difference has changed sign from the interval before it. Working: the differences between consecutive readings are +3.4 °C (09:00 to 10:00), +1.7 °C (10:00 to 11:00), −0.3 °C (11:00 to 12:00) and −2.6 °C (12:00 to 13:00); the sign changes from positive to negative within 11:00 to 12:00, since the temperature is still rising up to 11:00 (20.1 °C, the highest recorded value) and has fallen by 12:00, so the instantaneous rate of change was zero somewhere within that interval. Choosing 09:00 to 10:00 picks out the interval with the largest positive difference, +3.4 °C, confusing the fastest rise with no change at all. Choosing 10:00 to 11:00 picks the last interval where the temperature was still rising, one interval too early, without checking that the very next interval turns negative. Choosing 12:00 to 13:00 picks out the interval with the largest-magnitude difference, −2.6 °C, the fastest fall, not where the change is zero. Zero instantaneous rate of change happens at a turning point, where the readings stop rising and start falling — find the FIRST interval whose difference has flipped sign from the one before it, not the biggest change or an interval where the old sign still held.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
Build your own mix at the worksheet builder.