Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A mobile phone tariff is shown on a straight-line graph with the monthly cost, C pounds, on the vertical axis and the amount of data used, g gigabytes, on the horizontal axis. The line passes through (0, 10) and (8, 26). Work out the gradient and say what it represents.
- 2.Two scale plans of the same football pitch are drawn: Plan A has a scale of 1 : 1000 and Plan B has a scale of 1 : 200. A pitch length is 8 cm on Plan A. Work out the length of the same pitch on Plan B, in centimetres.
- 3.Water flows into a tank at a constant rate. After 8 minutes the tank holds 200 litres. Write the ratio of time in minutes to volume in litres, in its simplest form.
- 4.A metal sample has a mass of 342.6 g and a volume of 18 cm³. Work out the density of the sample, in g/cm³, to 1 decimal place.
- 5.A map has a scale of 1 : 25 000. Two towns are 5 km apart in real life. Work out the distance between the towns on the map, in centimetres.
- 6.An Ordnance Survey map has a scale of 1 : 50 000. A cycle route measures 9.4 cm on the map. Work out the real length of the route, in kilometres.
- 7.The population of a town, P thousand, is plotted against time, t years, since 2020. A tangent to the graph at t = 6 has gradient 2.5. What does this gradient represent?
- 8.A delivery driver travels 45 km in the first 30 minutes of a journey, and then a further 75 km in the next 1 hour. Work out her average speed for the whole journey, in km/h.
- 9.Before a charity campaign, donations were £6400 per month. Donations grew by 8% in the first year after the campaign, and then fell by 3% in the second year as interest faded. Work out the amount donated per month at the end of the second year, to the nearest pound.
- 10.A straight-line graph shows the cost, C pounds, of hiring a bike for h hours. The line passes through the points (1, 12) and (4, 27). Which of these statements about the line is true?
- 11.y is directly proportional to √x. When x = 25, y = 20. Construct the equation connecting x and y, then work out the value of x when y = 32.
- 12.A gym charges members a joining fee plus a fixed amount per month. The total amount paid, C pounds, is shown on a straight-line graph against the number of months, m. The line passes through the points (3, 130) and (7, 210). Work out the total amount a member will have paid after 12 months.
- 13.y is inversely proportional to x², and x is positive. When x = 2, y = 45. Construct the equation connecting x and y, then work out the value of x when y = 5.
- 14.A rectangular room is drawn on a plan with a scale of 1 : 50. On the plan, the room measures 8 cm by 6 cm. Work out the real area of the room, in square metres.
- 15.A cyclist's distance travelled, in metres, is recorded against time, in seconds. From t = 3 to t = 8 the distance increases from 12 m to 32 m. A tangent to the distance–time graph at t = 6 has gradient 3. Work out the average speed of the cyclist over the interval from t = 3 to t = 8.
Answer key
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)
- (b) 19.0 g/cm³ — Density = mass ÷ volume. 342.6 ÷ 18 = 19.0333…, which rounds to 19.0 g/cm³ (1 d.p.). 6166.8 g/cm³ comes from multiplying the mass by the volume instead of dividing (342.6 × 18). 324.6 g/cm³ comes from subtracting the volume from the mass (342.6 − 18) instead of dividing. 0.1 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (18 ÷ 342.6 = 0.0525…, rounded to 1 d.p.).
- (c) 20 cm — Convert 5 km to centimetres: 5 km = 5000 m = 500 000 cm. Divide by the scale factor: 500 000 ÷ 25 000 = 20, giving 20 cm. Converting only as far as metres, 5000 ÷ 25 000 = 0.2, gives 0.2 cm — the conversion to centimetres was never finished. Dropping a zero in the division gives 2 cm, ten times too small. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 500 000 ÷ 2500 = 200 cm, ten times too big.
- (d) 4.7 km — Multiply the map length by the scale factor: 9.4 × 50 000 = 470 000 cm. Convert to kilometres: 470 000 cm = 4700 m = 4.7 km. Converting only to metres and calling the answer 4700 kilometres mistakes metres for kilometres. Misreading the scale as 1 : 5000 instead of 1 : 50 000, 9.4 × 5000 = 47 000 cm = 0.47 km, is ten times too small. Misplacing the decimal point in 9.4 and effectively using 94, 94 × 50 000 = 4 700 000 cm = 47 km, is ten times too big.
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (d) £6705 — After the first year: £6400 × 1.08 = £6912. After the second year: £6912 × 0.97 = £6704.64, which rounds to £6705 (nearest pound). £6720 comes from treating the +8% and −3% changes as a single net +5% change applied to the original amount instead of applying each change in turn: £6400 × 1.05 = £6720. £6912 comes from applying only the first year's growth and stopping there, without applying the second year's fall. £7104 comes from adding the two percentages together as +11% and applying that to the original amount instead of applying each change to the correct starting amount in turn: £6400 × 1.11 = £7104.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
- (c) £310 — Gradient = (210 − 130) ÷ (7 − 3) = 80 ÷ 4 = 20, so the monthly rate is £20. Using C = 20m + c with the point (3, 130): 130 = 60 + c, so c = 70. After 12 months: C = 20 × 12 + 70 = 240 + 70 = £310.
- (a) 6 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 45: 2² = 4, so 45 = k ÷ 4, giving k = 45 × 4 = 180. The equation is y = 180/x². When y = 5: x² = 180 ÷ 5 = 36, so x = 6, taking the positive root because the question states that x is positive. Treating the relationship as inversely proportional to x itself gives k = 45 × 2 = 90 and then x = 90 ÷ 5 = 18, a different relationship. Multiplying by y instead of dividing by it when isolating x² gives x² = 180 × 5 = 900 and x = 30, the wrong operation. Stopping at x² = 36 without taking the square root leaves 36, not the value of x. When y = 5, x = 6.
- (a) 12 m² — Real length = 8 × 50 = 400 cm = 4 m. Real width = 6 × 50 = 300 cm = 3 m. Real area = 4 × 3 = 12 m². Scaling the plan area (8 × 6 = 48 cm²) by 50 instead of by 50 squared gives 48 × 50 = 2400 cm² = 0.24 m² — area scales by the square of the length scale factor, not the scale factor itself. Multiplying the real dimensions in centimetres, 400 × 300 = 120 000, and calling the result 120 000 m² mistakes square centimetres for square metres. Converting only the length to metres and leaving the width as 6 (treating centimetres as metres), 4 × 6 = 24, gives 24 m², from a scaling that was never finished.
- (c) 4 m/s — The average rate of change of distance with respect to time over an interval is the change in distance divided by the change in time — the gradient of the chord joining the two endpoints, not the gradient of any tangent inside the interval. From t = 3 to t = 8 the change in time is 8 − 3 = 5 and the change in distance is 32 − 12 = 20, so the average speed is 20 ÷ 5 = 4 m/s. Reporting the change in distance on its own, as 20 m/s, is not a speed: those 20 metres were covered over the whole 5 seconds, not in one second, so the 20 still has to be divided by the 5. The tangent's gradient of 3 m/s is the instantaneous speed at the single moment t = 6, not the average over the whole 5-second interval, so it must not be used here. Adding the change in distance and the change in time instead of dividing gives 20 + 5 = 25, which is not a speed. The average speed of the cyclist over the interval is 4 m/s.
Build your own mix at the worksheet builder.