Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A dog walker's charge, C pounds, for walking a dog for m minutes is shown on a straight-line graph. The line passes through the points (20, 14) and (50, 26). Work out the charge for a 65-minute walk.
- 2.A conversion graph between kilometres and miles passes through the origin and the point (50, 31), with the number of kilometres on the horizontal axis and the number of miles on the vertical axis. Work out the number of miles equivalent to 1 kilometre.
- 3.A metal sample has a mass of 342.6 g and a volume of 18 cm³. Work out the density of the sample, in g/cm³, to 1 decimal place.
- 4.A 1.5 kg bag of pasta costs £2.85 and a 2.4 kg bag of the same pasta costs £4.32. Work out which bag gives better value for money.
- 5.A sequence is defined by the iterative rule x_{n+1} = 0.5x_n + 20, with x_0 = 0. By working out x_1, x_2 and x_3, find the value that the sequence is approaching.
- 6.The population of a town, P thousand, is plotted against time, t years, since 2020. A tangent to the graph at t = 6 has gradient 2.5. What does this gradient represent?
- 7.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
- 8.A cyclist rides 30 km in 1 hour 30 minutes. Work out the average speed of the cyclist in km/h.
- 9.A garden centre has 90 rose bushes in stock. It receives a delivery that increases its stock of rose bushes by 20%. In the same week it sells 150 lavender bushes. Work out the new number of rose bushes, then write it as a fraction of the number of lavender bushes sold, giving your answer in its simplest form.
- 10.Paint costs £14.40 for every 20 m² of wall it covers. Assuming the same rate, work out the cost of the paint needed to cover 56 m² of wall.
- 11.A delivery driver travels 45 km in the first 30 minutes of a journey, and then a further 75 km in the next 1 hour. Work out her average speed for the whole journey, in km/h.
- 12.There are 2500 electric cars registered in a town. The number is predicted to increase by 6% each year. Work out the predicted number of electric cars after 3 years, to the nearest whole number.
- 13.A pump fills a paddling pool at a rate of 130 litres per hour. Work out the rate in litres per minute, to 2 decimal places.
- 14.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
- 15.Two mathematically similar garden ponds have surface areas of 12 m² and 27 m². The fencing needed to go around the smaller pond costs £96. Assuming the cost of fencing is proportional to the perimeter of the pond, work out the cost of fencing the larger pond.
Answer key
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (b) 19.0 g/cm³ — Density = mass ÷ volume. 342.6 ÷ 18 = 19.0333…, which rounds to 19.0 g/cm³ (1 d.p.). 6166.8 g/cm³ comes from multiplying the mass by the volume instead of dividing (342.6 × 18). 324.6 g/cm³ comes from subtracting the volume from the mass (342.6 − 18) instead of dividing. 0.1 g/cm³ comes from dividing the volume by the mass instead of the mass by the volume (18 ÷ 342.6 = 0.0525…, rounded to 1 d.p.).
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (c) 40 — Working out successive terms shows where the sequence is heading, but the terms themselves keep changing — the limit is the value where the sequence stops changing, so x_{n+1} = x_n = L there. Substituting into the rule: L = 0.5L + 20. Subtracting 0.5L from both sides: L − 0.5L = 20, so 0.5L = 20, and L = 20 ÷ 0.5 = 40. The individual terms are x_1 = 0.5 × 0 + 20 = 20, x_2 = 0.5 × 20 + 20 = 30 and x_3 = 0.5 × 30 + 20 = 35, getting closer to this value but not equal to it — 35 is only the third term, not the limit. Multiplying by 0.5 instead of dividing at the final step, 20 × 0.5 = 10, undoes the rearrangement rather than completing it, and gives a value smaller than terms the sequence has already passed. Writing the fixed-point equation with the wrong sign, L = 0.5L − 20, gives 0.5L = −20 and L = −40, which cannot be right since every term in the sequence is positive and increasing. The value the sequence is approaching is 40.
- (d) The population is growing at 2500 people per year. — The gradient of a tangent to a graph gives the instantaneous rate of change of the quantity on the vertical axis with respect to the quantity on the horizontal axis, at that exact point — not the total change and not an average. Here the vertical axis is population in thousands and the horizontal axis is time in years, so the gradient is measured in thousands of people per year. A gradient of 2.5 means the population is growing at an instantaneous rate of 2.5 thousand people per year, and since P is measured in thousands, 2.5 × 1000 = 2500 people per year. This describes the rate of change at that instant, not the total increase over the 6 years and not an average population.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (a) £40.32 — Find the cost per square metre from the rate given: £14.40 ÷ 20 = £0.72 per m². Then multiply by the area to be covered: £0.72 × 56 = £40.32. Working out 14.40 × 20 ÷ 56 ≈ £5.14 uses the ratio the wrong way round, scaling down as if 56 m² needed less paint than 20 m². Stopping at £0.72 only gives the cost per square metre, not the cost for the whole wall. Working out 14.40 + (56 − 20) = £50.40 adds the extra square metres straight onto the cost in pounds, treating square metres and pounds as the same kind of quantity. Covering 56 m² costs £40.32.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (a) 2978 — A rise of 6% is a multiplier of 1.06, applied once for each year. After year 1: 2500 × 1.06 = 2650. After year 2: 2650 × 1.06 = 2809. After year 3: 2809 × 1.06 = 2977.54, which is 2978 to the nearest whole number. Multiplying by 1.18 in one go would be wrong, because the second and third years grow from larger numbers than the first.
- (a) 2.17 litres per minute — There are 60 minutes in an hour, so to convert litres per hour to litres per minute you divide by 60: 130 ÷ 60 = 2.1666..., which rounds to 2.17 litres per minute. Multiplying by 60 instead of dividing gives 130 × 60 = 7800.00 litres per minute, using the conversion factor the wrong way round. Leaving the rate unchanged, 130.00, ignores that 'per hour' and 'per minute' are different units. Dividing by 50 instead of 60, misremembering the number of minutes in an hour, gives 130 ÷ 50 = 2.60 litres per minute.
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (d) £144 — Method: find the length (perimeter) scale factor by taking the square root of the area ratio, then apply it to the cost. Working: 12 : 27 simplifies to 4 : 9, and the square root of each part gives the length ratio 2 : 3, so the scale factor from the smaller to the larger pond is 3 ÷ 2 = 1.5. Cost = £96 × 1.5 = £144. Answer: £144. £216 comes from using the area ratio itself as the cost ratio, £96 × (27 ÷ 12) = £216, without taking the square root. £64 comes from using the length ratio the wrong way round, £96 × (2 ÷ 3) = £64. £111 comes from simply adding the difference in area, 27 − 12 = 15, onto the original cost, £96 + £15 = £111, instead of scaling proportionally.
Build your own mix at the worksheet builder.