Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Two mathematically similar triangular flags have areas in the ratio 4 : 25. The height of the smaller flag is 6 cm. Work out the height of the larger flag.
- 2.A mobile phone tariff is shown on a straight-line graph with the monthly cost, C pounds, on the vertical axis and the amount of data used, g gigabytes, on the horizontal axis. The line passes through (0, 10) and (8, 26). Work out the gradient and say what it represents.
- 3.Last week Priya worked 5 shifts of 7 hours. This week she worked 4 shifts of 8 hours. Write the number of hours she worked last week as a fraction of the number of hours she worked this week.
- 4.A car is bought for £12000. Its value falls by 15% in the first year and by 10% in each year after that. Work out the value of the car 3 years after it was bought.
- 5.A charity fun run raises money through entry fees and donations. Entry fees raise £1,260, which is 60% of the total amount raised. Work out how much money was raised through donations.
- 6.A tangent to the graph of population against time at the point where t = 4 passes through (2, 180) and (6, 260). Work out the instantaneous rate of change of the population at t = 4, in people per year.
- 7.A printer's ink cartridge level, I millilitres, is plotted against the number of pages printed, p, and the points lie on a straight line. The line passes through (0, 24) and (300, 9). The printer has now printed 300 pages. Work out how many more pages it can print before the cartridge is empty.
- 8.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 9.The volume of fuel remaining in a storage tank, in thousands of litres, is plotted against time, in hours, since a leak was detected. A tangent to the graph at t = 2 hours has gradient −8.75 thousand litres per hour. A tangent at t = 8 hours has gradient −3.5 thousand litres per hour. Work out by what factor the instantaneous rate of change is greater in size at t = 2 hours than at t = 8 hours.
- 10.y is directly proportional to x. When x = 5, y = 18. Work out the value of y when x = 15.
- 11.Leah puts £4000 into a savings account paying 3% compound interest each year. At the end of 2 years she takes out all of the money and spends £1500 of it on a laptop. Work out how much of the money she has left.
- 12.The value of a delivery van, in £, is plotted against its age, in years, since it was bought. At age 2 years, the gradient of the tangent to the graph is −950. What does this tell you about the van at age 2 years?
- 13.Two printers' running costs are shown on separate straight-line graphs of total cost against number of pages printed. Printer A's graph has gradient £0.04 per page. Printer B's graph has gradient £0.05 per page. Work out how much cheaper it is to print 200 pages on Printer A than on Printer B, based on these running costs alone.
- 14.A lorry is carrying a load of mass m tonnes. Given that 1 tonne = 1000 kg, write down an expression for the mass of the load in kilograms.
- 15.The number of tickets a group can afford is inversely proportional to the price per ticket. At £4 per ticket, the group can afford 12 tickets. Work out how many tickets the group can afford at £6 per ticket.
Answer key
- (a) 15 cm — Take the square root of each part of the area ratio to find the length ratio: the square root of 4 is 2 and the square root of 25 is 5, giving a length ratio of 2 : 5. Multiply the smaller flag's height by the scale factor 5 ÷ 2 = 2.5: 6 × 2.5 = 15, so the larger flag is 15 cm tall. Giving 37.5 cm uses the area ratio, 25 ÷ 4 = 6.25, directly as the scale factor without square-rooting it first (6 × 6.25 = 37.5). Giving 2.4 cm applies the length ratio the wrong way round, scaling the smaller flag down by 2 ÷ 5 instead of up by 5 ÷ 2 (6 × 0.4 = 2.4). Giving 27 cm adds the difference between the two area-ratio numbers, 25 − 4 = 21, onto the smaller height instead of using it as a scale factor (6 + 21 = 27).
- (b) 2, the cost in pounds of each extra gigabyte — Method: the gradient is the change in cost divided by the change in data, so it is the cost of each extra gigabyte; the value where the line meets the vertical axis is the charge before any data is used, which is a different quantity. Working: from (0, 10) to (8, 26) the cost rises by 26 − 10 = 16 pounds while the data rises by 8 − 0 = 8 gigabytes, so the gradient is 16 ÷ 8 = 2, meaning each extra gigabyte costs £2. Answer: 2, the cost in pounds of each extra gigabyte. The distractors: '10, the cost in pounds of each extra gigabyte' reads the intercept as the gradient, but 10 is what the tariff costs when no data at all has been used; '3.25, the cost in pounds of each extra gigabyte' comes from 26 ÷ 8, treating the line as though it passed through the origin when it starts at 10; '2, the fixed monthly charge in pounds' has the gradient right but describes the intercept, and the fixed charge on this tariff is £10.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (d) £8262 — A fall of 15% is a multiplier of 0.85 and a fall of 10% is a multiplier of 0.9, and each multiplier acts on the value at the start of its own year. After year 1: 12000 × 0.85 = 10200. After year 2: 10200 × 0.9 = 9180. After year 3: 9180 × 0.9 = 8262. The value 3 years after the car was bought is £8262. Adding the percentages to make a single fall of 35% would be wrong, because the later falls are taken from smaller values.
- (c) £840 — Method: find the total amount raised using the reverse percentage, then subtract the entry fees to find the donations. Working: £1,260 is 60% of the total, so the total is £1,260 ÷ 0.6, and subtracting the entry fees from this total leaves £840 raised through donations. Answer: £840. £2,100 comes from correctly finding the total amount raised but then forgetting to subtract the entry fees, giving the total instead of the donations alone. £504 comes from working out 40% of the entry fees themselves, £1,260 × 0.4 = £504, instead of first finding the total amount raised. £1,890 comes from treating £1,260 as 40% of the total instead of 60%, dividing by 0.4 to get a total of £3,150, and then subtracting the entry fees from that incorrect total.
- (a) 20 people/year — The gradient of a tangent to a graph at a point equals the instantaneous rate of change of the quantity there. A straight line's gradient is the change in the vertical value divided by the change in the horizontal value between two points on it. Here the tangent passes through (2, 180) and (6, 260), so the change in population is 260 − 180 = 80 and the change in time is 6 − 2 = 4. The gradient is 80 ÷ 4 = 20. Reporting the change in population, 80, on its own is not a rate, because that growth happened over 4 years and has not been divided by them. Adding the two changes instead of dividing gives 80 + 4 = 84, which is not a rate. Subtracting the coordinates in the wrong order, (180 − 260) ÷ (6 − 2), gives −80 ÷ 4 = −20, the wrong sign. The instantaneous rate of change of the population at t = 4 is 20 people per year.
- (c) 180 pages — The gradient is (9 − 24) ÷ (300 − 0) = −15 ÷ 300 = −0.05, so the cartridge uses 0.05 ml of ink per page. At p = 300 there are 9 ml left. The extra pages before the cartridge is empty is 9 ÷ 0.05 = 180 pages. Giving 9 as the answer confuses the millilitres of ink remaining with the number of pages remaining — they are different quantities with different units. Multiplying instead of dividing, 9 × 0.05 = 0.45, does not undo the rate correctly. Working out the total number of pages a full cartridge lasts, 24 ÷ 0.05 = 480 pages, answers how many pages the cartridge prints in total from full, not how many more pages it can print from the 300-page point.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (a) 2.5 — Method: the factor by which the SIZE of one rate is greater than the size of another is found by dividing the larger magnitude by the smaller magnitude, ignoring their signs, so here the two magnitudes to work with are 8.75 and 3.5. Working: 8.75 ÷ 3.5 = 2.5, so the size of the instantaneous rate of change at t = 2 hours was 2.5 times the size of the instantaneous rate of change at t = 8 hours. Subtracting the two magnitudes, 8.75 − 3.5 = 5.25, gives how many thousand litres per hour greater one rate is than the other, not how many times greater — that is a difference, not a factor. Dividing the magnitudes the wrong way round, 3.5 ÷ 8.75 = 0.4, gives the factor by which the rate at t = 8 hours is smaller than at t = 2 hours, the reciprocal of what was asked for. Adding the magnitudes, 8.75 + 3.5 = 12.25, combines the two rates instead of comparing them, and does not answer a 'by what factor' question at all. A question that asks 'by what factor' is always answered by a division, in the order the question states it — check which rate is on top before you divide.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (c) £2743.60 — Each year the balance is multiplied by 1.03. After the first year: 4000 × 1.03 = 4120. After the second year: 4120 × 1.03 = 4243.60, so that is what Leah takes out. She then spends £1500 of it, which leaves 4243.60 − 1500 = 2743.60. She has £2743.60 left.
- (c) Falling at £950 per year — The gradient of a tangent on a value-age graph is a rate, in pounds per year, so −950 means the van's value is falling at £950 per year at that instant. Writing this as 950% per year mistakes a rate measured in pounds per year for a percentage — the units of a gradient come from the units on the two axes, £ and years, not from a percentage. Saying the value 'falls by £950 over the next year' treats the instantaneous rate at age 2 as if it stayed constant for a whole year, which finds an average future change, not the instantaneous rate at age 2 itself. Reading the sign the wrong way round gives 'rising at £950 per year', which would mean the van is gaining value. Always match the units of a gradient to the units on the two axes of the graph.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
- (a) 1000m — Method: kilograms are a smaller unit than tonnes, so change tonnes into kilograms by multiplying by 1000. Working: m tonnes = m × 1000 kg = 1000m kg. So the expression is 1000m. Distractor m/1000 comes from dividing by 1000 instead of multiplying, which would make the number of kilograms smaller than the number of tonnes, the wrong way round. Distractor 1000 + m comes from adding the conversion factor instead of multiplying by it. Distractor m − 1000 comes from subtracting the conversion factor instead of multiplying by it.
- (d) 8 — The product of price and number of tickets is constant: k = 4 × 12 = 48. At £6 per ticket, the number of tickets is 48 ÷ 6 = 8. Getting 18 comes from treating price and tickets as directly proportional and working out 12 × 6 ÷ 4 instead of dividing k by the new price. Getting 12 assumes the number of tickets does not change when the price changes. Getting 6 comes from writing down the new price instead of working out the number of tickets.
Build your own mix at the worksheet builder.