- 1.The volume of fuel remaining in a storage tank, in thousands of litres, is plotted against time, in hours, since a leak was detected. A tangent to the graph at t = 2 hours has gradient −8.75 thousand litres per hour. A tangent at t = 8 hours has gradient −3.5 thousand litres per hour. Work out by what factor the instantaneous rate of change is greater in size at t = 2 hours than at t = 8 hours.
- 2.A laptop costs £800 when new. Its value decreases by 25% of its value at the start of each year. Work out how much value the laptop loses in the second year.
- 3.Two mathematically similar triangular flags have areas in the ratio 4 : 25. The height of the smaller flag is 6 cm. Work out the height of the larger flag.
- 4.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 5.Ffion is paid £11.20 per hour. She works 6 hours on Monday and 4.5 hours on Tuesday. Work out her total pay for the two days.
- 6.A shop sells identical pens. The total cost, C pence, of n pens is given by C = 12n. Write the ratio n : C in its simplest form.
- 7.A statue exerts a downward force of 68.4 N on its base, which has an area of 2.85 m². Work out the pressure that the statue exerts on its base, in N/m².
- 8.y is directly proportional to √x. When x = 25, y = 20. Construct the equation connecting x and y, then work out the value of x when y = 32.
- 9.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 10.A shop's takings were £4500 in May. In June the takings fell by £900. Write the June takings as a fraction of the May takings, in its simplest form.
- 11.A map has a scale of 1 : 20 000. A different map of the same area has a scale of 1 : 80 000. A lake's shoreline is drawn 5 cm long on the first map. Work out the length of the same shoreline on the second map, in centimetres.
- 12.A population of fish in a lake is modelled by the recurrence P_{n+1} = 1.1P_n − 30, where P_n is the population after n years, 30 fish are removed by fishing each year, and P_0 = 400. After how many complete years does the population first exceed 460?
- 13.A plumber charges a call-out fee plus an hourly rate. The total charge, C pounds, for a job lasting h hours is shown on a straight-line graph. The line passes through the points (2, 70) and (5, 130). Work out the call-out fee, in pounds.
- 14.A car is bought for £17,500. Its value decreases by 12% in the first year, and by a further 10% of its reduced value in the second year. Work out the value of the car at the end of the second year, giving your answer to the nearest pound.
- 15.On a straight-line graph the volume of water, V litres, in a tank is plotted on the vertical axis and the time, t minutes, on the horizontal axis. The line passes through (2, 50) and (6, 130). Work out the gradient of the line and give its units.
Answer key
- (a) 2.5 — Method: the factor by which the SIZE of one rate is greater than the size of another is found by dividing the larger magnitude by the smaller magnitude, ignoring their signs, so here the two magnitudes to work with are 8.75 and 3.5. Working: 8.75 ÷ 3.5 = 2.5, so the size of the instantaneous rate of change at t = 2 hours was 2.5 times the size of the instantaneous rate of change at t = 8 hours. Subtracting the two magnitudes, 8.75 − 3.5 = 5.25, gives how many thousand litres per hour greater one rate is than the other, not how many times greater — that is a difference, not a factor. Dividing the magnitudes the wrong way round, 3.5 ÷ 8.75 = 0.4, gives the factor by which the rate at t = 8 hours is smaller than at t = 2 hours, the reciprocal of what was asked for. Adding the magnitudes, 8.75 + 3.5 = 12.25, combines the two rates instead of comparing them, and does not answer a 'by what factor' question at all. A question that asks 'by what factor' is always answered by a division, in the order the question states it — check which rate is on top before you divide.
- (a) £150 — Value after year 1: £800 × 0.75 = £600. Value after year 2: £600 × 0.75 = £450. The loss during the second year alone is £600 − £450 = £150. £450 comes from giving the value remaining after 2 years, not the amount lost during the second year. £200 comes from working out the loss during the first year instead of the second: £800 − £600 = £200. £350 comes from working out the total loss over both years instead of just the second year's loss: £800 − £450 = £350.
- (a) 15 cm — Take the square root of each part of the area ratio to find the length ratio: the square root of 4 is 2 and the square root of 25 is 5, giving a length ratio of 2 : 5. Multiply the smaller flag's height by the scale factor 5 ÷ 2 = 2.5: 6 × 2.5 = 15, so the larger flag is 15 cm tall. Giving 37.5 cm uses the area ratio, 25 ÷ 4 = 6.25, directly as the scale factor without square-rooting it first (6 × 6.25 = 37.5). Giving 2.4 cm applies the length ratio the wrong way round, scaling the smaller flag down by 2 ÷ 5 instead of up by 5 ÷ 2 (6 × 0.4 = 2.4). Giving 27 cm adds the difference between the two area-ratio numbers, 25 − 4 = 21, onto the smaller height instead of using it as a scale factor (6 + 21 = 27).
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (b) 1:12 — C = 12n means that for every 1 pen there are 12 pence of cost, so n : C = 1 : 12, and the highest common factor of 1 and 12 is 1, so this is already in its simplest form. Writing C : n instead of n : C gives 12 : 1, the ratio the wrong way round. Reading C = 12n as '12 more than n' instead of '12 times n', so n = 1 gives C = 13, gives 1 : 13, from adding instead of multiplying. Choosing n = 12, so C = 12 × 12 = 144, gives the correct pair of values n : C = 12 : 144, but the ratio the right way round left unsimplified — 12 and 144 share a common factor of 12, which has not been cancelled.
- (a) 24 N/m² — Pressure = force ÷ area. 68.4 ÷ 2.85 = 24 N/m². 194.94 N/m² comes from multiplying the force by the area instead of dividing (68.4 × 2.85). 65.55 N/m² comes from subtracting the area from the force (68.4 − 2.85) instead of dividing. 0.04 N/m² comes from dividing the area by the force instead of the force by the area (2.85 ÷ 68.4).
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (a) 4/5 — Method: find the June takings first, then write them over the May takings and cancel. Working: the takings fell by £900, so June is £4500 − £900 = £3600; the fraction is 3600/4500, and dividing the numerator and the denominator by 900 gives 4/5. Answer: 4/5 of the May takings. The distractors: 1/5 comes from writing the fall over the May takings, 900/4500, which answers how far the takings dropped rather than what June's takings are compared with May's; 5/4 comes from writing May over June, 4500/3600, reversing the order the question asks for; 4/9 comes from writing June over the two months added together, 3600/8100, a part-to-whole fraction when the comparison asked for is with May alone.
- (c) 1.25 cm — Method: find the real length using the first map's scale, then use the second map's scale to find its drawn length. Working: real length = 5 × 20 000 = 100 000 cm. On the second map: 100 000 ÷ 80 000 = 1.25 cm. Wrong options: 20 cm comes from inverting the ratio of the two scales (5 × 80 000 ÷ 20 000); 5 cm comes from wrongly assuming the length looks the same on both maps; 12.5 cm comes from dropping a zero from the second scale factor and dividing by 8 000 instead of 80 000 (100 000 ÷ 8 000).
- (b) 5 years — The recurrence P_{n+1} = 1.1P_n − 30 must be applied once per year, checking after each application whether the population has passed 460. Starting from P_0 = 400: 400 × 1.1 − 30 = 410, so P_1 = 410. Then 410 × 1.1 − 30 = 421, so P_2 = 421. Then 421 × 1.1 − 30 = 433.1, so P_3 = 433.1. Then 433.1 × 1.1 − 30 = 446.41, so P_4 = 446.41, which is still below 460. Then 446.41 × 1.1 − 30 = 461.051, so P_5 = 461.051, the first value above 460. The population first exceeds 460 after 5 complete years. Stopping at P_4 = 446.41 and reporting 4 years reports the last year the population was still below 460, not the first year it was above. Counting the starting value P_0 = 400 as a year of growth makes P_5 the sixth number in the list and gives 6 years, but P_0 is the population before any year has passed, so P_5 is reached after 5 years, not 6. Reading "exceed 460" as "exceed the starting population of 400" instead gives P_1 = 410, already above 400, and 1 year — but the threshold named in the question is 460, not the starting value, so always check every value against the number actually stated in the question.
- (d) £30.00 — The gradient is (130 − 70) ÷ (5 − 2) = 60 ÷ 3 = £20 per hour. Using the point (2, 70): the cost for 2 hours at £20 per hour is 20 × 2 = £40, so the call-out fee is 70 − 40 = £30. Taking the C-value of the first point as the fee without subtracting the hourly cost gives £70.00 — but that point already includes 2 hours of the hourly rate. Using the gradient itself as the fee, £20.00, confuses the rate per hour with the fixed charge. Subtracting 20 × 3 = 60 instead of 20 × 2 = 40 (using the wrong h-value) gives 70 − 60 = £10.00.
- (b) £13,860 — Method: apply the first year's percentage decrease, then apply the second year's percentage decrease to the new value. Working: after the first year, the car is worth £17,500 × 0.88. Multiplying this result by 0.90 gives the value at the end of the second year, £13,860. Answer: £13,860. £13,650 comes from adding the two percentages together (12% + 10% = 22%) and applying a single 22% decrease, £17,500 × 0.78 = £13,650, instead of applying the decreases one after the other. £15,750 comes from applying only the second year's 10% decrease to the original price, forgetting the first year's decrease entirely, £17,500 × 0.90 = £15,750. £15,400 comes from applying only the first year's 12% decrease and stopping there, forgetting to apply the second year's decrease at all.
- (a) 20 litres per minute — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, and its units are the vertical unit for each one of the horizontal unit. Working: from (2, 50) to (6, 130) the volume changes by 130 − 50 = 80 litres and the time changes by 6 − 2 = 4 minutes, so the gradient is 80 ÷ 4 = 20, measured in litres for each minute. Answer: 20 litres per minute. The distractors: 25 litres per minute comes from using one point on its own, 50 ÷ 2, which assumes the line starts at the origin when the tank already held 50 litres at 2 minutes; 0.05 litres per minute comes from dividing the change in time by the change in volume, 4 ÷ 80, which gives the time for each litre but is then labelled as litres for each minute; 20 minutes for each litre has the right value with the units the wrong way round, and a tank that needed 20 minutes to gain a single litre would be filling far more slowly than this one.