- 1.A scale drawing of a car park has a scale of 1 : 300. On the drawing, the car park has an area of 15 cm². Work out the real area of the car park, in square metres.
- 2.Two taxi firms show their charges on straight-line graphs, with the cost in pounds on the vertical axis and the distance in miles on the horizontal axis. Firm A's line passes through (0, 4) and (5, 14). Firm B's line passes through (0, 6) and (5, 21). Work out which firm charges more per mile.
- 3.The exchange rate is £1 = €1.15. Convert £200 to euros.
- 4.The temperature of a chemical reaction, in °C, is modelled by T = 80 − 6t + 0.5t², where t is the time in minutes after the reaction starts. Which of these four statements about the reaction between t = 2 and t = 6 minutes is correct?
- 5.A lorry is carrying a load of mass m tonnes. Given that 1 tonne = 1000 kg, write down an expression for the mass of the load in kilograms.
- 6.A scale drawing of a park has a scale of 1 : 2500. On the drawing, the distance between the entrance and the lake is 4.4 cm. A jogger runs from the entrance to the lake and then back to the entrance. Work out the total distance the jogger runs, in kilometres.
- 7.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 8.y is directly proportional to x. When x = 4, y = 10. Work out the value of y when x = 6.
- 9.A garden centre sells two mathematically similar sacks of grass seed. The amount of lawn a sack can treat is proportional to the volume of seed inside it. The smaller sack is 20 cm tall and treats a lawn of area 30 m². The larger sack is 40 cm tall. A gardener needs to treat a lawn with an area of 500 m² using only the larger sacks. Work out the minimum number of larger sacks needed.
- 10.A sequence is defined by the iterative rule x_{n+1} = 0.8x_n + 50, with x_0 = 200. Work out x_2, the value of the sequence after two iterations.
- 11.A 1.5 kg bag of pasta costs £2.85 and a 2.4 kg bag of the same pasta costs £4.32. Work out which bag gives better value for money.
- 12.The density of a type of solid plastic is 0.9 g/cm³. Work out the mass of 0.5 m³ of the plastic, in kilograms.
- 13.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 14.Two cars travel at constant speeds. Car A travels 150 km in 3 hours. Car B travels 180 km in 4 hours. Which car is faster, and what is its speed?
- 15.The cost, in pounds, of hiring a minibus is modelled against the number of passengers booked. A tangent to the cost graph at 20 passengers passes through the points (16, 184) and (24, 216). Work out the instantaneous rate at which the cost increases with each extra passenger, at 20 passengers.
Answer key
- (d) 135 m² — Method: for area, the scale factor must be squared. Working: area scale = 300² = 90 000. 15 × 90 000 = 1,350,000 cm². Convert to m² by dividing by 10 000: 1,350,000 ÷ 10 000 = 135 m². Wrong options: 0.45 m² comes from using the linear scale factor (×300) instead of squaring it; 1,350,000 m² comes from forgetting to convert the answer from cm² to m²; 13,500 m² comes from dividing by 100 instead of 10 000 when converting units.
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (b) €230.00 — Multiply the amount in pounds by the exchange rate: 200 × 1.15 = 230, so £200 = €230.00. Working out 200 + 1.15 = 201.15 treats the exchange rate as an amount to add rather than a multiplier. Working out 200 × 0.15 = 30 finds only the extra amount earned for every pound and forgets to add it back to the original £200. Working out 200 × 11.5 = 2300.00 misplaces the decimal point in the exchange rate, multiplying by 11.5 instead of 1.15. £200 converts to €230.00.
- (c) Average rate, t = 2 to 6, is −2°C/min — First find the temperature at each end of the interval. At t = 2, T = 80 − 6 × 2 + 0.5 × 2² = 80 − 12 + 2 = 70. At t = 6, T = 80 − 6 × 6 + 0.5 × 6² = 80 − 36 + 18 = 62. The average rate of change over the interval is the change in T divided by the change in t: 62 − 70 = −8, then −8 ÷ 4 = −2°C per minute, so the statement about the average rate is correct. The instantaneous rate at t = 6 is not −2: completing the square gives T = 0.5(t − 6)² + 62, so t = 6 is the turning point of the curve, where the tangent is horizontal and the rate is 0°C per minute — the reaction has stopped cooling by then. The instantaneous rate at t = 2 is not −2 either: a short chord centred on t = 2, from t = 1.9 (T = 70.405) to t = 2.1 (T = 69.605), gives −0.8 ÷ 0.2 = −4°C per minute, so the reaction is cooling twice as fast at the start of the interval as the average over it. Saying the temperature falls 2°C in total confuses the RATE, −2°C per minute, with a TOTAL drop, which is 70 − 62 = 8°C over the four minutes. Always check whether a figure is a rate, per minute, or a total change.
- (a) 1000m — Method: kilograms are a smaller unit than tonnes, so change tonnes into kilograms by multiplying by 1000. Working: m tonnes = m × 1000 kg = 1000m kg. So the expression is 1000m. Distractor m/1000 comes from dividing by 1000 instead of multiplying, which would make the number of kilograms smaller than the number of tonnes, the wrong way round. Distractor 1000 + m comes from adding the conversion factor instead of multiplying by it. Distractor m − 1000 comes from subtracting the conversion factor instead of multiplying by it.
- (b) 0.22 km — The real one-way distance is 4.4 × 2500 = 11000 cm. Converting units: 11000 ÷ 100 = 110 m, and 110 ÷ 1000 = 0.11 km. Since the jogger runs there and back, the total distance is 0.11 × 2 = 0.22 km. 0.11 km comes from working out only the one-way distance and forgetting the return journey. 220 km comes from correctly doubling the one-way distance in metres, 110 × 2 = 220, but leaving it mislabelled as kilometres instead of converting metres to kilometres. 110 km comes from working out only the one-way distance in metres, 110, and mislabelling it as kilometres.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (c) 3 — Method: find the height scale factor, cube it to find the volume (and coverage) scale factor, use it to find one large sack's coverage, then divide the total lawn area by this and round up to a whole number of sacks. Working: height scale factor = 40 ÷ 20 = 2, so coverage scale factor = 2³ = 8, and each large sack covers 30 × 8 = 240 m². 500 ÷ 240 = 2.08…, which rounds UP to 3 whole sacks. Answer: 3. 2 comes from correctly finding that each large sack covers 240 m², but then rounding 500 ÷ 240 down instead of up, which would leave part of the lawn untreated. 5 comes from squaring the height scale factor (2² = 4) instead of cubing it, giving a coverage of only 30 × 4 = 120 m² per sack. 17 comes from forgetting to scale the coverage at all and dividing 500 by the smaller sack's coverage of 30 m².
- (d) 218 — The rule x_{n+1} = 0.8x_n + 50 must be applied once for each step, using the result of the previous step every time — not the same starting value repeated. Starting from x_0 = 200: 0.8 × 200 = 160, so x_1 = 160 + 50 = 210. Then 0.8 × 210 = 168, so x_2 = 168 + 50 = 218. Stopping after one iteration leaves x_1 = 210, not x_2. Applying only the multiplier twice without adding 50 at each step uses 0.8² = 0.64, and 0.64 × 200 = 128, which drops the 50 completely. Adding 50 twice at the end instead of once per step, 128 + 100 = 228, still does not reproduce the actual recurrence, because the 50 added at the first step is itself multiplied by 0.8 at the second step. After two iterations, x_2 = 218.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (d) £4 — The gradient of the tangent gives the instantaneous rate of change of cost with respect to the number of passengers, in pounds per passenger. The tangent passes through (16, 184) and (24, 216), so the change in cost is 216 − 184 = 32 and the change in passengers is 24 − 16 = 8. The gradient is 32 ÷ 8 = 4. Stopping after finding the change in cost, without dividing by the change in passengers, leaves 32, not a rate. Adding the two changes instead of dividing gives 32 + 8 = 40, which is not a rate either. Reading off only the change in passengers, 8, is not a rate at all — a rate needs the change in cost as well. The instantaneous rate is £4 per extra passenger.
Build your own mix at the worksheet builder.