Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A cyclist rides 19.3 km in 47 minutes. Work out her average speed, in km/h, to 1 decimal place.
- 2.A vehicle is worth £18000. Its value decreases by 15% each year. Using the recurrence V_{n+1} = 0.85V_n, with V_0 = 18000, find the first whole number of years after which the vehicle's value drops below £10000.
- 3.A model railway is built at a scale where the ratio of model length to real length is 1 : 76. Given that a real carriage is 20.6 metres long, work out the length of the model carriage in centimetres, to 1 decimal place.
- 4.Two mathematically similar logos are printed on a poster. They have areas 20 cm² and 45 cm². Nadia says that the length scale factor from the smaller logo to the larger logo is 45 ÷ 20 = 2.25. Give a reason why Nadia is incorrect, and work out the correct length scale factor.
- 5.A straight line passes through the points (1, 20) and (5, 8). Work out the gradient of the line.
- 6.A tap fills a tank at a rate of 15 litres per minute. Given that 1 litre = 1000 cm³, work out the rate at which the tank fills in cm³ per second.
- 7.y is directly proportional to √x. When x = 25, y = 20. Construct the equation connecting x and y, then work out the value of x when y = 32.
- 8.A crate exerts a force of 84 N on the floor through a base with an area of 2.4 m². Work out the pressure on the floor, in N/m².
- 9.Map A has a scale of 1 : 25000 and Map B has a scale of 1 : 50000, both showing the same area. A real distance of 10 km is measured on each map. On which map does this distance appear as the longer length, and how long is it on that map, in centimetres?
- 10.Last week Priya worked 5 shifts of 7 hours. This week she worked 4 shifts of 8 hours. Write the number of hours she worked last week as a fraction of the number of hours she worked this week.
- 11.In a choir of 30 singers, 40% are altos and the rest are sopranos. Write the number of sopranos as a fraction of the number of altos. Give your answer in its simplest form.
- 12.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
- 13.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 14.Two mathematically similar cylinders have heights in the ratio 3 : 4. Write the ratio of their volumes in its simplest form.
- 15.The height of water in a tank, h metres, t minutes after a tap is opened is modelled by h = 0.02t² + 0.5. Estimate the instantaneous rate of change of the height at t = 10, using the gradient of the chord joining t = 9 and t = 11.
Answer key
- (d) 24.6 km/h — Average speed = distance ÷ time, with time in hours. 47 minutes = 47 ÷ 60 hours. 19.3 ÷ (47 ÷ 60) = 19.3 ÷ 47 × 60 = 24.638…, which rounds to 24.6 km/h (1 d.p.). 0.4 km/h comes from dividing the distance by 47 and treating the result as km/h directly, without converting the minutes to hours at all. 41.1 km/h comes from converting minutes to hours by dividing by 100 instead of 60 (19.3 ÷ 47 × 100). 0.3 km/h comes from dividing the distance by 60 instead of converting the 47 minutes to hours first.
- (d) 4 years — Apply the recurrence repeatedly. V_1 = 0.85 × 18000 = 15300. V_2 = 0.85 × 15300 = 13005. V_3 = 0.85 × 13005 = 11054.25. V_4 = 0.85 × 11054.25 = 9396.1125. V_3 = £11054.25 is still above £10000, but V_4 = £9396.11 has dropped below it, so the answer is 4 years. Stopping at V_3 and calling it '3 years' misreads £11054.25 as already below £10000, or comes from wrongly modelling the fall as a flat £2700 a year (15% of the original value each time, without compounding), which crosses £10000 a year too early. Continuing one extra step to V_5 = 0.85 × 9396.1125 = 7986.70 and calling it '5 years' overshoots, since the value had already dropped below £10000 at V_4. Doubling the percentage decrease to 30% by mistake gives V_1 = 0.7 × 18000 = 12600, then V_2 = 0.7 × 12600 = 8820, which is already below £10000 after only 2 years — the wrong rate crosses the threshold too fast.
- (c) 27.1 cm — The model length is 20.6 ÷ 76 = 0.271052... metres. Converting to centimetres by multiplying by 100 gives 27.1052..., which rounds to 27.1 cm. Forgetting to convert metres to centimetres leaves the answer as 0.271052... metres, which rounds to 0.3 cm if the unit is simply relabelled. Multiplying by 1000 instead of 100 when converting metres to centimetres gives 271.052..., which rounds to 271.1 cm. Multiplying by 76 instead of dividing, 20.6 × 76 = 1565.6, uses the scale factor the wrong way round — that would be the real length if the model were 20.6 units long, not the other way round.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (b) −3 — Method: the gradient is the change in the vertical value divided by the change in the horizontal value, with both changes taken in the same direction along the line. Working: going from (1, 20) to (5, 8) the change in y is 8 − 20 = −12 and the change in x is 5 − 1 = 4, so the gradient is −12 ÷ 4 = −3. Answer: −3, and the negative sign is expected because the line falls from left to right. The distractors: 3 comes from subtracting the smaller y from the larger, 20 − 8 = 12, while still taking the x values from left to right, which loses the minus sign that says the line falls; −12 is the change in y left undivided by the change in x of 4; −1/3 comes from dividing the change in x by the change in y, 4 ÷ (−12), turning the gradient upside down.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (c) Map A, where the distance is 40 cm — 10 km = 1,000,000 cm. On Map A: 1000000 ÷ 25000 = 40 cm. On Map B: 1000000 ÷ 50000 = 20 cm. Since 40 cm is longer than 20 cm, the same real distance appears longer on Map A, the map with the smaller scale number. 'Map B, where the distance is 20 cm' has the correct working for Map B but names the wrong map as the one with the longer length. 'Map A, where the distance is 20 cm' correctly identifies Map A but pairs it with Map B's length. 'Map B, where the distance is 40 cm' correctly identifies Map A's length but attaches it to the wrong map.
- (a) 35/32 — Work out each weekly total first. Last week: 5 × 7 = 35 hours. This week: 4 × 8 = 32 hours. Last week's total is being written as a fraction of this week's total, so last week goes on the top and this week goes on the bottom, giving 35/32. The two totals share no common factor, so the fraction cannot be cancelled. It is greater than 1, which says that Priya worked more hours last week than this week.
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (c) 27 : 64 — For similar solids, the ratio of volumes is the ratio of lengths cubed: 3³ : 4³ = 27 : 64. 3 : 4 comes from using the height ratio itself as the volume ratio, without cubing it at all. 9 : 16 comes from squaring each part instead of cubing (3² : 4²) — squaring is the rule for area, not volume. 27 : 4 comes from cubing only the first part of the ratio (3³ = 27), and leaving the second part uncubed.
- (d) 0.40 m/min — To estimate an instantaneous rate of change at a point without a diagram, use the gradient of a chord joining two points close to it, one on each side. At t = 9: 0.02 × 81 = 1.62, so h = 1.62 + 0.5 = 2.12. At t = 11: 0.02 × 121 = 2.42, so h = 2.42 + 0.5 = 2.92. The change in height is 2.92 − 2.12 = 0.80 and the change in time is 11 − 9 = 2, so the gradient of the chord is 0.80 ÷ 2 = 0.40. Reporting the change in height, 0.80, on its own is not a rate, because it has not been divided by the 2 minutes over which it happened. Using the chord from t = 0 (where h = 0.5) to t = 11 instead gives 2.92 − 0.5 = 2.42, and 2.42 ÷ 11 = 0.22, which is the average gradient over the whole 11 minutes, not the instantaneous rate at t = 10. Substituting t = 10 into the formula gives 0.02 × 100 + 0.5 = 2.50, which is the height of the water at that moment, not the rate at which the height is rising. The estimated instantaneous rate of change at t = 10 is 0.40 m/min.
Build your own mix at the worksheet builder.