- 1.A pump fills a paddling pool at a rate of 130 litres per hour. Work out the rate in litres per minute, to 2 decimal places.
- 2.A laptop costs £800 when new. Its value decreases by 25% of its value at the start of each year. Work out how much value the laptop loses in the second year.
- 3.A shop sells rope by the metre. 3 m costs £7.50 and 5 m costs £11.00. Does this data show that the cost is directly proportional to the length of rope bought? Choose the correct verdict and reason.
- 4.The number of subscribers to a streaming app, in thousands, is plotted against time, in months since launch. A tangent to the graph at t = 6 months has gradient 4.8. A tangent at t = 18 months has gradient 1.1. A manager claims the app is growing faster at 18 months than it was at 6 months. Work out how the growth rate has changed, and decide whether the manager is correct.
- 5.The density of a type of solid plastic is 0.9 g/cm³. Work out the mass of 0.5 m³ of the plastic, in kilograms.
- 6.A car is bought for £9000. Its value decreases by 8% each year. Work out its value after 2 years.
- 7.A sequence is defined by the iterative rule x_{n+1} = 0.5x_n + 20, with x_0 = 0. By working out x_1, x_2 and x_3, find the value that the sequence is approaching.
- 8.y is directly proportional to x. When x = 5, y = 18. Work out the value of y when x = 15.
- 9.The total cost, in pounds, of manufacturing a batch of components is plotted against the number of components produced. A tangent to this graph at a particular point has gradient 3.60. What does the value 3.60 represent?
- 10.A sprinter's distance from the start line, in metres, is plotted against time, in seconds. A tangent to the graph at t = 2 seconds has gradient 6. A tangent at t = 8 seconds has gradient 9.5. Which statement correctly compares the sprinter's speed at these two times?
- 11.A greenhouse's temperature, in °C, is recorded every hour during the day: 09:00, 15.0; 10:00, 18.4; 11:00, 20.1; 12:00, 19.8; 13:00, 17.2. Work out between which two consecutive readings the instantaneous rate of change of the temperature is most likely to have been zero.
- 12.The height of a candle, in cm, is measured as it burns: t = 0 min, height = 20.0; t = 3 min, height = 18.7; t = 5 min, height = 17.5; t = 6 min, height = 16.6; t = 7 min, height = 15.4; t = 9 min, height = 13.4. Which pair of readings gives the best estimate of the instantaneous rate of change of the height at t = 6 minutes, and why?
- 13.The strength of a radio signal, in units, is inversely proportional to the square of the distance from the transmitter, in km. At a distance of 2 km the signal strength is 20 units. Construct the equation connecting signal strength S and distance d, then work out the distance at which the signal strength is 5 units.
- 14.A stall sells bottles of juice. Two bottles cost £3.00, five bottles cost £7.50 and eight bottles cost £12.00. The cost, C pounds, is in a fixed ratio to the number of bottles, n. Write down a formula for C in terms of n.
- 15.The value of a rare coin increases by 12% each year. The coin is currently worth £270. Work out the value of the coin after 2 years, giving your answer to the nearest penny.
Answer key
- (a) 2.17 litres per minute — There are 60 minutes in an hour, so to convert litres per hour to litres per minute you divide by 60: 130 ÷ 60 = 2.1666..., which rounds to 2.17 litres per minute. Multiplying by 60 instead of dividing gives 130 × 60 = 7800.00 litres per minute, using the conversion factor the wrong way round. Leaving the rate unchanged, 130.00, ignores that 'per hour' and 'per minute' are different units. Dividing by 50 instead of 60, misremembering the number of minutes in an hour, gives 130 ÷ 50 = 2.60 litres per minute.
- (a) £150 — Value after year 1: £800 × 0.75 = £600. Value after year 2: £600 × 0.75 = £450. The loss during the second year alone is £600 − £450 = £150. £450 comes from giving the value remaining after 2 years, not the amount lost during the second year. £200 comes from working out the loss during the first year instead of the second: £800 − £600 = £200. £350 comes from working out the total loss over both years instead of just the second year's loss: £800 − £450 = £350.
- (a) No — the cost per metre differs: £2.50/m vs £2.20/m — Method: divide cost by length for each pair and compare the unit rates. Working: £7.50 ÷ 3 = £2.50 per m; £11.00 ÷ 5 = £2.20 per m. The rates are different, so this is NOT direct proportion. Wrong options: 'Yes — both amounts increase' wrongly assumes any increasing relationship is proportional; 'No — because 5 m costs more in total' judges by total cost rather than the rate per metre, which is not valid reasoning on its own; 'Yes — the cost per metre is £2.50 in both cases' miscalculates the second rate (11.00 ÷ 5 is £2.20, not £2.50).
- (b) No — rate fell by 3.7 thousand/month — Each tangent gradient is the instantaneous growth rate, in thousand subscribers per month. To compare them, subtract the later rate from the earlier one: 4.8 − 1.1 = 3.7. Since 1.1 is less than 4.8, the growth rate has fallen by 3.7 thousand subscribers per month, so the manager is wrong — the app is growing more slowly at 18 months, not faster. Subtracting the other way round and calling the result a rise, 'rate rose by 3.7 thousand/month', gets the direction backwards: the later gradient is the smaller of the two. Adding the two gradients, 4.8 + 1.1 = 5.9, and calling this a combined rate that shows speeding up, is the wrong operation for comparing two rates. Treating the difference 3.7 as a total number of subscribers lost, rather than a rate in thousands per month, confuses a rate with a count. Always subtract the two rates in a sensible order and keep the units in thousands per month.
- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (c) £7617.60 — To decrease by 8% each year, multiply by 0.92 (100% − 8%) twice. £9000 × 0.92 × 0.92 = £7617.60. £7560.00 comes from treating the two 8% decreases as a single flat 16% decrease applied once instead of compounding: £9000 × 0.84 = £7560.00. £8280.00 comes from applying the 8% decrease only once, for 1 year instead of 2: £9000 × 0.92 = £8280.00. £10497.60 comes from multiplying by 1.08 twice, increasing the value instead of decreasing it: £9000 × 1.08 × 1.08 = £10497.60.
- (c) 40 — Working out successive terms shows where the sequence is heading, but the terms themselves keep changing — the limit is the value where the sequence stops changing, so x_{n+1} = x_n = L there. Substituting into the rule: L = 0.5L + 20. Subtracting 0.5L from both sides: L − 0.5L = 20, so 0.5L = 20, and L = 20 ÷ 0.5 = 40. The individual terms are x_1 = 0.5 × 0 + 20 = 20, x_2 = 0.5 × 20 + 20 = 30 and x_3 = 0.5 × 30 + 20 = 35, getting closer to this value but not equal to it — 35 is only the third term, not the limit. Multiplying by 0.5 instead of dividing at the final step, 20 × 0.5 = 10, undoes the rearrangement rather than completing it, and gives a value smaller than terms the sequence has already passed. Writing the fixed-point equation with the wrong sign, L = 0.5L − 20, gives 0.5L = −20 and L = −40, which cannot be right since every term in the sequence is positive and increasing. The value the sequence is approaching is 40.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (d) Faster at t = 8s — still accelerating — The gradient of a tangent on a distance-time graph is the instantaneous speed, in m/s. At t = 2 seconds the speed is 6 m/s; at t = 8 seconds it is 9.5 m/s, which is faster, so the sprinter is still accelerating between these two times. Saying the sprinter is slower at t = 8s reverses the comparison — 9.5 is greater than 6, not less. Writing 9.5 − 6 = 3.5 and calling this 'metres further covered' turns the difference of two speeds into a distance, which the units do not support: a difference of two speeds is itself a speed, not a distance. Taking 9.5 m/s, the larger of the two instantaneous speeds, as the average speed for the whole race confuses a speed at one instant with an average over the whole distance, which would need the total distance and total time, not two tangent gradients.
- (a) 11:00 to 12:00 — Method: the instantaneous rate of change is zero at a turning point, where a rising trend becomes a falling trend; that lies within the first interval whose difference has changed sign from the interval before it. Working: the differences between consecutive readings are +3.4 °C (09:00 to 10:00), +1.7 °C (10:00 to 11:00), −0.3 °C (11:00 to 12:00) and −2.6 °C (12:00 to 13:00); the sign changes from positive to negative within 11:00 to 12:00, since the temperature is still rising up to 11:00 (20.1 °C, the highest recorded value) and has fallen by 12:00, so the instantaneous rate of change was zero somewhere within that interval. Choosing 09:00 to 10:00 picks out the interval with the largest positive difference, +3.4 °C, confusing the fastest rise with no change at all. Choosing 10:00 to 11:00 picks the last interval where the temperature was still rising, one interval too early, without checking that the very next interval turns negative. Choosing 12:00 to 13:00 picks out the interval with the largest-magnitude difference, −2.6 °C, the fastest fall, not where the change is zero. Zero instantaneous rate of change happens at a turning point, where the readings stop rising and start falling — find the FIRST interval whose difference has flipped sign from the one before it, not the biggest change or an interval where the old sign still held.
- (b) t = 5 and t = 7 (closest, evenly spaced) — To estimate the instantaneous rate of change at t = 6, use the chord centred on t = 6 with the closest readings on either side, t = 5 and t = 7. The gradient of this chord is 15.4 − 17.5 = −2.1, then −2.1 ÷ 2 = −1.05 cm per minute. The interval t = 3 to t = 9 is also centred on t = 6 but is wider: 13.4 − 18.7 = −5.3, then −5.3 ÷ 6 ≈ −0.88 cm per minute — this brings in more of the curve's own change in steepness, so it is a worse estimate of the rate at the single instant t = 6. Using t = 6 and t = 7 only gives 15.4 − 16.6 = −1.2, then −1.2 ÷ 1 = −1.2 cm per minute, but this is not centred on t = 6 — it estimates the rate over (6, 7), not at t = 6 itself. Using t = 0 and t = 6 gives 16.6 − 20.0 = −3.4, then −3.4 ÷ 6 ≈ −0.57 cm per minute, the average rate for the whole first six minutes, not the rate at the instant t = 6. Always choose the chord that brackets the point as closely as possible.
- (c) 4 km — Since signal strength is inversely proportional to the square of the distance, S = k/d². Using d = 2, S = 20: 2² = 4, so 20 = k ÷ 4, giving k = 20 × 4 = 80. The equation is S = 80/d². When S = 5: d² = 80 ÷ 5 = 16, so d = 4 (taking the positive root, since distance cannot be negative). Stopping at d² = 16 without taking the square root leaves 16, the square of the distance, not the distance itself. Treating the relationship as inversely proportional to distance itself, rather than to its square, gives k = 20 × 2 = 40 and then d = 40 ÷ 5 = 8, a different relationship. Multiplying by S instead of dividing by it when isolating d² gives d² = 80 × 5 = 400 and d = 20, the wrong operation. The distance at which the signal strength is 5 units is 4 km.
- (c) C = 1.5n — Method: a fixed ratio between C and n means C is always the same multiple of n, and that multiple is the cost of one bottle. Working: 3.00 ÷ 2 = 1.5, 7.50 ÷ 5 = 1.5 and 12.00 ÷ 8 = 1.5, so every bottle costs £1.50 and C = 1.5n. Answer: C = 1.5n. The distractors: C = n + 1 comes from subtracting on the first row, 3 − 2 = 1, and adding that difference instead of multiplying; it fits the first row and fails the other two, which is why three rows are given; C = 3n reads the £3.00 as the price of one bottle when it is the price of two; C = n/1.5 divides the number of bottles by the price of one bottle, which works out how many bottles a pound buys instead of what n bottles cost.
- (c) £338.69 — To increase by 12% each year, multiply by 1.12 twice. £270 × 1.12 × 1.12 = £338.688, which rounds to £338.69 (nearest penny, since the third decimal place is 8). £334.80 comes from treating the two 12% increases as a single flat 24% increase applied once instead of compounding: £270 × 1.24 = £334.80. £302.40 comes from applying the 12% increase only once, for 1 year instead of 2: £270 × 1.12 = £302.40. £338.68 comes from rounding £338.688 down to the nearest penny instead of up.