Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.To make a shade of green paint, the amount of yellow paint used is always 0.75 times the amount of blue paint used. Write the amount of blue paint as a fraction of the amount of yellow paint, in its simplest form.
- 2.A dog walker's charge, C pounds, for walking a dog for m minutes is shown on a straight-line graph. The line passes through the points (20, 14) and (50, 26). Work out the charge for a 65-minute walk.
- 3.In a science lesson Priya has 10 litres of a solution that is 30% salt. She adds water to make a solution that is 20% salt. Work out how many litres of water she adds.
- 4.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 5.A map has a scale of 2 cm : 5 km. A footpath measures 8 cm on the map. Work out the real length of the footpath, in kilometres.
- 6.The table shows values of x and y. x: 3, 5, 8. y: 12, 20, 32. Which statement correctly describes the relationship between x and y?
- 7.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 8.A shop's profit, P pounds, is in direct proportion to the number of items sold, n. When 15 items are sold, the profit is £45. Write down the ratio n : P in its simplest form for this shop.
- 9.A water tank has a capacity of 500 litres. It currently holds 350 litres of water. Write the amount of empty space in the tank as a fraction of the tank's capacity. Give your answer in its simplest form.
- 10.A beaker holds 500 g of a salt solution of concentration 12%. Pure water is added until the concentration falls to 8%. Work out the mass of water added.
- 11.A car travels for 3 hours at an average speed of 80 km/h and then for 1 hour at an average speed of 40 km/h. Work out the average speed for the whole journey.
- 12.Water flows into a tank at a constant rate. After 8 minutes the tank holds 200 litres. Write the ratio of time in minutes to volume in litres, in its simplest form.
- 13.A shop's takings were £4500 in May. In June the takings fell by £900. Write the June takings as a fraction of the May takings, in its simplest form.
- 14.A mortar mix is made from sand and cement in the ratio 5 : 3. Write the ratio of sand to the total mix in its simplest form.
- 15.A recipe needs 1.2 kg of flour. Dan has 750 g of flour in his cupboard. Write the mass of flour the recipe needs as a fraction of the mass of flour Dan has. Give your answer in its simplest form.
Answer key
- (d) 4/3 — The amount of yellow paint is 0.75 times the amount of blue paint. As a fraction, 0.75 = 3/4, so yellow = 3/4 of blue. To write blue as a fraction of yellow, use the reciprocal: flip 3/4 to get 4/3. 3/4 comes from keeping the original fraction without inverting it. 1/4 comes from computing 1 − 3/4 = 1/4, which is not how a fraction reverses. 40/3 comes from converting 0.75 to a fraction as 75/1000 = 3/40 (misplacing the decimal point), then inverting that.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (b) 5 litres — Method: adding water changes the total volume but adds no salt, so work out the volume of salt, then the total volume that makes that salt 20% of the mixture, then the extra water. Working: 30% of 10 litres is 0.3 × 10 = 3 litres of salt. For the same 3 litres to be 20% of the new mixture, the new total volume is 3 ÷ 0.2 = 15 litres. The water added is the extra volume, 15 − 10 = 5 litres. Answer: 5 litres. The distractors: 3 litres is the volume of salt in the solution, which is the first step and not what the question asks for; 15 litres is the total volume of the new mixture, which counts the 10 litres already in the container as water that was poured in; 2 litres comes from taking 20% of the original 10 litres, applying the new percentage to the old volume instead of to the new one.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (b) 20 km — The scale 2 cm : 5 km means each 1 cm on the map represents 5 ÷ 2 = 2.5 km in real life. The footpath is 8 cm on the map, so its real length is 8 × 2.5 = 20 km. 40 km comes from multiplying 8 by 5 directly, ignoring that the scale's '2 cm' has to be divided out first: 8 × 5 = 40. 3.2 km comes from dividing 8 by 2.5 instead of multiplying: 8 ÷ 2.5 = 3.2. 5 km comes from multiplying 2.5 by the scale's '2' instead of by the footpath's 8 cm: 2.5 × 2 = 5.
- (a) y is always 4 times x. — Check the multiplier for each pair: 12 ÷ 3 = 4, 20 ÷ 5 = 4, 32 ÷ 8 = 4 — the same multiplier every time, so y is always 4 times x. 'x is always 4 times y' comes from writing the multiplier the wrong way round. 'y is always x plus 9' only works for the first pair (3 + 9 = 12); it gives 14 for x = 5 and 17 for x = 8, not 20 and 32. 'y is always double x, plus 6' also only works for the first pair (3 × 2 + 6 = 12); it gives 16 for x = 5, not 20.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (c) 1 : 3 — n : P = 15 : 45. Dividing both parts by their highest common factor, 15, gives 1 : 3. Inverting the ratio, 3 : 1, swaps profit and number of items. Dividing only the n-part by 15, getting 1, but leaving the P-part as 45 gives 1 : 45 — only one side has been simplified. Dividing only the P-part by 15, getting 3, but leaving the n-part as 15 gives 15 : 3, the opposite partial mistake.
- (b) 3/10 — Work out the empty space: 500 − 350 = 150 litres. Form the fraction 150/500; both numbers share a factor of 50, so 150 ÷ 50 = 3 and 500 ÷ 50 = 10, giving 3/10. 7/10 comes from writing the fraction of the tank that is full (350/500), instead of the empty space. 1/2 comes from miscalculating 500 − 350 as 250 instead of 150. 3/7 comes from comparing the empty space with the water held (150/350), instead of with the tank's total capacity.
- (b) 250 g — Method: adding water changes the total mass but not the mass of salt, so find the salt, hold it fixed, use the new ratio to find the new total mass and subtract the mass already in the beaker. Working: 12:100 = x:500 gives 12 ÷ 100 × 500 = 60 g of salt; that 60 g must be 8% of the new mixture, so 8:100 = 60:y gives y = 60 ÷ 8 × 100 = 750 g; the water added is 750 − 500 = 250 g. Answer: 250 g. The distractors: 750 g is the mass of the diluted solution, given without taking away the 500 g that was in the beaker to start with; 60 g is the mass of salt, the quantity that stays the same, given instead of the mass of water; 20 g comes from treating the fall from 12% to 8% as 4% of the original 500 g, which measures a change in concentration as though it were a mass of water.
- (a) 70 km/h — Method: average speed for a whole journey is the total distance divided by the total time, not the mean of the separate speeds. Working: 3 × 80 = 240 km and 1 × 40 = 40 km, giving 280 km in 3 + 1 = 4 hours, so 280 ÷ 4 = 70. Answer: 70 km/h. The distractors: 60 km/h comes from taking the mean of 80 and 40, which would only be right if equal times were spent at each speed; 280 km/h is the total distance written with a speed unit, from forgetting to divide by the total time; 80 km/h comes from quoting the speed of the longer leg as the average for the whole journey.
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)
- (a) 4/5 — Method: find the June takings first, then write them over the May takings and cancel. Working: the takings fell by £900, so June is £4500 − £900 = £3600; the fraction is 3600/4500, and dividing the numerator and the denominator by 900 gives 4/5. Answer: 4/5 of the May takings. The distractors: 1/5 comes from writing the fall over the May takings, 900/4500, which answers how far the takings dropped rather than what June's takings are compared with May's; 5/4 comes from writing May over June, 4500/3600, reversing the order the question asks for; 4/9 comes from writing June over the two months added together, 3600/8100, a part-to-whole fraction when the comparison asked for is with May alone.
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (d) 8/5 — Two masses can only be compared once they are in the same unit. Since 1 kg is 1000 g, the recipe needs 1200 g. The recipe's mass is being written as a fraction of Dan's mass, so 1200 goes on the top and 750 on the bottom, giving 1200/750. The highest common factor of the two is 150: 1200 ÷ 150 = 8 and 750 ÷ 150 = 5. The fraction is 8/5, which is greater than 1 because the recipe needs more flour than Dan has.
Build your own mix at the worksheet builder.