Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A crate exerts a force of 84 N on the floor through a base with an area of 2.4 m². Work out the pressure on the floor, in N/m².
- 2.It takes 8 painters 6 days to paint a fence. Working at the same rate, work out how many days 4 painters would take to paint the same fence.
- 3.A candle burns down at a constant rate. Its height, h cm, is plotted against time, t minutes, on a straight-line graph. The gradient of the line is −0.3. Which statement correctly describes what the gradient means?
- 4.In a fruit bowl, the number of bananas is 3/4 of the number of apples. There are 16 apples in the bowl. Write the number of apples as a fraction of the number of bananas. Give your answer in its simplest form.
- 5.Cheng is paid an hourly rate that is proportional to the number of hours she works. She earns £52.50 for 7 hours. Work out how much she earns for 11 hours, assuming the same rate.
- 6.y is directly proportional to x. When x = 5, y = 18. Work out the value of y when x = 15.
- 7.Two mathematically similar water bottles have a volume scale factor of 8 from the smaller bottle to the larger bottle. Work out the surface area scale factor from the smaller bottle to the larger bottle.
- 8.Order these three values from smallest to largest: 3/8, 0.43, 41%.
- 9.Two mathematically similar circles have radii 4 cm and 20 cm. Write the ratio of the area of the smaller circle to the area of the larger circle in its simplest form.
- 10.Ffion is paid £11.20 per hour. She works 6 hours on Monday and 4.5 hours on Tuesday. Work out her total pay for the two days.
- 11.5 decorators paint 3 rooms in 6 hours. All the decorators work at the same rate. Work out how long it takes 10 decorators to paint 5 rooms.
- 12.A sculptor makes two mathematically similar statues. The smaller statue is 20 cm tall and 80 ml of varnish covers its surface. The larger statue is 50 cm tall. Work out how much varnish is needed to cover the surface of the larger statue.
- 13.Two mathematically similar rectangles have widths 5 cm and 10 cm. The perimeter of the smaller rectangle is 18 cm. Work out the perimeter of the larger rectangle.
- 14.The height of a ball, in metres, above the ground is plotted against time, in seconds, after it is thrown. The tangent to the graph at t = 1.5 seconds has gradient 2. Which of these four statements about the ball at t = 1.5 seconds is correct?
- 15.A market stall sells apples at a fixed price per kilogram. Priya buys 3 kg for £5.40. Write the ratio of the mass in kilograms to the cost in pounds, in its simplest form.
Answer key
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
- (d) The candle's height decreases by 0.3 cm every minute. — A negative gradient means the quantity on the vertical axis decreases as the quantity on the horizontal axis increases. The size of the gradient, 0.3, gives the amount of decrease per minute.
- (b) 4/3 — Work out the number of bananas: 3/4 of 16 = 12. Form the fraction 16/12 (apples over bananas); both numbers share a factor of 4, so 16 ÷ 4 = 4 and 12 ÷ 4 = 3, giving 4/3. 3/4 comes from giving the fraction that was already stated in the question (bananas as a fraction of apples), instead of inverting it. 4/1 comes from reading '3/4 of the apples' as 'the apples reduced by 3/4', giving only 4 bananas, then 16/4 = 4. 4/7 comes from comparing the apples with the total number of pieces of fruit (16/28), instead of with the bananas alone.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (c) 54 — Method: y = kx, so k = y ÷ x. Working: k = 18 ÷ 5 = 3.6. At x = 15: y = 3.6 × 15 = 54. Wrong options: 28 comes from adding the change in x (10) onto y instead of scaling; 6 comes from treating the relationship as inverse proportion (k = 5 × 18 = 90, then y = 90 ÷ 15 = 6); 60 comes from rounding the constant up to 4 instead of using 3.6.
- (b) 4 — Method: find the length scale factor by taking the cube root of the volume scale factor, then square it to get the area scale factor. Working: 8 = 2³, so the length scale factor is 2, and the area scale factor is 2² = 4. Answer: 4. 8 comes from using the volume scale factor itself as if it were the area scale factor. 64 comes from squaring the volume scale factor, 8² = 64, instead of first taking its cube root. 2 comes from correctly finding the length scale factor but then forgetting to square it.
- (a) 3/8, 41%, 0.43 — Method: convert every value to a decimal so they can be compared on the same scale, then order them. Working: 3/8 = 0.375, 41% = 0.41, and 0.43 stays as 0.43, so from smallest to largest the decimals are 0.375, 0.41, 0.43, giving the order 3/8, 41%, 0.43. Answer: 3/8, 41%, 0.43. The order 3/8, 0.43, 41% comes from comparing 0.43 and 41% as raw digits (43 versus 41) without converting 41% into the decimal 0.41 first, wrongly placing 0.43 before 41%. The order 0.43, 41%, 3/8 comes from placing the values in completely reversed order, from largest to smallest instead of smallest to largest. The order 41%, 0.43, 3/8 comes from ordering the values by their TYPE (percentage, then decimal, then fraction) rather than by their actual size.
- (c) 1 : 25 — The radii are in the ratio 4 : 20, which simplifies to 1 : 5. Areas scale with the square of the length ratio, so the area ratio is 1² : 5² = 1 : 25. Giving 1 : 5 uses the radius ratio without squaring it. Giving 1 : 10 doubles the radius ratio instead of squaring it. Giving 25 : 1 has the areas the right way round for larger to smaller, not smaller to larger.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
- (c) 5 hours — Method: measure the job in decorator-hours, which is in the same ratio as the number of rooms, then share the decorator-hours between the decorators available. Working: 5 decorators × 6 hours = 30 decorator-hours for 3 rooms, so one room takes 30 ÷ 3 = 10 decorator-hours; 5 rooms take 5 × 10 = 50 decorator-hours; shared between 10 decorators that is 50 ÷ 10 = 5 hours. Answer: 5 hours. The distractors: 3 hours comes from halving the 6 hours because the number of decorators doubles, while forgetting that there are also more rooms to paint; 10 hours comes from scaling the 6 hours up for the rooms only, 6 × 5 ÷ 3, and leaving the workforce at 5 decorators; 6 hours comes from assuming that doubling the decorators and increasing the rooms cancel each other out, which they do not, because the rooms rise by a factor of 5/3 and the workforce by a factor of 2.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (c) 36 cm — A perimeter is built from lengths, so it is multiplied by the length scale factor and not by the square of it. The scale factor from the smaller rectangle to the larger one is 10 ÷ 5 = 2. The larger perimeter is therefore 18 × 2 = 36 cm.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (c) 5 : 9 — Write the ratio mass : cost = 3 : 5.4. Multiply both parts by 10 to clear the decimal: 30 : 54. Both numbers share a factor of 6, so 30 ÷ 6 = 5 and 54 ÷ 6 = 9, giving 5 : 9. 3 : 5 comes from ignoring the decimal point and treating £5.40 as £5. 9 : 5 comes from writing the ratio the wrong way round, cost to mass instead of mass to cost. 1 : 18 comes from multiplying only the cost by 10 instead of both parts, giving 3 : 54, and then cancelling that correctly to 1 : 18 — the cancelling is fine, but the ratio being cancelled is not the right one.
Build your own mix at the worksheet builder.