Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A curve has equation y = x² + 2x. Work out the average rate of change of y with respect to x over the interval from x = 1 to x = 4.y = x² + 2x
- 2.A footpath is drawn 3 cm long on a map with a scale of 1 : 50 000. Work out the real length of the footpath, in metres.
- 3.The price of a cycling helmet rises from £80 to £116. Work out the percentage increase.
- 4.A model car is built at a scale of 1 : 20 compared with the real car. Work out the factor by which the surface area to be painted on the real car is bigger than the surface area of the model.
- 5.A necklace is made using gold beads and silver beads in the ratio 7:3. There are 40 more gold beads than silver beads. Work out the total number of beads in the necklace.
- 6.Tap A fills a swimming pool in 6 hours. Tap B pours water twice as fast as tap A. The time taken to fill the pool is inversely proportional to the rate of flow. Work out how long tap B takes to fill the pool.
- 7.Write the ratio 0.75 : 2 as a ratio of whole numbers in its simplest form.
- 8.A science technician mixes 400 g of a salt solution of concentration 5% with 100 g of a salt solution of concentration 25%. Work out the concentration of the mixture.
- 9.Aisha invests £3200 in Account A, which pays 5% compound interest each year. She also invests £3200 in Account B, which pays 3% simple interest each year. Work out how much more Account A is worth than Account B after 2 years.
- 10.Cheng is paid an hourly rate that is proportional to the number of hours she works. She earns £52.50 for 7 hours. Work out how much she earns for 11 hours, assuming the same rate.
- 11.A textbook is reduced from £60 to £45. Work out the percentage reduction.
- 12.Two scale plans of the same football pitch are drawn: Plan A has a scale of 1 : 1000 and Plan B has a scale of 1 : 200. A pitch length is 8 cm on Plan A. Work out the length of the same pitch on Plan B, in centimetres.
- 13.Two mathematically similar logos are printed on a poster. They have areas 20 cm² and 45 cm². Nadia says that the length scale factor from the smaller logo to the larger logo is 45 ÷ 20 = 2.25. Give a reason why Nadia is incorrect, and work out the correct length scale factor.
- 14.A hiker's distance from the start of the trail, in kilometres, is plotted against time, in minutes, since she set off. At t = 45 minutes she stops to rest, so her distance from the start is neither increasing nor decreasing at that instant. Which statement about the tangent to the distance–time graph at t = 45 minutes is correct?
- 15.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
Answer key
- (a) 7 — The average rate of change of y with respect to x over an interval is the change in y divided by the change in x between its two endpoints — the gradient of the chord joining them, not a rate at a single point. At x = 1: 2 × 1 = 2, so y = 1 + 2 = 3. At x = 4: 2 × 4 = 8, so y = 16 + 8 = 24. The change in y is 24 − 3 = 21 and the change in x is 4 − 1 = 3, so the average rate of change is 21 ÷ 3 = 7. Reporting the change in y, 21, on its own is not a rate of change, because it has not been divided by the 3 units of x over which it happened. Reporting 3 is not a rate either — 3 is the width of the interval, and also the value of y at x = 1, and neither of those measures how fast y is changing. Subtracting in the wrong order gives −21 ÷ 3 = −7, the wrong sign. The average rate of change of y with respect to x over the interval is 7.
- (b) 1500 m — Method: multiply the map length by the scale to get the real length in centimetres, then divide by 100 to change centimetres into metres. Working: 3 × 50 000 = 150 000 cm, and 150 000 ÷ 100 = 1500. Answer: 1500 m. The distractors: 15000 m comes from dividing the 150 000 cm by 10 instead of 100; 150 m comes from dividing by 1000, the conversion for kilometres; 50000 m comes from writing the scale itself as the answer and ignoring the 3 cm measured on the map.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.
- (d) 400 — The area scale factor is the length scale factor squared: 20² = 400, so the real car's surface area is 400 times the model's. 20 comes from using the length scale factor itself, without squaring it. 8000 comes from cubing the length scale factor (20³), instead of squaring it — cubing is the rule for volume, not area. 40 comes from doubling the length scale factor (2 × 20), instead of squaring it.
- (a) 100 — The difference between the parts of the ratio is 7 − 3 = 4 parts, and this is worth 40 beads. Divide to find one part: 40 ÷ 4 = 10. The total number of parts is 7 + 3 = 10, so the total number of beads is 10 × 10 = 100. (40 is just the given difference between gold and silver, not the total. 70 is the number of gold beads only, using 7 parts. 30 is the number of silver beads only, using 3 parts.)
- (a) 3 hours — Method: for a fixed pool the rate of flow multiplied by the time taken is constant, so multiplying the rate by a factor divides the time by that same factor. Working: tap B's rate is 2 times tap A's rate, so tap B's time is 6 ÷ 2 = 3 hours. Answer: 3 hours. The distractors: 12 hours comes from multiplying the time by 2 as well, which treats the time as directly proportional to the rate and has the faster tap taking longer; 4 hours comes from reading ‘twice as fast’ additively, as two hours quicker, and working out 6 − 2 instead of scaling the time by a factor of 2; 1.5 hours comes from applying the factor of 2 twice, halving 6 to 3 and then halving again.
- (d) 3 : 8 — Multiply both parts by 4 to clear the decimal: 0.75 × 4 = 3 and 2 × 4 = 8, giving 3 : 8, which has no common factor other than 1. Giving 75 : 200 multiplies by 100 instead of 4, and has not then been simplified down to 3 : 8. Giving 0.75 : 2 has not been converted into whole numbers at all. Giving 3 : 2 converts the first part correctly but leaves the second part unscaled.
- (c) 9% — Method: a percentage concentration is the ratio of salt to solution written per 100 g, so scale each concentration to the mass it belongs to, add the two masses of salt, then scale the ratio of salt to mixture back to a denominator of 100. Working: 5:100 = x:400 gives 5 ÷ 100 × 400 = 20 g of salt, and 25:100 = y:100 gives 25 g of salt; the mixture holds 20 + 25 = 45 g of salt in 400 + 100 = 500 g of solution; 45:500 = 9:100. Answer: 9%. The distractors: 15% is the mean of 5% and 25%, which would only be right if the two masses were equal, and here one is four times the other; 21% comes from attaching the concentrations to the wrong masses, working out (400 × 25% + 100 × 5%) ÷ 500; 0.9% comes from working out 45 ÷ 500 = 0.09 and then moving the decimal point one place instead of two when writing the decimal as a percentage.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (d) 25% — Method: percentage decrease = decrease ÷ original amount × 100. Working: the reduction is £60 − £45 = £15, and 15 ÷ 60 = 0.25, so 0.25 × 100 = 25%. Answer: 25%. The distractors: 15% comes from quoting the £15 reduction as though pounds and per cent were the same thing; 33% comes from dividing the £15 by the new price £45 instead of by the original £60, which gives 33% to the nearest per cent; 75% is the new price written as a percentage of the old one, which is what is still paid rather than what has been taken off.
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (c) The tangent is horizontal, so its gradient is 0. — Method: at any point where a distance–time graph is momentarily neither increasing nor decreasing, the tangent to the graph at that point is horizontal, and the gradient of a horizontal line is 0 — this is the instantaneous rate of change at that instant. Working: since the hiker's distance is neither increasing nor decreasing at t = 45 minutes, the tangent there is horizontal, so its gradient is 0. Claiming the tangent is vertical, with an undefined gradient, is the opposite of what the stem says: a vertical tangent would mean the distance was changing infinitely fast at that instant, not that it had stopped changing, and on a distance–time graph it cannot happen at all. Reading the gradient as 45, the time value given in the stem, mistakes a value used to LOCATE the point for the rate of change AT that point. Claiming the gradient cannot be found without also knowing the distance at t = 45 minutes overlooks that 'momentarily stationary' already tells you the rate of change directly, without needing to read any distance value at all. Whenever a stem tells you a quantity is momentarily not changing, that is telling you the instantaneous rate of change directly — it is 0, and no further data is needed to find it.
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
Build your own mix at the worksheet builder.