- 1.A fruit squash is made by mixing squash and water. In a jug, 2/9 of the total volume is squash. A caterer makes up 4.5 litres of the squash mixture. Work out how many litres of squash are in the mixture.
- 2.A cleaning solution is made by mixing disinfectant and water in the ratio 1 : 9. Priti wants to make 6 litres of the solution in total. Work out how much disinfectant she needs.
- 3.A map has a scale of 1:25000. A road on the map is 6 cm long. Work out the real-life length of the road, giving your answer in kilometres.
- 4.Line P passes through the origin and the point (3, 21). Line Q passes through the origin and the point (5, 45). Both lines represent the distance, in metres, run by an athlete against the time, in seconds. Work out the gradient of the steeper line.
- 5.5 decorators paint 3 rooms in 6 hours. All the decorators work at the same rate. Work out how long it takes 10 decorators to paint 5 rooms.
- 6.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
- 7.A room is drawn on a plan with a scale of 1 : 200. On the plan the room has an area of 12 cm². Work out the real area of the room, in square metres.
- 8.Two mathematically similar logos are printed on a poster. They have areas 20 cm² and 45 cm². Nadia says that the length scale factor from the smaller logo to the larger logo is 45 ÷ 20 = 2.25. Give a reason why Nadia is incorrect, and work out the correct length scale factor.
- 9.y is directly proportional to x. When x = 8, y = 20. Work out the value of y when x = 12.
- 10.A hiker's distance from the start of the trail, in kilometres, is plotted against time, in minutes, since she set off. At t = 45 minutes she stops to rest, so her distance from the start is neither increasing nor decreasing at that instant. Which statement about the tangent to the distance–time graph at t = 45 minutes is correct?
- 11.A cordial drink is made by mixing cordial concentrate and water in the ratio 1 : 6. Freya says that a 700 ml jug of this drink contains 100 ml of concentrate. Is she correct? Give a reason for your answer.
- 12.A road sign 3 m tall casts a shadow 5 m long. At the same time, a nearby lamppost casts a shadow 10 m long. Work out the height of the lamppost.
- 13.A scale drawing of a garden uses a scale of 1 : 20. Write down a formula for the real length, L metres, in terms of the length on the drawing, d centimetres, given that 1 metre = 100 centimetres.
- 14.A textbook is reduced from £60 to £45. Work out the percentage reduction.
- 15.The table shows values of x and y. x: 3, 5, 8. y: 12, 20, 32. Which statement correctly describes the relationship between x and y?
Answer key
- (d) 1.00 litres — Squash is 2/9 of the mixture, so the squash volume is 4.5 × 2/9 = 1.00 litres. Using the water's fraction, 7/9, instead of squash's gives 4.5 × 7/9 = 3.50 litres — the volume of water, not squash. Dividing 4.5 by 9 but forgetting to multiply by the numerator 2 gives 4.5 ÷ 9 = 0.50 litres, which is only 1/9 of the mixture. Halving the total volume instead of applying the fraction 2/9 gives 4.5 ÷ 2 = 2.25 litres, which assumes the mixture is half squash.
- (a) 0.6 litres — The ratio 1 : 9 means the solution has 1 + 9 = 10 equal parts in total. Each part is 6 ÷ 10 = 0.6 litres, and disinfectant is 1 part, so Priti needs 0.6 litres of disinfectant. Giving 0.667 litres divides by 9, the number of parts of water, instead of the total number of parts, 10 (6 ÷ 9 ≈ 0.667). Giving 6 litres is the total amount of solution, not just the disinfectant's share of it. Giving 5.4 litres works out the water's share (6 × 9 ÷ 10 = 5.4), not the disinfectant's.
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
- (b) 9 m/s — The gradient of line P is 21 ÷ 3 = 7, so P has a rate of 7 m/s. The gradient of line Q is 45 ÷ 5 = 9, so Q has a rate of 9 m/s. Because 9 is greater than 7, line Q is the steeper line, with gradient 9 m/s. Taking line P's gradient instead of Q's gives 7 m/s, the less steep line. Subtracting the two lines' coordinates directly, (45 − 21) ÷ (5 − 3) = 24 ÷ 2 = 12 m/s, mixes points from different lines rather than using one line's own two points. Adding the two gradients, 7 + 9 = 16 m/s, treats 'steeper' as a total rather than a comparison.
- (c) 5 hours — Method: measure the job in decorator-hours, which is in the same ratio as the number of rooms, then share the decorator-hours between the decorators available. Working: 5 decorators × 6 hours = 30 decorator-hours for 3 rooms, so one room takes 30 ÷ 3 = 10 decorator-hours; 5 rooms take 5 × 10 = 50 decorator-hours; shared between 10 decorators that is 50 ÷ 10 = 5 hours. Answer: 5 hours. The distractors: 3 hours comes from halving the 6 hours because the number of decorators doubles, while forgetting that there are also more rooms to paint; 10 hours comes from scaling the 6 hours up for the rooms only, 6 × 5 ÷ 3, and leaving the workforce at 5 decorators; 6 hours comes from assuming that doubling the decorators and increasing the rooms cancel each other out, which they do not, because the rooms rise by a factor of 5/3 and the workforce by a factor of 2.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (c) 30 — Method: use y = kx and find k from the given pair of values, then substitute x = 12. Working: k = 20 ÷ 8 = 2.5, so y = 2.5 × 12 = 30. Answer: 30. 24 comes from treating the relationship as additive, adding the increase in x (12 − 8 = 4) straight onto y (20 + 4 = 24), instead of multiplying by k. 14.5 comes from finding k correctly (2.5) but then adding it to x instead of multiplying (12 + 2.5 = 14.5). 4.8 comes from finding k upside down, 8 ÷ 20 = 0.4, and multiplying by x: 12 × 0.4 = 4.8.
- (c) The tangent is horizontal, so its gradient is 0. — Method: at any point where a distance–time graph is momentarily neither increasing nor decreasing, the tangent to the graph at that point is horizontal, and the gradient of a horizontal line is 0 — this is the instantaneous rate of change at that instant. Working: since the hiker's distance is neither increasing nor decreasing at t = 45 minutes, the tangent there is horizontal, so its gradient is 0. Claiming the tangent is vertical, with an undefined gradient, is the opposite of what the stem says: a vertical tangent would mean the distance was changing infinitely fast at that instant, not that it had stopped changing, and on a distance–time graph it cannot happen at all. Reading the gradient as 45, the time value given in the stem, mistakes a value used to LOCATE the point for the rate of change AT that point. Claiming the gradient cannot be found without also knowing the distance at t = 45 minutes overlooks that 'momentarily stationary' already tells you the rate of change directly, without needing to read any distance value at all. Whenever a stem tells you a quantity is momentarily not changing, that is telling you the instantaneous rate of change directly — it is 0, and no further data is needed to find it.
- (c) Yes — 700 ÷ 7 = 100 ml for the 1 part of concentrate — Method: add the ratio parts to find the total number of parts, divide the total volume by this, then use the ratio to find concentrate's share. Working: 1 + 6 = 7 parts. 700 ÷ 7 = 100 ml per part. Concentrate = 1 part = 100 ml, so Freya is correct. Wrong options: 'divide 700 by 6' uses only one of the ratio numbers instead of the total of 7 parts, giving about 117 ml; '600 ml is concentrate' swaps which ratio number belongs to the concentrate and which belongs to the water; 'half of 700 ml should be concentrate' ignores the ratio altogether and assumes an equal split.
- (c) 6.00 m — Method: the ratio of height to shadow length is the same for both objects. Working: road sign height ÷ shadow = 3 ÷ 5 = 0.6. Lamppost height = 0.6 × 10 = 6.00 m. Wrong options: 16.67 m comes from inverting the ratio, using shadow ÷ height instead of height ÷ shadow (10 × 5 ÷ 3); 8.00 m comes from adding the difference between the two shadow lengths to the road sign's height instead of scaling (3 + (10 − 5)); 1.50 m comes from multiplying by the ratio of the two shadow lengths the wrong way round (3 × 5 ÷ 10).
- (c) L = d/5 — The scale 1 : 20 means each cm on the drawing represents 20 cm in real life, so the real length in cm is 20d. Converting to metres by dividing by 100: L = 20d/100 = d/5.
- (d) 25% — Method: percentage decrease = decrease ÷ original amount × 100. Working: the reduction is £60 − £45 = £15, and 15 ÷ 60 = 0.25, so 0.25 × 100 = 25%. Answer: 25%. The distractors: 15% comes from quoting the £15 reduction as though pounds and per cent were the same thing; 33% comes from dividing the £15 by the new price £45 instead of by the original £60, which gives 33% to the nearest per cent; 75% is the new price written as a percentage of the old one, which is what is still paid rather than what has been taken off.
- (a) y is always 4 times x. — Check the multiplier for each pair: 12 ÷ 3 = 4, 20 ÷ 5 = 4, 32 ÷ 8 = 4 — the same multiplier every time, so y is always 4 times x. 'x is always 4 times y' comes from writing the multiplier the wrong way round. 'y is always x plus 9' only works for the first pair (3 + 9 = 12); it gives 14 for x = 5 and 17 for x = 8, not 20 and 32. 'y is always double x, plus 6' also only works for the first pair (3 × 2 + 6 = 12); it gives 16 for x = 5, not 20.
Build your own mix at the worksheet builder.