Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 2.A dog walker's charge, C pounds, for walking a dog for m minutes is shown on a straight-line graph. The line passes through the points (20, 14) and (50, 26). Work out the charge for a 65-minute walk.
- 3.In a class, 50% of the students study French, 30% study Spanish and the rest study German. Write down the ratio of French : Spanish : German students, in its simplest form.
- 4.The height of a ball, in metres, above the ground is plotted against time, in seconds, after it is thrown. The tangent to the graph at t = 1.5 seconds has gradient 2. Which of these four statements about the ball at t = 1.5 seconds is correct?
- 5.A company's turnover this year is £180,000. Last year's turnover was £120,000. Write down this year's turnover as a percentage of last year's turnover.
- 6.Two quantities y and z are each in direct proportion to x, and are given by y = 3x and z = 7x. Work out the difference between the value of y and the value of z when x = 4.y = 3x
- 7.Two mathematically similar cylinders have heights in the ratio 3 : 4. Write the ratio of their volumes in its simplest form.
- 8.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
- 9.A curve has equation y = x² + 2x. Work out the average rate of change of y with respect to x over the interval from x = 1 to x = 4.y = x² + 2x
- 10.The price of a games console is reduced by 10%. In a later sale the reduced price is reduced by 10% again. Work out the overall percentage decrease.
- 11.A car travels at a constant speed. It travels 150 miles in 3 hours. At the same speed, work out how far it travels in 5 hours.
- 12.The tangent to a curve at the point where x = 4 has equation y = 3x − 2. Work out the instantaneous rate of change of y with respect to x at x = 4.y = 3x − 2
- 13.A road sign 3 m tall casts a shadow 5 m long. At the same time, a nearby lamppost casts a shadow 10 m long. Work out the height of the lamppost.
- 14.The price of a share falls by 10% on Monday and then rises by 10% on Tuesday. Work out the overall percentage change from Monday's starting price.
- 15.A map has a scale of 1 : 100 000. Two railway stations are 8 km apart in real life. Work out the distance between the stations on the map, in centimetres.
Answer key
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (c) £32 — First find the gradient: (26 − 14) ÷ (50 − 20) = 12 ÷ 30 = £0.40 per minute. Using the point (20, 14), the charge for 65 minutes is 14 + 0.40 × (65 − 20) = 14 + 18 = £32. Choosing £26 comes from treating the charge as directly proportional to the time, multiplying the gradient by 65 minutes and ignoring the fixed part of the charge (0.40 × 65 = 26). Choosing £40 comes from treating £14 as if it were the charge at 0 minutes, then adding the gradient multiplied by the full 65 minutes (14 + 0.40 × 65 = 40), instead of multiplying by the extra time past 20 minutes. Choosing £33.80 comes from assuming the charge is directly proportional to the minutes already known, scaling up from the point (50, 26) in the ratio 65:50 (65 ÷ 50 × 26 = 33.80).
- (d) 5:3:2 — German = 100% − 50% − 30% = 20%. The ratio 50 : 30 : 20 simplifies by dividing every part by 10 to give 5 : 3 : 2.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
- (b) 16 — Method: substitute x into each equation separately, then subtract the smaller value from the larger. Working: y = 3 × 4 = 12 and z = 7 × 4 = 28, so the difference is 28 − 12 = 16. Answer: 16. The distractors: 4 comes from subtracting the constants, 7 − 3, which is the difference between the two gradients rather than the difference between the values at x = 4; 40 comes from adding the two values, 12 + 28, instead of subtracting them; 28 is the value of z on its own, given instead of being compared with the value of y.
- (c) 27 : 64 — For similar solids, the ratio of volumes is the ratio of lengths cubed: 3³ : 4³ = 27 : 64. 3 : 4 comes from using the height ratio itself as the volume ratio, without cubing it at all. 9 : 16 comes from squaring each part instead of cubing (3² : 4²) — squaring is the rule for area, not volume. 27 : 4 comes from cubing only the first part of the ratio (3³ = 27), and leaving the second part uncubed.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (a) 7 — The average rate of change of y with respect to x over an interval is the change in y divided by the change in x between its two endpoints — the gradient of the chord joining them, not a rate at a single point. At x = 1: 2 × 1 = 2, so y = 1 + 2 = 3. At x = 4: 2 × 4 = 8, so y = 16 + 8 = 24. The change in y is 24 − 3 = 21 and the change in x is 4 − 1 = 3, so the average rate of change is 21 ÷ 3 = 7. Reporting the change in y, 21, on its own is not a rate of change, because it has not been divided by the 3 units of x over which it happened. Reporting 3 is not a rate either — 3 is the width of the interval, and also the value of y at x = 1, and neither of those measures how fast y is changing. Subtracting in the wrong order gives −21 ÷ 3 = −7, the wrong sign. The average rate of change of y with respect to x over the interval is 7.
- (d) 19% — Method: write each decrease as a multiplier, multiply the multipliers, then compare the result with 100%. Working: a 10% decrease is a multiplier of 0.9, so the two reductions together give 0.9 × 0.9 = 0.81; the final price is 81% of the original, so the price has fallen by 100% − 81% = 19%. Answer: an overall decrease of 19%. The distractors: 20% comes from adding the two reductions, 10% + 10%, which charges the second 10% against the original price instead of against the already reduced price; 21% comes from using the increase multiplier by mistake, since 1.1 × 1.1 = 1.21, and reading that 21% as a decrease; 81% is the percentage of the original price still being paid, not the percentage taken off.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (c) 3 — Method: for a tangent written in the form y = mx + c, the coefficient m is the gradient of the line, and the gradient of the tangent at its point of contact equals the curve's instantaneous rate of change there. Working: y = 3x − 2 has gradient 3, so the instantaneous rate of change of y with respect to x at x = 4 is 3. Reading the constant term as the rate instead of the coefficient of x gives −2, but −2 is only where the tangent crosses the y-axis, not a rate. Reading the x-coordinate of the point of contact as the rate gives 4, but 4 only tells you where on the curve the tangent touches, not how fast y is changing there. Substituting x = 4 into the tangent equation, 3 × 4 − 2 = 10, gives the y-coordinate of the point of contact, not the rate; a candidate who works out the height of the point instead of the gradient gives 10. Whenever a tangent is given as an equation, the rate of change is always the coefficient of x — do not let the constant term, the x-value or a substituted y-value stand in for it.
- (c) 6.00 m — Method: the ratio of height to shadow length is the same for both objects. Working: road sign height ÷ shadow = 3 ÷ 5 = 0.6. Lamppost height = 0.6 × 10 = 6.00 m. Wrong options: 16.67 m comes from inverting the ratio, using shadow ÷ height instead of height ÷ shadow (10 × 5 ÷ 3); 8.00 m comes from adding the difference between the two shadow lengths to the road sign's height instead of scaling (3 + (10 − 5)); 1.50 m comes from multiplying by the ratio of the two shadow lengths the wrong way round (3 × 5 ÷ 10).
- (b) −1% — Method: write each change as a multiplier and multiply them. A 10% fall is × 0.9 and a 10% rise is × 1.1. Working: 0.9 × 1.1 = 0.99, so the final price is 99% of the original, which is 1% less. Answer: an overall change of −1%. The distractors: 0% comes from assuming a 10% fall and a 10% rise cancel — they do not, because the rise is 10% of a smaller amount; +1% has the size right but the sign wrong, from reading the multiplier 0.99 as 1% above 1 instead of 1% below it; −2% comes from finding the 1% fall and then counting it once for each of the two changes.
- (a) 8 cm — Method: a scale of 1 : n means the real distance is n times the distance on the map, so to go from the real distance back to the map distance, put both lengths in the same unit and then divide by the scale. Working: 1 km = 100 000 cm, so 8 km = 8 × 100 000 = 800 000 cm; 800 000 ÷ 100 000 = 8. Answer: 8 cm. The distractors: 800000 cm comes from converting the 8 km into centimetres and stopping there, so the division by the scale — the inverse operation the question asks for — is never done; 80 cm comes from taking a metre to be 1000 cm, which turns 8 km into 8 × 1000 × 1000 = 8 000 000 cm and gives 8 000 000 ÷ 100 000 = 80; 0.08 cm comes from taking a kilometre to be 1000 cm, which turns 8 km into 8000 cm and gives 8000 ÷ 100 000 = 0.08.
Build your own mix at the worksheet builder.