Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A jumper normally costs £45. In a sale it is reduced by 20%. Work out the sale price, then write the sale price as a fraction of the normal price. Give your answer in its simplest form.
- 2.A furniture designer makes a scale model of a wardrobe using a scale of 1 : 8. The real wardrobe is 2.4 m tall and 1.2 m wide. Work out the perimeter of the front face of the model wardrobe, in centimetres.
- 3.Cheng is paid an hourly rate that is proportional to the number of hours she works. She earns £52.50 for 7 hours. Work out how much she earns for 11 hours, assuming the same rate.
- 4.In a choir of 30 singers, 40% are altos and the rest are sopranos. Write the number of sopranos as a fraction of the number of altos. Give your answer in its simplest form.
- 5.A beaker holds 500 g of a salt solution of concentration 12%. Pure water is added until the concentration falls to 8%. Work out the mass of water added.
- 6.A cleaning solution is made by mixing disinfectant and water in the ratio 1 : 9. Priti wants to make 6 litres of the solution in total. Work out how much disinfectant she needs.
- 7.A rope of length A is 1.5 times as long as a rope of length B. Write the ratio A : B in its simplest form.
- 8.A post 2 metres tall casts a shadow 3 metres long. At the same time a nearby tree casts a shadow 12 metres long. Work out the height of the tree.
- 9.A tank is filled at a rate of 3 litres every 2 minutes. Given that 1 litre = 1000 cm³, work out the flow rate in cm³ per minute.
- 10.y is inversely proportional to x, so y = k ÷ x. When x = 5, the value of y is 8. Work out the value of k.
- 11.Two mathematically similar logos are printed on a poster. They have areas 20 cm² and 45 cm². Nadia says that the length scale factor from the smaller logo to the larger logo is 45 ÷ 20 = 2.25. Give a reason why Nadia is incorrect, and work out the correct length scale factor.
- 12.A recipe for pastry uses flour and butter in the ratio 3:2. A baker has 180 g of butter and wants to make pastry using all of it. Work out the total mass of pastry the baker can make.
- 13.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
- 14.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 15.A toy manufacturer makes a model aircraft that is mathematically similar to the real aircraft, at a scale of 1 : 48. The wingspan of the model is 15 cm. Work out the wingspan of the real aircraft, giving your answer in metres.
Answer key
- (c) 4/5 — Find 20% of £45: 10% is £4.50, so 20% is £9. The sale price is £45 − £9 = £36. Form the fraction 36/45; both numbers share a factor of 9, so 36 ÷ 9 = 4 and 45 ÷ 9 = 5, giving 4/5. 1/5 comes from writing the discount itself as a fraction of the normal price (9/45), instead of the sale price. 6/5 comes from adding the 20% instead of subtracting it, giving a sale price of £54, then 54/45 = 6/5. 5/9 comes from treating 'reduced by 20%' as 'reduced by £20', giving a sale price of £25, then 25/45 = 5/9.
- (d) 90 cm — Method: scale each dimension by the scale factor, then find the perimeter. Working: model height = 240 ÷ 8 = 30 cm; model width = 120 ÷ 8 = 15 cm. Perimeter = 2 × (30 + 15) = 90 cm. Wrong options: 11.25 cm comes from squaring the scale factor as if finding an area (720 ÷ 64); 510 cm comes from scaling only one dimension and leaving the other at full size; 720 cm comes from finding the real perimeter (2 × (240 + 120)) but forgetting to scale it down at all.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
- (d) 3/2 — Work out the number of altos: 40% of 30 = 12. The rest are sopranos, so there are 30 − 12 = 18 sopranos. Form the fraction 18/12; both numbers share a factor of 6, so 18 ÷ 6 = 3 and 12 ÷ 6 = 2, giving 3/2. 2/3 comes from writing the fraction the wrong way round, as altos over sopranos (12/18). 3/5 comes from comparing the sopranos with the whole choir (18/30), instead of with the altos. 7/3 comes from miscalculating 30 − 12 as 28 instead of 18, then forming 28/12.
- (b) 250 g — Method: adding water changes the total mass but not the mass of salt, so find the salt, hold it fixed, use the new ratio to find the new total mass and subtract the mass already in the beaker. Working: 12:100 = x:500 gives 12 ÷ 100 × 500 = 60 g of salt; that 60 g must be 8% of the new mixture, so 8:100 = 60:y gives y = 60 ÷ 8 × 100 = 750 g; the water added is 750 − 500 = 250 g. Answer: 250 g. The distractors: 750 g is the mass of the diluted solution, given without taking away the 500 g that was in the beaker to start with; 60 g is the mass of salt, the quantity that stays the same, given instead of the mass of water; 20 g comes from treating the fall from 12% to 8% as 4% of the original 500 g, which measures a change in concentration as though it were a mass of water.
- (a) 0.6 litres — The ratio 1 : 9 means the solution has 1 + 9 = 10 equal parts in total. Each part is 6 ÷ 10 = 0.6 litres, and disinfectant is 1 part, so Priti needs 0.6 litres of disinfectant. Giving 0.667 litres divides by 9, the number of parts of water, instead of the total number of parts, 10 (6 ÷ 9 ≈ 0.667). Giving 6 litres is the total amount of solution, not just the disinfectant's share of it. Giving 5.4 litres works out the water's share (6 × 9 ÷ 10 = 5.4), not the disinfectant's.
- (c) 3 : 2 — Method: 'A is k times B' means that if B is taken as 1 part then A is k parts, and a ratio in its simplest form is written with whole numbers that have no common factor. Working: taking B as 1, A is 1.5, so A : B = 1.5 : 1; multiplying both parts by 2 clears the decimal and gives 3 : 2, and 3 and 2 share no factor. Answer: 3 : 2. The distractors: 2 : 3 comes from writing B before A, reversing the order the question asks for; 1.5 : 1 is the right relationship but is not in its simplest form, because a ratio in its simplest form uses whole numbers; 3 : 5 comes from comparing A with the combined length rather than with B, since A : (A + B) = 1.5 : 2.5 = 3 : 5.
- (c) 8 m — Method: in the same sunlight every object has its height and its shadow in the same ratio, so write 2:3 = h:12, find the multiplier that takes 3 to 12 and apply it to the height. Working: 12 ÷ 3 = 4, so the tree's shadow is 4 times the post's shadow; the height must be scaled by the same 4, giving 4 × 2 = 8 m. Answer: 8 m. The distractors: 18 m comes from setting up the proportion upside down, 12 ÷ 2 × 3, which scales by shadow over height instead of height over shadow; 24 m comes from multiplying the 12 m shadow by the post's height of 2 m and never dividing by the post's shadow of 3 m; 4 m is the scale factor 12 ÷ 3, given as a length instead of being used to scale the 2 m post.
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (d) 40 — Substitute x = 5 and y = 8 into y = k ÷ x to get 8 = k ÷ 5, so k = 8 × 5 = 40. Getting 13 comes from adding the two numbers (5 + 8) instead of multiplying. Getting 1.6 comes from dividing 8 by 5 instead of multiplying. Getting 3 comes from subtracting the two numbers (8 − 5) instead of multiplying.
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (c) 450 g — Method: use the amount of butter given to find the value of one part of the ratio, then find the mass of flour, and finally add flour and butter to get the total. Working: 180 g of butter is 2 parts, so one part is 180 ÷ 2 = 90 g. The flour is 3 parts, so 3 × 90 = 270 g, and the total mass is 270 + 180 = 450 g. So the baker can make 450 g of pastry. Distractor 270 g is only the mass of flour, forgetting to add the butter back on. Distractor 300 g comes from treating the 180 g as 3 parts instead of 2, swapping which ratio number matches the butter. Distractor 540 g comes from multiplying 180 by 3 directly instead of first finding the value of one part.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) 7.2 m — Multiply the model wingspan by the scale factor: 15 × 48 = 720. This is in centimetres, and 720 cm = 7.2 m, since 1 m = 100 cm. Giving 0.31 m divides by the scale factor instead of multiplying (15 ÷ 48 ≈ 0.31), scaling the model down rather than the real aircraft up. Giving 72 m converts centimetres to metres by dividing by 10 instead of 100. Giving 0.72 m converts by dividing by 1000 instead of 100.
Build your own mix at the worksheet builder.