Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The rent on a flat increases by 10% one year and by a further 10% the following year. Work out the overall percentage increase over the two years.
- 2.A shop's profit, P pounds, is in direct proportion to the number of items sold, n. When 15 items are sold, the profit is £45. Write down the ratio n : P in its simplest form for this shop.
- 3.A straight-line graph shows the cost, C pounds, of hiring a bike for h hours. The line passes through the points (1, 12) and (4, 27). Which of these statements about the line is true?
- 4.A box holds 60 crayons. 25 of the crayons are broken and the rest are unbroken. Write the number of unbroken crayons as a fraction of the number of broken crayons. Give your answer in its simplest form.
- 5.To make orange paint, red and yellow paint are mixed in the ratio 6:15. Write the amount of red paint as a fraction of the amount of yellow paint, in its simplest form.
- 6.A laptop priced at £520 is first increased by 15%, and then the new price is decreased by 20%. Work out the final price of the laptop.
- 7.The price of a cycling helmet rises from £80 to £116. Work out the percentage increase.
- 8.Simplify the ratio 12 : 18 : 30 to its simplest form.
- 9.A force of 250 N acts on an area of 0.5 m². Using pressure = force ÷ area, work out the pressure, in pascals.
- 10.Two mathematically similar cylinders have heights in the ratio 3 : 4. Write the ratio of their volumes in its simplest form.
- 11.y is inversely proportional to x, so y = k ÷ x. When x = 5, the value of y is 8. Work out the value of k.
- 12.In a class, 50% of the students study French, 30% study Spanish and the rest study German. Write down the ratio of French : Spanish : German students, in its simplest form.
- 13.A rectangular garden has its length and width in the ratio 5:3. Given that the perimeter of the garden is 64 m, work out the width of the garden.
- 14.A cyclist's speed, in metres per second, is plotted against time, in seconds, since she sets off. Which statement correctly pairs the gradient of a tangent to this graph, and the area between the graph and the time-axis, with what each one represents?
- 15.It takes 2 identical pumps 10 hours to empty a flooded basement. Working at the same rate, work out how many hours 5 of these pumps would take to empty the same basement.
Answer key
- (c) 21% — Method: an increase of 10% is a multiplier of 1.1, and two successive increases are found by multiplying the multipliers. Working: 1.1 × 1.1 = 1.21, so the rent is 121% of the original, which is an increase of 21%. Answer: 21%. The distractors: 20% comes from adding the two percentages, which ignores that the second 10% is taken of a larger amount; 121% is the multiplier written as the change rather than the change itself; 11% comes from slipping in the multiplication and getting 1.11 instead of 1.21.
- (c) 1 : 3 — n : P = 15 : 45. Dividing both parts by their highest common factor, 15, gives 1 : 3. Inverting the ratio, 3 : 1, swaps profit and number of items. Dividing only the n-part by 15, getting 1, but leaving the P-part as 45 gives 1 : 45 — only one side has been simplified. Dividing only the P-part by 15, getting 3, but leaving the n-part as 15 gives 15 : 3, the opposite partial mistake.
- (a) The hourly rate is £5 and the fixed fee is £7 — The gradient is (27 − 12) ÷ (4 − 1) = 15 ÷ 3 = £5, the hourly rate. Using the point (1, 12): 12 = 5 × 1 + fee, so the fee is 12 − 5 = £7. That gives 'The hourly rate is £5 and the fixed fee is £7'. Swapping the two figures gives the statement with £7 as the rate and £5 as the fee, which has them the wrong way round. Taking the C-value of the first point, £12, as the fixed fee ignores that 1 hour of hire is already included in that £12. Using 15, the change in C, as the hourly rate without dividing by the change in h (3 hours) gives the statement claiming a £15 hourly rate.
- (d) 7/5 — The number of unbroken crayons is 60 − 25 = 35. The comparison is with the broken crayons, so the broken crayons are the denominator: 35/25. Both parts divide by 5: 35 ÷ 5 = 7 and 25 ÷ 5 = 5. The fraction is 7/5, which is greater than 1 because there are more unbroken crayons than broken ones.
- (b) 2/5 — The ratio red : yellow is 6:15, so write red over yellow: 6/15. Divide both numbers by their highest common factor, 3: 6÷3 = 2, 15÷3 = 5, giving 2/5. (5/2 comes from writing the ratio the wrong way round, yellow over red, 15/6, which simplifies to 5/2. 2/7 comes from comparing the red paint to the total amount of paint, 6 parts out of 21. 5/7 comes from comparing the yellow paint to the total amount of paint, 15 parts out of 21.)
- (c) £478.40 — Method: apply the percentage increase, then apply the percentage decrease to the new price. Working: after the increase, the laptop costs £520 × 1.15. Multiplying this result by 0.80 gives the final price, £478.40. Answer: £478.40. £494 comes from combining the two percentages into a single net change (15% − 20% = −5%) and applying it directly, £520 × 0.95 = £494, instead of applying the two changes one after the other. £416 comes from applying only the 20% decrease to the original price, £520 × 0.80 = £416, forgetting the increase entirely. £598 comes from applying only the 15% increase and stopping there, forgetting to apply the decrease at all.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.
- (d) 2:3:5 — The highest common factor of 12, 18 and 30 is 6. Divide every part by 6: 12 ÷ 6 = 2, 18 ÷ 6 = 3, 30 ÷ 6 = 5, giving 2 : 3 : 5. Dividing by 2 instead of 6 gives 6 : 9 : 15, which still shares a common factor of 3, so it is not fully simplified. Dividing by 3 instead of 6 gives 4 : 6 : 10, which still shares a common factor of 2, so it is not fully simplified either. Swapping the first two parts gives 3 : 2 : 5, the parts in the wrong order.
- (c) 500 — Pressure = force ÷ area = 250 ÷ 0.5 = 500 pascals. Getting 125 comes from multiplying the force by the area instead of dividing (250 × 0.5 = 125). Getting 249.5 comes from subtracting the area from the force instead of dividing. Getting 50 comes from misreading the area as 5 m² instead of 0.5 m² and dividing 250 by 5.
- (c) 27 : 64 — For similar solids, the ratio of volumes is the ratio of lengths cubed: 3³ : 4³ = 27 : 64. 3 : 4 comes from using the height ratio itself as the volume ratio, without cubing it at all. 9 : 16 comes from squaring each part instead of cubing (3² : 4²) — squaring is the rule for area, not volume. 27 : 4 comes from cubing only the first part of the ratio (3³ = 27), and leaving the second part uncubed.
- (d) 40 — Substitute x = 5 and y = 8 into y = k ÷ x to get 8 = k ÷ 5, so k = 8 × 5 = 40. Getting 13 comes from adding the two numbers (5 + 8) instead of multiplying. Getting 1.6 comes from dividing 8 by 5 instead of multiplying. Getting 3 comes from subtracting the two numbers (8 − 5) instead of multiplying.
- (d) 5:3:2 — German = 100% − 50% − 30% = 20%. The ratio 50 : 30 : 20 simplifies by dividing every part by 10 to give 5 : 3 : 2.
- (c) 12 m — Method: the perimeter of a rectangle is twice the sum of the length and the width, so half the perimeter is one length plus one width; split that half using the ratio. Working: half of 64 is 64 ÷ 2 = 32 m, the ratio 5:3 has 5 + 3 = 8 parts, so one part is 32 ÷ 8 = 4 m, and the width is 3 × 4 = 12 m. So the width is 12 m. Distractor 20 m is the length, 5 parts, not the width. Distractor 24 m comes from splitting the whole perimeter, 64 m, into 8 parts and multiplying by 3, forgetting to halve the perimeter first. Distractor 8 m comes from the same slip stopped one step earlier: splitting the whole perimeter into 8 parts, 64 ÷ 8 = 8, and giving that instead of the width.
- (d) Gradient = acceleration; area = distance travelled. — Method: on a speed–time graph, the gradient of the graph at an instant is the rate of change of speed with time, which is acceleration; the area between the graph and the time-axis over an interval is the total distance covered in that interval, because it accumulates speed × time. Working: gradient = acceleration and area = distance travelled is the correct pairing. Swapping the two quantities completely, gradient = distance travelled and area = acceleration, is the reverse of what each actually measures. Keeping gradient = acceleration correct but then also claiming area = acceleration too is wrong because the area is a different physical quantity, distance, not a second way of finding the same rate. Claiming the gradient itself gives the speed confuses the RATE OF CHANGE of the plotted quantity with the plotted quantity itself — the gradient is how fast the speed is changing, not the speed. On any rate graph, the gradient of the graph is always the RATE at that instant, and the area under the graph is always the TOTAL AMOUNT accumulated — keep straight which of the two questions each one answers.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
Build your own mix at the worksheet builder.