Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The density of a liquid is 0.92 g/cm³. Work out the density of the liquid in kg/m³.
- 2.A hiker's distance from the start of the trail, in kilometres, is plotted against time, in minutes, since she set off. At t = 45 minutes she stops to rest, so her distance from the start is neither increasing nor decreasing at that instant. Which statement about the tangent to the distance–time graph at t = 45 minutes is correct?
- 3.40% of a number is 12 more than 25% of the same number. Work out the number.
- 4.A metal has a density of 7.8 g/cm³. Work out the density of the metal in kg/m³.
- 5.The value of a delivery van, in £, is plotted against its age, in years, since it was bought. At age 2 years, the gradient of the tangent to the graph is −950. What does this tell you about the van at age 2 years?
- 6.A car is bought for £12000. Its value falls by 15% in the first year and by 10% in each year after that. Work out the value of the car 3 years after it was bought.
- 7.A metal alloy is made from copper and tin in the ratio 7:3. Work out the mass of tin in 250 g of the alloy.
- 8.A science technician mixes 400 g of a salt solution of concentration 5% with 100 g of a salt solution of concentration 25%. Work out the concentration of the mixture.
- 9.Two mathematically similar hexagonal tiles have areas 18 cm² and 50 cm². Work out the ratio of the side length of the smaller tile to the side length of the larger tile, in simplest form.
- 10.In a class, 50% of the students study French, 30% study Spanish and the rest study German. Write down the ratio of French : Spanish : German students, in its simplest form.
- 11.A shop's daily profit, in pounds, is plotted against the price charged for an item, in pounds. A tangent to the profit graph at a price of £15 passes through the points (12, 540) and (18, 480). Work out the instantaneous rate of change of profit with respect to price at £15, and state whether profit is increasing or decreasing there.
- 12.Two hikers' journeys are shown on separate distance-time graphs. Hiker A's graph has gradient 4.5 km/h. Hiker B's graph has gradient 3.2 km/h. Work out how much faster Hiker A walks than Hiker B, in km/h.
- 13.Write 350 ml : 1.4 l as a ratio in its simplest form.
- 14.A stall sells bottles of juice. Two bottles cost £3.00, five bottles cost £7.50 and eight bottles cost £12.00. The cost, C pounds, is in a fixed ratio to the number of bottles, n. Write down a formula for C in terms of n.
- 15.Ffion is paid £11.20 per hour. She works 6 hours on Monday and 4.5 hours on Tuesday. Work out her total pay for the two days.
Answer key
- (c) 920 kg/m³ — Convert each unit in turn. Mass: 1 g = 0.001 kg. Volume: 1 m³ = 100 × 100 × 100 = 1 000 000 cm³. So a density of 0.92 g per cm³ is 0.92 × 1 000 000 = 920 000 g in every cubic metre, and 920 000 g = 920 000 × 0.001 = 920 kg. The two conversions leave a single factor of 1 000 000 × 0.001 = 1000, so in one step multiply g/cm³ by 1000: 0.92 × 1000 = 920 kg/m³. Multiplying by 100 instead of 1000 gives 92 kg/m³, using the factor for 1 m² rather than 1 m³ of volume. Multiplying by 10 instead of 1000 gives 9.2 kg/m³, moving the decimal point one place for a conversion that moves it three. Dividing by 1000 instead of multiplying gives 0.00092 kg/m³, going the wrong way between the units — a kilogram is heavier than a gram, but a cubic metre is a million times bigger than a cubic centimetre, so the number must get larger, not smaller. The liquid's density is 920 kg/m³.
- (c) The tangent is horizontal, so its gradient is 0. — Method: at any point where a distance–time graph is momentarily neither increasing nor decreasing, the tangent to the graph at that point is horizontal, and the gradient of a horizontal line is 0 — this is the instantaneous rate of change at that instant. Working: since the hiker's distance is neither increasing nor decreasing at t = 45 minutes, the tangent there is horizontal, so its gradient is 0. Claiming the tangent is vertical, with an undefined gradient, is the opposite of what the stem says: a vertical tangent would mean the distance was changing infinitely fast at that instant, not that it had stopped changing, and on a distance–time graph it cannot happen at all. Reading the gradient as 45, the time value given in the stem, mistakes a value used to LOCATE the point for the rate of change AT that point. Claiming the gradient cannot be found without also knowing the distance at t = 45 minutes overlooks that 'momentarily stationary' already tells you the rate of change directly, without needing to read any distance value at all. Whenever a stem tells you a quantity is momentarily not changing, that is telling you the instantaneous rate of change directly — it is 0, and no further data is needed to find it.
- (b) 80 — Method: the difference between 40% and 25% of the number is 15% of the number, and that difference is 12. Working: 15% of the number is 12, so 1% of the number is 12 ÷ 15 = 0.8, and the number is 0.8 × 100 = 80. Check: 40% of 80 is 32, 25% of 80 is 20, and 32 − 20 = 12. Answer: 80. The distractors: 30 comes from solving 40% of the number = 12; 48 comes from solving 25% of the number = 12; 15 is the percentage difference written as the answer.
- (c) 7800 kg/m³ — Method: build the conversion factor from the two unit changes separately — one for the mass, one for the volume. Working: 1 kg = 1000 g, so the mass figure is divided by 1000; 1 m = 100 cm, so 1 m³ = 100 × 100 × 100 = 1000000 cm³ and the volume figure is multiplied by 1000000. The density figure is therefore multiplied by 1000000 ÷ 1000 = 1000, giving 7.8 × 1000 = 7800. So the density of the metal is 7800 kg/m³. Distractor 780 kg/m³ comes from multiplying by 100 instead of 1000. Distractor 78000 kg/m³ comes from multiplying by 10000, an extra zero. Distractor 7.8 kg/m³ comes from not converting the units at all.
- (c) Falling at £950 per year — The gradient of a tangent on a value-age graph is a rate, in pounds per year, so −950 means the van's value is falling at £950 per year at that instant. Writing this as 950% per year mistakes a rate measured in pounds per year for a percentage — the units of a gradient come from the units on the two axes, £ and years, not from a percentage. Saying the value 'falls by £950 over the next year' treats the instantaneous rate at age 2 as if it stayed constant for a whole year, which finds an average future change, not the instantaneous rate at age 2 itself. Reading the sign the wrong way round gives 'rising at £950 per year', which would mean the van is gaining value. Always match the units of a gradient to the units on the two axes of the graph.
- (d) £8262 — A fall of 15% is a multiplier of 0.85 and a fall of 10% is a multiplier of 0.9, and each multiplier acts on the value at the start of its own year. After year 1: 12000 × 0.85 = 10200. After year 2: 10200 × 0.9 = 9180. After year 3: 9180 × 0.9 = 8262. The value 3 years after the car was bought is £8262. Adding the percentages to make a single fall of 35% would be wrong, because the later falls are taken from smaller values.
- (b) 75 g — Method: split the total mass into the number of parts shown by the ratio, then find the mass of tin. Working: the ratio 7:3 has 7 + 3 = 10 parts, so one part is 250 ÷ 10 = 25 g, and the mass of tin is 3 × 25 = 75 g. So the alloy contains 75 g of tin. Distractor 175 g is the mass of copper, not tin. Distractor 125 g comes from splitting the alloy into two equal halves, ignoring the ratio. Distractor 25 g is the value of one part, found correctly but never multiplied by 3.
- (c) 9% — Method: a percentage concentration is the ratio of salt to solution written per 100 g, so scale each concentration to the mass it belongs to, add the two masses of salt, then scale the ratio of salt to mixture back to a denominator of 100. Working: 5:100 = x:400 gives 5 ÷ 100 × 400 = 20 g of salt, and 25:100 = y:100 gives 25 g of salt; the mixture holds 20 + 25 = 45 g of salt in 400 + 100 = 500 g of solution; 45:500 = 9:100. Answer: 9%. The distractors: 15% is the mean of 5% and 25%, which would only be right if the two masses were equal, and here one is four times the other; 21% comes from attaching the concentrations to the wrong masses, working out (400 × 25% + 100 × 5%) ÷ 500; 0.9% comes from working out 45 ÷ 500 = 0.09 and then moving the decimal point one place instead of two when writing the decimal as a percentage.
- (d) 3 : 5 — Simplify the area ratio: 18 : 50 divides by 2 to give 9 : 25. Areas scale with the square of the length ratio, so take the square root of each part: the square root of 9 is 3, and the square root of 25 is 5, giving a side length ratio of 3 : 5. Giving 5 : 3 has the ratio the right way round for larger to smaller, not smaller to larger. Giving 9 : 25 is the simplified area ratio, without square-rooting it. Giving 18 : 50 is the area ratio before it has even been simplified.
- (d) 5:3:2 — German = 100% − 50% − 30% = 20%. The ratio 50 : 30 : 20 simplifies by dividing every part by 10 to give 5 : 3 : 2.
- (d) Profit is decreasing by £10 per £1 rise in price. — The gradient of a tangent gives the instantaneous rate of change of profit with respect to price, found from the change in profit divided by the change in price between two points on the tangent. Here the tangent passes through (12, 540) and (18, 480), so the change in profit is 480 − 540 = −60 and the change in price is 18 − 12 = 6. The gradient is −60 ÷ 6 = −10. A negative gradient means profit is decreasing as price increases, so profit is decreasing at an instantaneous rate of £10 for every £1 rise in price. Subtracting the profits in the wrong order, 540 − 480 = 60, and dividing by the same change in price, 60 ÷ 6 = 10, gives a positive value and the wrong direction — profit is not increasing at £15. Stopping after finding only the change in profit, 480 − 540 = −60, without dividing by the change in price, is not a rate at all. Reading off the change in price, 6, and calling it the rate gives £6 per £1 rise in price, but 6 is only the width of the price interval — it is not a change in profit at all, and profit falls across that interval, so the direction is wrong too. The instantaneous rate of change of profit with respect to price at £15 is a decrease of £10 per £1 rise in price.
- (a) 1.3 — The gradient of a distance-time graph gives the speed. Difference in speed = 4.5 − 3.2 = 1.3 km/h. A student who subtracts the speeds the wrong way round, 3.2 − 4.5, gets −1.3. A student who adds the two speeds instead of comparing them gets 7.7. A student who multiplies the two gradients gets 14.4.
- (d) 1:4 — Convert 1.4 l to millilitres: 1.4 l = 1400 ml. The ratio is 350 : 1400. Divide both parts by 350: 350 ÷ 350 = 1 and 1400 ÷ 350 = 4, giving 1 : 4. Misreading 1.4 l as 14 (moving the decimal point) gives 350 : 14, which simplifies to 25 : 1 — a very different, implausible ratio. Dividing by 175 instead of 350 gives 2 : 8, which still shares a common factor of 2, so it is not fully simplified. Swapping the order gives 4 : 1, litres to millilitres the wrong way round.
- (c) C = 1.5n — Method: a fixed ratio between C and n means C is always the same multiple of n, and that multiple is the cost of one bottle. Working: 3.00 ÷ 2 = 1.5, 7.50 ÷ 5 = 1.5 and 12.00 ÷ 8 = 1.5, so every bottle costs £1.50 and C = 1.5n. Answer: C = 1.5n. The distractors: C = n + 1 comes from subtracting on the first row, 3 − 2 = 1, and adding that difference instead of multiplying; it fits the first row and fails the other two, which is why three rows are given; C = 3n reads the £3.00 as the price of one bottle when it is the price of two; C = n/1.5 divides the number of bottles by the price of one bottle, which works out how many bottles a pound buys instead of what n bottles cost.
- (d) £117.60 — Add the hours worked over the two days: 6 + 4.5 = 10.5 hours. Multiply by the rate of pay: 10.5 × £11.20 = £117.60. (£67.20 is Monday's pay only. £50.40 is Tuesday's pay only. £106.40 comes from mistakenly adding the hours as 6 + 3.5 = 9.5 — misreading Tuesday's 4.5 hours as 3.5 — and then multiplying by £11.20.)
Build your own mix at the worksheet builder.