Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.y is directly proportional to x. When x = 4, y = 10. Work out the value of y when x = 6.
- 2.Which of these ratios is equivalent to 6 : 10 : 14?
- 3.y is directly proportional to x², and x is positive. When x = 4, y = 32. Construct the equation connecting x and y, then work out the value of x when y = 200.
- 4.A conversion graph between kilometres and miles passes through the origin and the point (50, 31), with the number of kilometres on the horizontal axis and the number of miles on the vertical axis. Work out the number of miles equivalent to 1 kilometre.
- 5.A cyclist rides 30 km in 1 hour 30 minutes. Work out the average speed of the cyclist in km/h.
- 6.A company's turnover this year is £180,000. Last year's turnover was £120,000. Write down this year's turnover as a percentage of last year's turnover.
- 7.It takes 8 painters 6 days to paint a fence. Working at the same rate, work out how many days 4 painters would take to paint the same fence.
- 8.2.4 kg of cheese costs £36. Work out the cost of 1.5 kg of the same cheese.
- 9.A tangent to a curve at the point where x = 3 passes through the points (1, 2) and (5, 14). A candidate says: "The gradient of the tangent at x = 3 is 3, because 14 − 2 = 12 and 12 ÷ 4 = 3." Which statement is correct?
- 10.A concrete mix is made from gravel and cement in the ratio 5 : 1 by mass. The mass of cement is c kg and the total mass of the mix is m kg. Write down a formula for m in terms of c.
- 11.A map has a scale of 1:25000. A road on the map is 6 cm long. Work out the real-life length of the road, giving your answer in kilometres.
- 12.3 builders put up a fence in 12 days. All the builders work at the same rate, so the number of days is inversely proportional to the number of builders. Work out how long 9 builders take to put up the same fence.
- 13.The total cost, in pounds, of manufacturing a batch of components is plotted against the number of components produced. A tangent to this graph at a particular point has gradient 3.60. What does the value 3.60 represent?
- 14.The height of a ball, in metres, above the ground is plotted against time, in seconds, after it is thrown. The tangent to the graph at t = 1.5 seconds has gradient 2. Which of these four statements about the ball at t = 1.5 seconds is correct?
- 15.A spring's extension is directly proportional to the force applied to it. A force of 5 N produces an extension of 12 mm. Work out the extension produced by a force of 20 N.
Answer key
- (b) 15 — Find the multiplier connecting y to x: 10 ÷ 4 = 2.5. Then apply it to the new value of x: 2.5 × 6 = 15. Working out 10 + (6 − 4) = 12 adds the change in x straight onto y instead of scaling proportionally. Working out 10 × 6 = 60 multiplies the given y-value by the new x-value directly, without finding the multiplier first. Writing 10 keeps y the same as before, not realising it must change with x. When x = 6, y = 15.
- (c) 9:15:21 — 6 : 10 : 14 simplifies to 3 : 5 : 7 (divide every part by 2). Multiplying every part of 3 : 5 : 7 by 3 gives 9 : 15 : 21, so 9 : 15 : 21 is equivalent to 6 : 10 : 14. Adding 2 to every part of 6 : 10 : 14 gives 8 : 12 : 16, which is not equivalent — ratios are equivalent when every part is multiplied by the same number, not when the same number is added to every part. Doubling only the first two parts, 6 × 2 = 12 and 10 × 2 = 20, but leaving the third part unchanged at 14, gives 12 : 20 : 14 — a scaling applied to two parts and not the third. Cancelling the first two parts correctly, 6 ÷ 2 = 3 and 10 ÷ 2 = 5, then treating the three numbers as a sequence and making the third part the sum of the first two, 3 + 5 = 8, gives 3 : 5 : 8 — the third part was never divided by 2 at all.
- (a) 10 — Since y is directly proportional to x², y = kx². Using x = 4, y = 32: 32 = k × 16, so k = 32 ÷ 16 = 2. The equation is y = 2x². When y = 200: x² = 200 ÷ 2 = 100, so x = 10, taking the positive root because the question states that x is positive. Stopping at x² = 100 without taking the square root leaves 100, not the value of x itself. Treating the relationship as if y were proportional to x itself gives k = 32 ÷ 4 = 8 and then x = 200 ÷ 8 = 25, which is a different relationship entirely. Multiplying by k instead of dividing when rearranging gives x² = 200 × 2 = 400 and x = 20, which is not this equation rearranged correctly. The value of x when y = 200 is 10.
- (a) 0.62 miles — The gradient of the line is the change in miles divided by the change in kilometres: 31 ÷ 50 = 0.62, so 1 kilometre converts to 0.62 miles. Dividing the wrong way round, 50 ÷ 31 = 1.612..., rounds to 1.61 miles — that finds how many kilometres are in 1 mile, not the reverse. Doubling the gradient, 1.24 miles, comes from using 62 ÷ 50 instead of 31 ÷ 50. Reading off the y-coordinate of the given point without dividing by the x-coordinate gives 31.00 miles, which is the number of miles for 50 kilometres, not for 1 kilometre.
- (d) 20 km/h — Method: average speed = total distance ÷ total time, with the time written in hours. Working: 1 hour 30 minutes = 1.5 hours, and 30 ÷ 1.5 = 20. Answer: 20 km/h. The distractors: 45 km/h comes from multiplying 30 by 1.5 instead of dividing; 15 km/h comes from dividing by 2, as if the ride had taken 2 hours; 30 km/h comes from dividing by the whole hour only and ignoring the extra 30 minutes.
- (c) 150% — Percentage = (180,000 ÷ 120,000) × 100 = 150%.
- (b) 12 days — This is inverse proportion: fewer painters take longer. Multiply the original numbers to find the total painter-days needed: 8 × 6 = 48 painter-days. Divide by the new number of painters: 48 ÷ 4 = 12 days. Working out 6 × 4 ÷ 8 = 3 days treats it as direct proportion, as if fewer painters needed less time. Stopping at 48 gives the total painter-days, not the number of days. Working out 6 + (8 − 4) = 10 days adds the change in the number of painters straight onto the number of days, treating painters and days as the same kind of quantity. 4 painters take 12 days.
- (c) £22.50 — Method: find the cost of 1 kg, then multiply by the mass wanted. Working: £36 ÷ 2.4 = £15 per kilogram, and 1.5 × £15 = £22.50. Answer: £22.50. The distractors: £15 is the price of 1 kg, which is the first step and not what the question asks for; £54 comes from multiplying the £36 by 1.5 without first reducing it to a price per kilogram; £57.60 comes from using the scale factor upside down, multiplying £36 by 2.4 ÷ 1.5 = 1.6 instead of by 1.5 ÷ 2.4.
- (a) The gradient is 3; the candidate's method is right. — The gradient of a tangent, like any straight line, is the change in y divided by the change in x between two points on it. Here the tangent passes through (1, 2) and (5, 14), so the change in y is 14 − 2 = 12 and the change in x is 5 − 1 = 4. The gradient is 12 ÷ 4 = 3, so the candidate's calculation is correct. Subtracting in the wrong order, (2 − 14) ÷ (5 − 1), gives −12 ÷ 4 = −3, the wrong sign. Adding the two changes instead of dividing them, 12 + 4 = 16, does not find a gradient at all. Dividing the change in x by the change in y instead of the other way round, 4 ÷ 12 = 1/3, inverts the calculation completely. Before accepting or rejecting a claimed gradient, always redo the calculation yourself in the same order — change in y over change in x — rather than trusting the arithmetic as given.
- (c) m = 6c — Method: the whole is the sum of the parts in the ratio, and the cement is 1 part, so one part weighs c kg. Working: the mix has 5 + 1 = 6 parts, each of mass c kg, so the total mass is 6 × c, giving m = 6c. Answer: m = 6c. The distractors: m = 5c uses the 5 gravel parts as the multiplier and forgets that the cement is in the mix too, so it gives the mass of the gravel and not the total; m = c + 5 comes from reading the ratio as '5 more than' and adding, which treats a number of parts as a mass in kilograms; m = c/6 turns the relationship upside down, as though the total were shared into the cement rather than the cement multiplied up to the total.
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
- (a) 4 days — Method: the fence is a fixed amount of work, so builders × days is constant; find that product and divide it by the new number of builders. Working: 3 × 12 = 36 builder-days of work, so with 9 builders the time is 36 ÷ 9 = 4 days. Answer: 4 days. The distractors: 6 days comes from halving the 12 days because there are more builders, rather than dividing by the factor of 3 by which the workforce has grown; 36 days is the constant product of builders and days, given as a number of days instead of being shared between the builders; 9 days comes from taking 3 days off the 12, treating three extra builders as three fewer days, which is additive rather than proportional.
- (d) £3.60 per component — The gradient of a cost-against-components graph has units of pounds per component, since cost is measured in pounds and the horizontal axis counts components. So 3.60 means it costs an extra £3.60 to produce one more component at that point. Calling it '£3.60 total cost' confuses the gradient, a rate, with the y-value on the graph, which is the total cost itself. Giving it as 3.60 components per pound swaps which axis is on top, giving the units of the reciprocal gradient, not the gradient itself. Turning 3.60 into a percentage invents a unit that has no basis in the graph's axes — a gradient here is a number of pounds, not a percentage. Always build the gradient's units from the two axes' own units, in the order y-axis over x-axis.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (c) 48 mm — Method: extension = k × force, where k = extension ÷ force. Working: k = 12 ÷ 5 = 2.4 mm per N. At 20 N: extension = 2.4 × 20 = 48 mm. Wrong options: 32 mm comes from adding the extension and force numbers instead of scaling (12 + 20); 3 mm comes from treating the relationship as inverse proportion (12 × 5 ÷ 20); 36 mm comes from using an incorrect scale factor of 3 between the forces instead of the correct factor of 4 (20 ÷ 5).
Build your own mix at the worksheet builder.