- 1.A shop's number of online orders is proportional to its number of in-store orders. Last month there were 45 in-store orders and 180 online orders. Write the ratio of online orders to in-store orders, in its simplest form.
- 2.y is directly proportional to x. When x = 8, y = 20. Work out the value of y when x = 12.
- 3.A worker is paid £13.20 per hour. Work out this rate of pay in pence per minute.
- 4.Two quantities x and y are in the ratio x : y = 2 : 5, and y = kx for a constant k. Work out the value of k.
- 5.Write 350 ml : 1.4 l as a ratio in its simplest form.
- 6.A map has a scale of 1:25000. A road on the map is 6 cm long. Work out the real-life length of the road, giving your answer in kilometres.
- 7.Two mathematically similar hexagonal tiles have areas 18 cm² and 50 cm². Work out the ratio of the side length of the smaller tile to the side length of the larger tile, in simplest form.
- 8.Aisha invests £3200 in Account A, which pays 5% compound interest each year. She also invests £3200 in Account B, which pays 3% simple interest each year. Work out how much more Account A is worth than Account B after 2 years.
- 9.A curve has equation y = 2x² + 5. Work out an estimate for the gradient of the curve at x = 3, using a chord between the points where x = 2 and x = 4.y = 2x² + 5
- 10.The height of a ball, in metres, above the ground is plotted against time, in seconds, after it is thrown. The tangent to the graph at t = 1.5 seconds has gradient 2. Which of these four statements about the ball at t = 1.5 seconds is correct?
- 11.Water flows into a tank at a constant rate. After 8 minutes the tank holds 200 litres. Write the ratio of time in minutes to volume in litres, in its simplest form.
- 12.A fruit squash is made by mixing squash and water. In a jug, 2/9 of the total volume is squash. A caterer makes up 4.5 litres of the squash mixture. Work out how many litres of squash are in the mixture.
- 13.The speed of a car is given by v = d ÷ t. A car travels 180 km in 3 hours. Work out the average speed of the car in km/h.
- 14.A market stall sells apples at a fixed price per kilogram. Priya buys 3 kg for £5.40. Write the ratio of the mass in kilograms to the cost in pounds, in its simplest form.
- 15.Cheng is paid an hourly rate that is proportional to the number of hours she works. She earns £52.50 for 7 hours. Work out how much she earns for 11 hours, assuming the same rate.
Answer key
- (d) 4:1 — Write the ratio online : in-store using the numbers in the question: 180 : 45. Divide both parts by their highest common factor, 45, to give 4 : 1. (1:4 comes from writing the ratio the wrong way round, in-store : online. 3:1 comes from subtracting the in-store orders from the online orders, 180 − 45 = 135, and comparing that to the in-store orders, 135:45, instead of dividing. 4:5 comes from comparing the online orders to the total number of orders, 180:225.)
- (c) 30 — Method: use y = kx and find k from the given pair of values, then substitute x = 12. Working: k = 20 ÷ 8 = 2.5, so y = 2.5 × 12 = 30. Answer: 30. 24 comes from treating the relationship as additive, adding the increase in x (12 − 8 = 4) straight onto y (20 + 4 = 24), instead of multiplying by k. 14.5 comes from finding k correctly (2.5) but then adding it to x instead of multiplying (12 + 2.5 = 14.5). 4.8 comes from finding k upside down, 8 ÷ 20 = 0.4, and multiplying by x: 12 × 0.4 = 4.8.
- (a) 22p — First convert the hourly rate to pence: £13.20 = 1320p. Then convert from per hour to per minute by dividing by 60, since there are 60 minutes in an hour: 1320 ÷ 60 = 22p per minute. Working out 1320 × 60 = 79200p multiplies by 60 instead of dividing, going the wrong way between per hour and per minute. Working out 13.20 × 10 = 132p converts pounds to pence using the wrong power of ten, and dividing that by 60 carries the error through to give 2.2p. Working out 13.20 × 100 = 1320p converts the currency correctly but stops there, leaving the rate as pence per hour rather than completing the second conversion to pence per minute. The rate of pay is 22p per minute.
- (c) 2.5 — x : y = 2 : 5 means that for every matching pair of values, y ÷ x = 5 ÷ 2 = 2.5. So y = 2.5x, and comparing with y = kx gives k = 2.5. Dividing the other way round, 2 ÷ 5 = 0.4, gives x in terms of y — that is the constant for x = 0.4y, not for y = kx. Taking the y-part of the ratio on its own, 5, reads one number off the ratio instead of dividing the y-part by the x-part; 5 would only be right if the x-part were 1. Subtracting the two parts, 5 − 2 = 3, treats the ratio as a difference, but a ratio compares two quantities by multiplication, not by subtraction. The constant is k = 2.5.
- (d) 1:4 — Convert 1.4 l to millilitres: 1.4 l = 1400 ml. The ratio is 350 : 1400. Divide both parts by 350: 350 ÷ 350 = 1 and 1400 ÷ 350 = 4, giving 1 : 4. Misreading 1.4 l as 14 (moving the decimal point) gives 350 : 14, which simplifies to 25 : 1 — a very different, implausible ratio. Dividing by 175 instead of 350 gives 2 : 8, which still shares a common factor of 2, so it is not fully simplified. Swapping the order gives 4 : 1, litres to millilitres the wrong way round.
- (b) 1.5 km — Multiply the map length by the scale factor: 6 × 25000 = 150000 cm. Convert to kilometres, using 100 cm = 1 m and 1000 m = 1 km, so 100000 cm = 1 km: 150000 ÷ 100000 = 1.5 km. (1500 km comes from converting only as far as metres, 150000 ÷ 100 = 1500 m, and then writing kilometres on the end. 15 km comes from dividing by 10000 instead of 100000. 0.15 km comes from dividing by 1000000 instead of 100000.)
- (d) 3 : 5 — Simplify the area ratio: 18 : 50 divides by 2 to give 9 : 25. Areas scale with the square of the length ratio, so take the square root of each part: the square root of 9 is 3, and the square root of 25 is 5, giving a side length ratio of 3 : 5. Giving 5 : 3 has the ratio the right way round for larger to smaller, not smaller to larger. Giving 9 : 25 is the simplified area ratio, without square-rooting it. Giving 18 : 50 is the area ratio before it has even been simplified.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (d) 12 — First find the y-values at the two ends of the chord. At x = 2, y = 2 × 2² + 5 = 2 × 4 + 5 = 8 + 5 = 13. At x = 4, y = 2 × 4² + 5 = 2 × 16 + 5 = 32 + 5 = 37. The gradient of the chord is the change in y divided by the change in x: 37 − 13 = 24, then 24 ÷ (4 − 2) = 24 ÷ 2 = 12. Stopping after finding the change in y and not dividing by the change in x gives 24, which is not a gradient at all. Inverting the fraction, change in x divided by change in y, gives 2 ÷ 24 ≈ 0.08. Averaging the two y-values instead of finding the change between them gives (13 + 37) ÷ 2 = 50 ÷ 2 = 25. A gradient is always change in y over change in x — never the other way round, and never a single y-value.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)
- (d) 1.00 litres — Squash is 2/9 of the mixture, so the squash volume is 4.5 × 2/9 = 1.00 litres. Using the water's fraction, 7/9, instead of squash's gives 4.5 × 7/9 = 3.50 litres — the volume of water, not squash. Dividing 4.5 by 9 but forgetting to multiply by the numerator 2 gives 4.5 ÷ 9 = 0.50 litres, which is only 1/9 of the mixture. Halving the total volume instead of applying the fraction 2/9 gives 4.5 ÷ 2 = 2.25 litres, which assumes the mixture is half squash.
- (d) 60 km/h — Method: use the formula v = d ÷ t with the distance and time given. Working: 180 ÷ 3 = 60 km/h. So the average speed is 60 km/h. Distractor 540 km/h comes from multiplying the distance and time instead of dividing. Distractor 90 km/h comes from dividing by 2 instead of 3. Distractor 18 km/h comes from dividing by 10 instead of 3, a decimal-point slip.
- (c) 5 : 9 — Write the ratio mass : cost = 3 : 5.4. Multiply both parts by 10 to clear the decimal: 30 : 54. Both numbers share a factor of 6, so 30 ÷ 6 = 5 and 54 ÷ 6 = 9, giving 5 : 9. 3 : 5 comes from ignoring the decimal point and treating £5.40 as £5. 9 : 5 comes from writing the ratio the wrong way round, cost to mass instead of mass to cost. 1 : 18 comes from multiplying only the cost by 10 instead of both parts, giving 3 : 54, and then cancelling that correctly to 1 : 18 — the cancelling is fine, but the ratio being cancelled is not the right one.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.