Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Non-calculator
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Two cars leave the same point at the same time and travel in opposite directions. One travels at 80 km/h and the other at 60 km/h. Work out how long it takes until the cars are 350 km apart.
- 2.A graph shows y plotted against x. The graph is a curve that gets closer to both axes but never touches them, and y decreases as x increases. Write down whether this graph could show direct proportion, inverse proportion, or neither.
- 3.A candle burns down at a constant rate. Its height, h cm, is plotted against time, t minutes, on a straight-line graph. The gradient of the line is −0.3. Which statement correctly describes what the gradient means?
- 4.y is directly proportional to √x. When x = 4, y = 8. Construct the equation connecting x and y, then work out the value of y when x = 9.
- 5.A crate exerts a force of 84 N on the floor through a base with an area of 2.4 m². Work out the pressure on the floor, in N/m².
- 6.Two mathematically similar rectangles have widths 5 cm and 10 cm. The perimeter of the smaller rectangle is 18 cm. Work out the perimeter of the larger rectangle.
- 7.A box holds 60 crayons. 25 of the crayons are broken and the rest are unbroken. Write the number of unbroken crayons as a fraction of the number of broken crayons. Give your answer in its simplest form.
- 8.A room is drawn on a plan with a scale of 1 : 200. On the plan the room has an area of 12 cm². Work out the real area of the room, in square metres.
- 9.A jumper normally costs £45. In a sale it is reduced by 20%. Work out the sale price, then write the sale price as a fraction of the normal price. Give your answer in its simplest form.
- 10.A map has a scale of 1 : 50 000. Two villages are 4 cm apart on the map. Work out the real distance between the villages, in kilometres.
- 11.To make orange paint, red and yellow paint are mixed in the ratio 6:15. Write the amount of red paint as a fraction of the amount of yellow paint, in its simplest form.
- 12.A garden centre has 90 rose bushes in stock. It receives a delivery that increases its stock of rose bushes by 20%. In the same week it sells 150 lavender bushes. Work out the new number of rose bushes, then write it as a fraction of the number of lavender bushes sold, giving your answer in its simplest form.
- 13.A sculptor makes two mathematically similar statues. The smaller statue is 20 cm tall and 80 ml of varnish covers its surface. The larger statue is 50 cm tall. Work out how much varnish is needed to cover the surface of the larger statue.
- 14.The length of ribbon A is 5/12 of the length of ribbon B. Write the length of ribbon B as a fraction of the length of ribbon A.
- 15.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
Answer key
- (b) 2.5 hours — Method: when two objects move in opposite directions the gap between them grows at the sum of their speeds, so divide the required gap by that combined rate. Working: 80 + 60 = 140 km of gap each hour, and 350 ÷ 140 = 2.5. Answer: 2.5 hours. The distractors: 17.5 hours comes from subtracting the speeds, 80 − 60 = 20, which is the rate for two cars travelling in the same direction; 5 hours comes from using the mean of the two speeds, 70 km/h, instead of their sum; 4.375 hours comes from dividing 350 by 80 and ignoring the second car altogether.
- (a) Inverse proportion — A curve that decreases and never touches either axis is the standard shape for inverse proportion, y = k/x. Direct proportion graphs are straight lines through the origin, which this is not, so it must be inverse proportion rather than neither.
- (d) The candle's height decreases by 0.3 cm every minute. — A negative gradient means the quantity on the vertical axis decreases as the quantity on the horizontal axis increases. The size of the gradient, 0.3, gives the amount of decrease per minute.
- (b) 12 — Since y is directly proportional to √x, y = k√x. Using x = 4, y = 8: √4 = 2, so 8 = k × 2, giving k = 8 ÷ 2 = 4. The equation is y = 4√x. When x = 9: √9 = 3, so y = 4 × 3 = 12. Treating the relationship as if y were proportional to x itself, rather than to √x, gives k = 8 ÷ 4 = 2 and then y = 2 × 9 = 18, which is a different relationship. Multiplying k by the new x-value instead of by its square root gives y = 4 × 9 = 36, skipping the square root altogether. Reporting √9 on its own, without multiplying by k, gives only 3, not the value of y. When x = 9, y = 12.
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (c) 36 cm — A perimeter is built from lengths, so it is multiplied by the length scale factor and not by the square of it. The scale factor from the smaller rectangle to the larger one is 10 ÷ 5 = 2. The larger perimeter is therefore 18 × 2 = 36 cm.
- (d) 7/5 — The number of unbroken crayons is 60 − 25 = 35. The comparison is with the broken crayons, so the broken crayons are the denominator: 35/25. Both parts divide by 5: 35 ÷ 5 = 7 and 25 ÷ 5 = 5. The fraction is 7/5, which is greater than 1 because there are more unbroken crayons than broken ones.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
- (c) 4/5 — Find 20% of £45: 10% is £4.50, so 20% is £9. The sale price is £45 − £9 = £36. Form the fraction 36/45; both numbers share a factor of 9, so 36 ÷ 9 = 4 and 45 ÷ 9 = 5, giving 4/5. 1/5 comes from writing the discount itself as a fraction of the normal price (9/45), instead of the sale price. 6/5 comes from adding the 20% instead of subtracting it, giving a sale price of £54, then 54/45 = 6/5. 5/9 comes from treating 'reduced by 20%' as 'reduced by £20', giving a sale price of £25, then 25/45 = 5/9.
- (a) 2 km — Method: multiply the map distance by the scale to get the real distance in centimetres, then convert centimetres to kilometres using 100 cm = 1 m and 1000 m = 1 km. Working: 4 × 50 000 = 200 000 cm; 200 000 ÷ 100 = 2000 m; 2000 ÷ 1000 = 2. Answer: 2 km. The distractors: 200 km comes from dividing the 200 000 cm by 1000 in a single step, as if a kilometre were 1000 cm rather than the 100 000 cm it is; 20 km comes from converting to metres correctly, 200 000 ÷ 100 = 2000 m, and then dividing those metres by 100 instead of by 1000; 0.2 km comes from dividing by 1000 to reach metres, as if a metre were 1000 cm, and then dividing by 1000 again, so 200 000 is divided by 1 000 000 altogether.
- (b) 2/5 — The ratio red : yellow is 6:15, so write red over yellow: 6/15. Divide both numbers by their highest common factor, 3: 6÷3 = 2, 15÷3 = 5, giving 2/5. (5/2 comes from writing the ratio the wrong way round, yellow over red, 15/6, which simplifies to 5/2. 2/7 comes from comparing the red paint to the total amount of paint, 6 parts out of 21. 5/7 comes from comparing the yellow paint to the total amount of paint, 15 parts out of 21.)
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (d) 500 ml — Varnish covers a surface, so the amount needed scales with the area scale factor, which is the square of the length scale factor. The length scale factor is 50 ÷ 20 = 2.5, so the area scale factor is 2.5 × 2.5 = 6.25. The varnish needed for the larger statue is 80 × 6.25 = 500 ml. Using 2.5 on its own would scale a length, not a surface.
- (a) 12/5 — If A is 5/12 of B, then B is the reciprocal of that fraction times A: flip 5/12 to get 12/5, so B is 12/5 of A. 5/12 comes from keeping the same fraction without flipping it, treating the relationship as if it works the same way in both directions. 7/12 comes from computing 1 − 5/12 = 7/12, which is not how a fraction reverses. 12/7 comes from subtracting 5 from 12 to get 7, and writing 12 over that, instead of swapping the numerator and denominator of 5/12.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
Build your own mix at the worksheet builder.