Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.y is inversely proportional to x². When x = 2, y = 8. Construct the equation connecting x and y, then work out the value of y when x = 4.
- 2.Write the ratio 2 : 1/4 as a ratio of whole numbers in its simplest form.
- 3.A tap fills a tank at a rate of 15 litres per minute. Given that 1 litre = 1000 cm³, work out the rate at which the tank fills in cm³ per second.
- 4.Two cars travel at constant speeds. Car A travels 150 km in 3 hours. Car B travels 180 km in 4 hours. Which car is faster, and what is its speed?
- 5.Two printers' running costs are shown on separate straight-line graphs of total cost against number of pages printed. Printer A's graph has gradient £0.04 per page. Printer B's graph has gradient £0.05 per page. Work out how much cheaper it is to print 200 pages on Printer A than on Printer B, based on these running costs alone.
- 6.The price of a cycling helmet rises from £80 to £116. Work out the percentage increase.
- 7.A curve has equation y = x² + 2x. Work out the average rate of change of y with respect to x over the interval from x = 1 to x = 4.y = x² + 2x
- 8.The number of members of a running club increases from 45 to 54. Work out the percentage increase.
- 9.Triangle ABC is mathematically similar to triangle PQR, with AB corresponding to PQ and BC corresponding to QR. AB = 6 cm, BC = 8 cm and PQ = 12 cm. Work out the length of QR.
- 10.Two mathematically similar tins have heights 8 cm and 12 cm. Jayden says that the volume of the larger tin is 1.5 times the volume of the smaller tin. Give a reason why Jayden is incorrect, and work out the correct volume scale factor.
- 11.A room is drawn on a plan with a scale of 1 : 200. On the plan the room has an area of 12 cm². Work out the real area of the room, in square metres.
- 12.The manufacturing cost of a specialist lens, in pounds, is proportional to the square root of its diameter, in millimetres. A lens of diameter 9 mm costs £12 to manufacture. Construct the equation connecting cost C and diameter d, then work out the cost of manufacturing a lens of diameter 16 mm.
- 13.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 14.A coach journey of 240 km takes 3 hours. For this fixed distance the average speed needed is inversely proportional to the time taken. Work out the average speed needed to complete the same journey in 2 hours.
- 15.It takes 2 identical pumps 10 hours to empty a flooded basement. Working at the same rate, work out how many hours 5 of these pumps would take to empty the same basement.
Answer key
- (a) 2 — Since y is inversely proportional to x², y = k/x². Using x = 2, y = 8: 2² = 4, so 8 = k ÷ 4, giving k = 8 × 4 = 32. The equation is y = 32/x². When x = 4: 4² = 16, so y = 32 ÷ 16 = 2. Treating the relationship as inversely proportional to x itself, rather than to x², gives k = 8 × 2 = 16 and then y = 16 ÷ 4 = 4, a different relationship. Using x instead of x² in the new calculation gives y = 32 ÷ 4 = 8, skipping the square. Multiplying by x² instead of dividing by it gives y = 32 × 16 = 512, the wrong operation for an inverse relationship. When x = 4, y = 2.
- (a) 8:1 — Multiply both parts of the ratio by 4 to clear the fraction: 2 × 4 = 8 and 1/4 × 4 = 1, giving 8 : 1. Getting 1 : 8 has the two parts the wrong way round. Getting 2 : 4 comes from writing down the denominator of the fraction (4) as the second part instead of multiplying through by it. Getting 8 : 4 comes from multiplying only the first part of the ratio by 4 and leaving the second part as the fraction's denominator.
- (d) 250 cm³/s — Method: first change litres per minute into cm³ per minute, then change per minute into per second. Working: 15 × 1000 = 15000 cm³ per minute, then 15000 ÷ 60 = 250 cm³ per second. So the tank fills at 250 cm³ per second. Distractor 15000 cm³/s comes from stopping after the first step and forgetting to change minutes into seconds. Distractor 900000 cm³/s comes from multiplying by 60 instead of dividing. Distractor 2500 cm³/s comes from dividing by 6 instead of 60.
- (b) Car A, 50 km/h — Method: speed = distance ÷ time for each car, then compare. Working: Car A = 150 ÷ 3 = 50 km/h. Car B = 180 ÷ 4 = 45 km/h. Since 50 > 45, Car A is faster, travelling at 50 km/h. Wrong options: Car B, 45 km/h correctly finds Car B's speed but wrongly names the slower car as faster; Car A, 45 km/h picks the correct car but uses Car B's speed by mistake; Car B, 50 km/h picks the wrong car but uses Car A's correct speed value.
- (d) £2.00 — Cost for Printer A = 200 × £0.04 = £8. Cost for Printer B = 200 × £0.05 = £10. Difference = £10 − £8 = £2.00.
- (a) 45% — Method: percentage increase = increase ÷ original amount × 100. Working: the increase is £116 − £80 = £36, and 36 ÷ 80 = 0.45, so 0.45 × 100 = 45%. Answer: 45%. The distractors: 36% comes from quoting the £36 increase as though pounds and per cent were the same thing; 31% comes from dividing the £36 increase by the new price £116 instead of by the original £80, which gives 31% to the nearest per cent; 145% is the new price written as a percentage of the original price, which is the whole of the new price rather than the increase.
- (a) 7 — The average rate of change of y with respect to x over an interval is the change in y divided by the change in x between its two endpoints — the gradient of the chord joining them, not a rate at a single point. At x = 1: 2 × 1 = 2, so y = 1 + 2 = 3. At x = 4: 2 × 4 = 8, so y = 16 + 8 = 24. The change in y is 24 − 3 = 21 and the change in x is 4 − 1 = 3, so the average rate of change is 21 ÷ 3 = 7. Reporting the change in y, 21, on its own is not a rate of change, because it has not been divided by the 3 units of x over which it happened. Reporting 3 is not a rate either — 3 is the width of the interval, and also the value of y at x = 1, and neither of those measures how fast y is changing. Subtracting in the wrong order gives −21 ÷ 3 = −7, the wrong sign. The average rate of change of y with respect to x over the interval is 7.
- (c) 20% — Method: percentage increase = (increase ÷ original) × 100. Working: the increase is 54 − 45 = 9, and 9 ÷ 45 = 0.2, so the percentage increase is 0.2 × 100 = 20. Answer: 20%. The distractors: 9% comes from writing the actual increase as a percentage; 16.7% comes from dividing by the new value 54 instead of the original 45; 120% is the multiplier 1.2 written as a change rather than the change itself.
- (c) 16 cm — Corresponding sides of similar triangles are all in the same ratio. Use the pair whose lengths are both known: the scale factor from triangle ABC to triangle PQR is 12 ÷ 6 = 2. Since QR corresponds to BC, multiply BC by that scale factor: 8 × 2 = 16, so QR = 16 cm.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (b) 48 m² — Method: lengths are multiplied by the scale factor, but areas are multiplied by its square. Working: 1 cm on the plan stands for 200 cm = 2 m, so 1 cm² on the plan stands for 2 × 2 = 4 m², and 12 × 4 = 48. Answer: 48 m². The distractors: 24 m² comes from scaling the area by the length factor 2 instead of by its square; 2400 m² comes from multiplying the area by the scale 200 as though it were a length; 4800 m² comes from working in centimetres, 12 × 200² = 480 000 cm², and then dividing by 100 instead of by 10 000 to reach square metres.
- (b) £16 — Since cost is proportional to the square root of diameter, C = k√d. Using d = 9, C = 12: √9 = 3, so 12 = k × 3, giving k = 12 ÷ 3 = 4. The equation is C = 4√d. When d = 16: √16 = 4, so C = 4 × 4 = 16. Halving the new diameter instead of taking its square root gives 16 ÷ 2 = 8, and then C = 4 × 8 = 32 — halving a number is not the same as taking its square root, as √16 = 4, not 8. Multiplying k by the diameter itself instead of by its square root gives C = 4 × 16 = 64, skipping the square root altogether. Reporting √16 on its own, without multiplying by k, gives only 4, not the cost. The cost of manufacturing a lens of diameter 16 mm is £16.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (c) 120 km/h — Method: for a fixed distance the average speed multiplied by the time is constant, and that constant is the distance, so divide the distance by the new time. Working: speed × time = 240, so in 2 hours the speed needed is 240 ÷ 2 = 120 km/h. Answer: 120 km/h. The distractors: 80 km/h is the average speed of the original journey, 240 ÷ 3, which answers for the 3-hour timing rather than the 2-hour one; 160 km/h comes from halving the 3 hours to 1.5 hours and working out 240 ÷ 1.5, instead of using the 2 hours the question gives; 480 km/h comes from multiplying the distance by the 2 hours rather than dividing by it.
- (a) 4 hours — This is inverse proportion: more pumps take less time. Multiply the original numbers to find the total pump-hours needed: 2 × 10 = 20 pump-hours. Divide by the new number of pumps: 20 ÷ 5 = 4 hours. Working out 10 × 5 ÷ 2 = 25 hours treats it as direct proportion, as if more pumps needed more time. Stopping at 20 gives the total pump-hours, not the number of hours. Working out 10 − (5 − 2) = 7 hours subtracts the extra number of pumps straight from the number of hours, treating pumps and hours as the same kind of quantity. 5 pumps take 4 hours.
Build your own mix at the worksheet builder.