Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.In one batch of shortbread, a bakery uses 240 g of butter and 160 g of sugar. Another batch, made in the same ratio, uses 90 g of sugar. Work out how much butter is needed for the second batch.
- 2.The price of a jacket increases by 50% and then decreases by 50%. Describe the overall change from the original price.
- 3.The height of water in a tank, h metres, t minutes after a tap is opened is modelled by h = 0.02t² + 0.5. Estimate the instantaneous rate of change of the height at t = 10, using the gradient of the chord joining t = 9 and t = 11.
- 4.y is directly proportional to √x. When x = 25, y = 20. Construct the equation connecting x and y, then work out the value of x when y = 32.
- 5.A garden centre has 90 rose bushes in stock. It receives a delivery that increases its stock of rose bushes by 20%. In the same week it sells 150 lavender bushes. Work out the new number of rose bushes, then write it as a fraction of the number of lavender bushes sold, giving your answer in its simplest form.
- 6.A car travels at a constant speed. It travels 150 miles in 3 hours. At the same speed, work out how far it travels in 5 hours.
- 7.To make a shade of green paint, the amount of yellow paint used is always 0.75 times the amount of blue paint used. Write the amount of blue paint as a fraction of the amount of yellow paint, in its simplest form.
- 8.The length of ribbon A is 5/12 of the length of ribbon B. Write the length of ribbon B as a fraction of the length of ribbon A.
- 9.A mortar mix is made from sand and cement in the ratio 5 : 3. Write the ratio of sand to the total mix in its simplest form.
- 10.y is inversely proportional to x, so y = k ÷ x. When x = 5, the value of y is 8. Work out the value of k.
- 11.A curve has equation y = 2x² + 5. Work out an estimate for the gradient of the curve at x = 3, using a chord between the points where x = 2 and x = 4.y = 2x² + 5
- 12.A map has a scale of 1 : 25 000. A footpath measures 6 cm on the map. Work out the real length of the footpath, in kilometres.
- 13.A metal alloy is made from copper and tin in the ratio 7:3. Work out the mass of tin in 250 g of the alloy.
- 14.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 15.The cost, in pounds, of hiring a minibus is modelled against the number of passengers booked. A tangent to the cost graph at 20 passengers passes through the points (16, 184) and (24, 216). Work out the instantaneous rate at which the cost increases with each extra passenger, at 20 passengers.
Answer key
- (c) 135 g — Find the ratio of butter to sugar in the first batch: 240:160, which simplifies to 3:2. For the second batch, sugar = 90 g, so butter = 90 × 3/2 = 135 g. (60 g comes from using the ratio the wrong way round, 90 × 2/3. 170 g comes from subtracting the drop in sugar, 160 − 90 = 70 g, from the original butter amount, 240 − 70, instead of scaling. 240 g comes from not scaling the butter amount at all.)
- (c) a decrease of 25% — Method: use multipliers. An increase of 50% is × 1.5 and a decrease of 50% is × 0.5. Working: 1.5 × 0.5 = 0.75, so the final price is 75% of the original. Answer: a decrease of 25%. The distractors: no change comes from assuming +50% and −50% cancel; a decrease of 50% comes from applying only the second change; an increase of 25% has the direction wrong.
- (d) 0.40 m/min — To estimate an instantaneous rate of change at a point without a diagram, use the gradient of a chord joining two points close to it, one on each side. At t = 9: 0.02 × 81 = 1.62, so h = 1.62 + 0.5 = 2.12. At t = 11: 0.02 × 121 = 2.42, so h = 2.42 + 0.5 = 2.92. The change in height is 2.92 − 2.12 = 0.80 and the change in time is 11 − 9 = 2, so the gradient of the chord is 0.80 ÷ 2 = 0.40. Reporting the change in height, 0.80, on its own is not a rate, because it has not been divided by the 2 minutes over which it happened. Using the chord from t = 0 (where h = 0.5) to t = 11 instead gives 2.92 − 0.5 = 2.42, and 2.42 ÷ 11 = 0.22, which is the average gradient over the whole 11 minutes, not the instantaneous rate at t = 10. Substituting t = 10 into the formula gives 0.02 × 100 + 0.5 = 2.50, which is the height of the water at that moment, not the rate at which the height is rising. The estimated instantaneous rate of change at t = 10 is 0.40 m/min.
- (d) 64 — Since y is directly proportional to √x, y = k√x. Using x = 25, y = 20: √25 = 5, so 20 = k × 5, giving k = 20 ÷ 5 = 4. The equation is y = 4√x. When y = 32: √x = 32 ÷ 4 = 8, and x = 8² = 64. Stopping at √x = 8 without squaring leaves the square root of x, not x itself. Treating the relationship as if y were proportional to x itself gives k = 20 ÷ 25 = 0.8 and then x = 32 ÷ 0.8 = 40, which is a different relationship entirely. Multiplying instead of dividing when isolating √x gives √x = 32 × 4 = 128, far too large to be a square root here. When y = 32, x = 64.
- (a) 18/25 — First find the new number of rose bushes: 90 × 1.2 = 108 (a 20% increase multiplies by 1.2). Then write 108 over 150 and divide top and bottom by 6 to get 18/25. Choosing 3/5 comes from using the original 90 rose bushes without applying the 20% increase (90/150 = 3/5). Choosing 25/18 comes from writing the number of lavender bushes over the new number of rose bushes, the wrong way round. Choosing 3/25 comes from multiplying 90 by 0.2 instead of 1.2, finding only the increase (18) rather than the new total, then writing 18/150 = 3/25.
- (c) 250 miles — Find the distance travelled in 1 hour: 150 ÷ 3 = 50 miles. Multiply by 5 hours: 50 × 5 = 250 miles. Giving 300 miles doubles the original distance (150 × 2 = 300) using a scale factor of 2 instead of the correct 5 ÷ 3. Giving 200 miles adds only one extra hour's distance, 50, instead of the two extra hours actually needed (150 + 50 = 200, rather than 150 + 100). Giving 90 miles divides by the scale factor instead of multiplying (150 × 3 ÷ 5 = 90).
- (d) 4/3 — The amount of yellow paint is 0.75 times the amount of blue paint. As a fraction, 0.75 = 3/4, so yellow = 3/4 of blue. To write blue as a fraction of yellow, use the reciprocal: flip 3/4 to get 4/3. 3/4 comes from keeping the original fraction without inverting it. 1/4 comes from computing 1 − 3/4 = 1/4, which is not how a fraction reverses. 40/3 comes from converting 0.75 to a fraction as 75/1000 = 3/40 (misplacing the decimal point), then inverting that.
- (a) 12/5 — If A is 5/12 of B, then B is the reciprocal of that fraction times A: flip 5/12 to get 12/5, so B is 12/5 of A. 5/12 comes from keeping the same fraction without flipping it, treating the relationship as if it works the same way in both directions. 7/12 comes from computing 1 − 5/12 = 7/12, which is not how a fraction reverses. 12/7 comes from subtracting 5 from 12 to get 7, and writing 12 over that, instead of swapping the numerator and denominator of 5/12.
- (b) 5:8 — The mix has 5 parts sand and 3 parts cement, so 5 + 3 = 8 parts in total. Sand to total is 5 : 8, and since the highest common factor of 5 and 8 is 1, this is already in its simplest form. Giving 5 : 3 answers sand to cement, not sand to the total mix. Giving 3 : 8 is cement to total, the wrong part of the mix. Giving 8 : 5 has the total and the sand swapped round.
- (d) 40 — Substitute x = 5 and y = 8 into y = k ÷ x to get 8 = k ÷ 5, so k = 8 × 5 = 40. Getting 13 comes from adding the two numbers (5 + 8) instead of multiplying. Getting 1.6 comes from dividing 8 by 5 instead of multiplying. Getting 3 comes from subtracting the two numbers (8 − 5) instead of multiplying.
- (d) 12 — First find the y-values at the two ends of the chord. At x = 2, y = 2 × 2² + 5 = 2 × 4 + 5 = 8 + 5 = 13. At x = 4, y = 2 × 4² + 5 = 2 × 16 + 5 = 32 + 5 = 37. The gradient of the chord is the change in y divided by the change in x: 37 − 13 = 24, then 24 ÷ (4 − 2) = 24 ÷ 2 = 12. Stopping after finding the change in y and not dividing by the change in x gives 24, which is not a gradient at all. Inverting the fraction, change in x divided by change in y, gives 2 ÷ 24 ≈ 0.08. Averaging the two y-values instead of finding the change between them gives (13 + 37) ÷ 2 = 50 ÷ 2 = 25. A gradient is always change in y over change in x — never the other way round, and never a single y-value.
- (a) 1.5 km — Multiply the map length by the scale: 6 × 25 000 = 150 000 cm. Convert to kilometres: 150 000 cm = 1.5 km. Dividing by only 1000 instead of the full conversion when changing units gives 150 km, a hundred times too large. Misreading the scale as 1 : 2500 instead of 1 : 25 000 gives 6 × 2500 = 15 000 cm = 0.15 km, a hundred times too small. Leaving the answer as 150 000 without converting units at all, and calling it 150 000 km, mistakes centimetres for kilometres completely.
- (b) 75 g — Method: split the total mass into the number of parts shown by the ratio, then find the mass of tin. Working: the ratio 7:3 has 7 + 3 = 10 parts, so one part is 250 ÷ 10 = 25 g, and the mass of tin is 3 × 25 = 75 g. So the alloy contains 75 g of tin. Distractor 175 g is the mass of copper, not tin. Distractor 125 g comes from splitting the alloy into two equal halves, ignoring the ratio. Distractor 25 g is the value of one part, found correctly but never multiplied by 3.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (d) £4 — The gradient of the tangent gives the instantaneous rate of change of cost with respect to the number of passengers, in pounds per passenger. The tangent passes through (16, 184) and (24, 216), so the change in cost is 216 − 184 = 32 and the change in passengers is 24 − 16 = 8. The gradient is 32 ÷ 8 = 4. Stopping after finding the change in cost, without dividing by the change in passengers, leaves 32, not a rate. Adding the two changes instead of dividing gives 32 + 8 = 40, which is not a rate either. Reading off only the change in passengers, 8, is not a rate at all — a rate needs the change in cost as well. The instantaneous rate is £4 per extra passenger.
Build your own mix at the worksheet builder.