- 1.Write 45 minutes : 2 hours as a ratio in its simplest form.
- 2.A sequence is defined by the iterative rule x_{n+1} = 0.5x_n + 20, with x_0 = 0. By working out x_1, x_2 and x_3, find the value that the sequence is approaching.
- 3.A coach journey is 372 miles in total. After a stop, the coach has travelled 217 miles. Write the distance still to travel as a fraction of the total journey. Give your answer in its simplest form.
- 4.A delivery driver travels 45 km in the first 30 minutes of a journey, and then a further 75 km in the next 1 hour. Work out her average speed for the whole journey, in km/h.
- 5.A company's turnover was £128 000 in 2023 and £176 000 in 2024. Work out the multiplier that changes the 2023 turnover into the 2024 turnover.
- 6.The height of a ball, in metres, above the ground is plotted against time, in seconds, after it is thrown. The tangent to the graph at t = 1.5 seconds has gradient 2. Which of these four statements about the ball at t = 1.5 seconds is correct?
- 7.A crate exerts a force of 84 N on the floor through a base with an area of 2.4 m². Work out the pressure on the floor, in N/m².
- 8.A laptop costs £800 when new. Its value decreases by 25% of its value at the start of each year. Work out how much value the laptop loses in the second year.
- 9.A firework rocket's height above the ground, in metres, t seconds after launch, is modelled by h = 30t − 5t². Use a chord between t = 1 second and t = 3 seconds to estimate the instantaneous rate of change of the height at t = 2 seconds, in m/s.
- 10.A 1.5 kg bag of pasta costs £2.85 and a 2.4 kg bag of the same pasta costs £4.32. Work out which bag gives better value for money.
- 11.Priya is paid £58.50 for working 7.5 hours on a Saturday. Work out her rate of pay, in £ per hour.
- 12.y is directly proportional to x. When x = 8, y = 20. Work out the value of y when x = 12.
- 13.A concrete mix is made from gravel and cement in the ratio 5 : 1 by mass. The mass of cement is c kg and the total mass of the mix is m kg. Write down a formula for m in terms of c.
- 14.A recipe for 8 people needs 320 g of rice. Sanjay scales the recipe down to serve 5 people, then wants to scale his new amount back up to serve 8 people again. Work out the multiplier he should use to scale his amount for 5 people back up to the amount for 8 people.
- 15.Water flows into a tank at a constant rate. After 8 minutes the tank holds 200 litres. Write the ratio of time in minutes to volume in litres, in its simplest form.
Answer key
- (d) 3:8 — Convert 2 hours to minutes: 2 hours = 120 minutes. The ratio is 45 : 120. The highest common factor of 45 and 120 is 15. Divide both parts by 15: 45 ÷ 15 = 3 and 120 ÷ 15 = 8, giving 3 : 8. Leaving the hours unconverted gives 45 : 2 — the units on each side are different, so this does not compare like with like. Dividing by 5 instead of 15 gives 9 : 24, which still shares a common factor of 3, so it is not fully simplified. Swapping the order gives 8 : 3, hours to minutes instead of minutes to hours.
- (c) 40 — Working out successive terms shows where the sequence is heading, but the terms themselves keep changing — the limit is the value where the sequence stops changing, so x_{n+1} = x_n = L there. Substituting into the rule: L = 0.5L + 20. Subtracting 0.5L from both sides: L − 0.5L = 20, so 0.5L = 20, and L = 20 ÷ 0.5 = 40. The individual terms are x_1 = 0.5 × 0 + 20 = 20, x_2 = 0.5 × 20 + 20 = 30 and x_3 = 0.5 × 30 + 20 = 35, getting closer to this value but not equal to it — 35 is only the third term, not the limit. Multiplying by 0.5 instead of dividing at the final step, 20 × 0.5 = 10, undoes the rearrangement rather than completing it, and gives a value smaller than terms the sequence has already passed. Writing the fixed-point equation with the wrong sign, L = 0.5L − 20, gives 0.5L = −20 and L = −40, which cannot be right since every term in the sequence is positive and increasing. The value the sequence is approaching is 40.
- (a) 5/12 — Work out the distance still to travel: 372 − 217 = 155 miles. Form the fraction 155/372; both numbers share a factor of 31, so 155 ÷ 31 = 5 and 372 ÷ 31 = 12, giving 5/12. 7/12 comes from writing the distance already travelled as the fraction of the journey (217/372 = 7/12), instead of the distance still to travel. 145/372 comes from miscalculating 372 − 217 as 145 instead of 155. 5/7 comes from comparing the remaining distance with the distance already travelled (155/217 = 5/7), instead of with the total journey.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (a) 1.375 — The multiplier is the new value divided by the original value: 176 000 ÷ 128 000 = 1.375. Choosing 0.375 comes from working out the increase as a fraction of the original (48 000 ÷ 128 000 = 0.375) and stopping there, without adding on the 1 whole that represents the original turnover. Choosing 0.727 comes from dividing the 2023 turnover by the 2024 turnover, the wrong way round (128 000 ÷ 176 000, rounded to 3 decimal places). Choosing 137.5 comes from writing the multiplier as a percentage — the 2024 turnover is 137.5% of the 2023 turnover — instead of converting it to the decimal multiplier 1.375.
- (c) Height rising at 2 m/s at t = 1.5 s — A tangent's gradient on a height-time graph is the instantaneous rate of change of height, in metres per second, so gradient 2 means the ball's height is increasing at 2 m/s at t = 1.5 s. Saying the height 'is 2 m' confuses the gradient, a rate, with the y-value on the graph, which is the ball's height itself. Saying the ball 'travelled 2 m from t = 1 to t = 2' treats the instantaneous gradient at one instant as if it were the total distance risen over a whole one-second interval, which is a different quantity found from two height readings, not from one tangent. Saying the speed 'is 2 m/s²' uses the wrong units — m/s² measures acceleration, the rate of change of speed, not speed itself. Always check that the units quoted match what a height-time graph's gradient can actually give you: metres per second.
- (b) 35 N/m² — Pressure = force ÷ area. 84 ÷ 2.4 = 35 N/m². 201.6 N/m² comes from multiplying the force by the area instead of dividing (84 × 2.4). 81.6 N/m² comes from subtracting the area from the force (84 − 2.4) instead of dividing. 0.03 N/m² comes from dividing the area by the force instead of the force by the area (2.4 ÷ 84).
- (a) £150 — Value after year 1: £800 × 0.75 = £600. Value after year 2: £600 × 0.75 = £450. The loss during the second year alone is £600 − £450 = £150. £450 comes from giving the value remaining after 2 years, not the amount lost during the second year. £200 comes from working out the loss during the first year instead of the second: £800 − £600 = £200. £350 comes from working out the total loss over both years instead of just the second year's loss: £800 − £450 = £350.
- (d) 10 — First find the height at each end of the chord. At t = 1, h = 30 × 1 − 5 × 1² = 30 − 5 = 25. At t = 3, h = 30 × 3 − 5 × 3² = 90 − 45 = 45. The gradient of the chord estimates the instantaneous rate at the midpoint t = 2: 45 − 25 = 20, then 20 ÷ (3 − 1) = 20 ÷ 2 = 10 m/s. Finding the change in height but forgetting to divide by the change in time gives 20, which is a distance, not a rate. Averaging the two heights instead of finding the difference gives (25 + 45) ÷ 2 = 70 ÷ 2 = 35. Subtracting in the wrong order, 25 − 45 = −20, then −20 ÷ 2 = −10, gives the correct size with the sign flipped — the rocket is rising, not falling, at t = 2 seconds, so a negative rate cannot be right here.
- (b) The 2.4 kg bag, since it costs £1.80 per kg compared with £1.90 per kg for the 1.5 kg bag. — To compare value for money, work out the cost per kilogram for each bag. 1.5 kg bag: £2.85 ÷ 1.5 = £1.90 per kg. 2.4 kg bag: £4.32 ÷ 2.4 = £1.80 per kg. Since £1.80 is less than £1.90, the 2.4 kg bag gives better value. The option comparing £2.85 with £4.32 directly is wrong because it compares the total prices, not the price per kilogram — a bigger bag naturally costs more in total even if it is better value. The option that names the 1.5 kg bag with £1.80 per kg and the 2.4 kg bag with £1.90 per kg has the correct unit prices but has swapped which bag they belong to. The option giving £1.19 per kg and £2.88 per kg comes from dividing each price by the wrong bag's mass (£2.85 ÷ 2.4 and £4.32 ÷ 1.5).
- (a) £7.80 — Rate of pay = total pay ÷ number of hours. £58.50 ÷ 7.5 = £7.80 per hour. £438.75 comes from multiplying the pay by the hours instead of dividing (£58.50 × 7.5). £0.13 comes from dividing the hours by the pay instead of the pay by the hours (7.5 ÷ 58.50). £51.00 comes from subtracting the hours from the pay (£58.50 − 7.5) instead of dividing.
- (c) 30 — Method: use y = kx and find k from the given pair of values, then substitute x = 12. Working: k = 20 ÷ 8 = 2.5, so y = 2.5 × 12 = 30. Answer: 30. 24 comes from treating the relationship as additive, adding the increase in x (12 − 8 = 4) straight onto y (20 + 4 = 24), instead of multiplying by k. 14.5 comes from finding k correctly (2.5) but then adding it to x instead of multiplying (12 + 2.5 = 14.5). 4.8 comes from finding k upside down, 8 ÷ 20 = 0.4, and multiplying by x: 12 × 0.4 = 4.8.
- (c) m = 6c — Method: the whole is the sum of the parts in the ratio, and the cement is 1 part, so one part weighs c kg. Working: the mix has 5 + 1 = 6 parts, each of mass c kg, so the total mass is 6 × c, giving m = 6c. Answer: m = 6c. The distractors: m = 5c uses the 5 gravel parts as the multiplier and forgets that the cement is in the mix too, so it gives the mass of the gravel and not the total; m = c + 5 comes from reading the ratio as '5 more than' and adding, which treats a number of parts as a mass in kilograms; m = c/6 turns the relationship upside down, as though the total were shared into the cement rather than the cement multiplied up to the total.
- (a) 8/5 — Scaling down from 8 people to 5 people uses the multiplier 5/8. To reverse this and scale back up from 5 people to 8 people, use the reciprocal of that multiplier: flip 5/8 to get 8/5. 5/8 comes from using the forward (scaling down) multiplier again, instead of reversing it. 3/5 comes from writing the difference in people (8 − 5 = 3) over 5, instead of using the reciprocal of 5/8. 25/64 comes from multiplying the forward multiplier by itself (5/8 × 5/8), instead of finding its reciprocal.
- (b) 1:25 — Write the ratio time : volume using the numbers in the question: 8 : 200. Divide both parts by their highest common factor, 8, to give 1 : 25. (25:1 comes from writing the ratio the wrong way round, volume : time. 8:25 comes from dividing only the volume by 8 and leaving the time unchanged. 25:8 is that same mistake written the wrong way round.)