Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.The density of a type of solid plastic is 0.9 g/cm³. Work out the mass of 0.5 m³ of the plastic, in kilograms.
- 2.A scale model of a shipping container is built at a scale of 1 : 30, using material with the same density as the real container. The model has a mass of 400 g. Work out the mass of the real container, giving your answer in kilograms.
- 3.Two mathematically similar tins have heights 8 cm and 12 cm. Jayden says that the volume of the larger tin is 1.5 times the volume of the smaller tin. Give a reason why Jayden is incorrect, and work out the correct volume scale factor.
- 4.Aisha invests £3200 in Account A, which pays 5% compound interest each year. She also invests £3200 in Account B, which pays 3% simple interest each year. Work out how much more Account A is worth than Account B after 2 years.
- 5.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 6.A concrete block exerts a force of 45 N on the ground through a base with an area of 0.05 m². Work out the pressure on the ground, in N/m².
- 7.Two taxi firms show their charges on straight-line graphs, with the cost in pounds on the vertical axis and the distance in miles on the horizontal axis. Firm A's line passes through (0, 4) and (5, 14). Firm B's line passes through (0, 6) and (5, 21). Work out which firm charges more per mile.
- 8.The cost of manufacturing a spherical container is proportional to the cube of its radius. A container of radius 3 cm costs £54 to manufacture. Construct the equation connecting cost C and radius r, then work out the cost of a container of radius 5 cm.
- 9.An online shop's total number of orders received is recorded at the end of each day for five consecutive days: Day 1, 1,284 orders; Day 2, 1,509 orders; Day 3, 1,830 orders; Day 4, 2,296 orders; Day 5, 2,510 orders. Work out between which two consecutive days the average rate of increase in orders was greatest.
- 10.A box holds 60 crayons. 25 of the crayons are broken and the rest are unbroken. Write the number of unbroken crayons as a fraction of the number of broken crayons. Give your answer in its simplest form.
- 11.A cyclist rides at a steady speed of 20 mph. Given that 1 mile ≈ 1.6 km, work out the cyclist's speed in km/h.
- 12.The speed of a car is given by v = d ÷ t. A car travels 180 km in 3 hours. Work out the average speed of the car in km/h.
- 13.Tap A fills a swimming pool in 6 hours. Tap B pours water twice as fast as tap A. The time taken to fill the pool is inversely proportional to the rate of flow. Work out how long tap B takes to fill the pool.
- 14.A baker uses 450 g of flour and 300 g of butter in a batch of pastry. Write the mass of butter as a fraction of the total mass of flour and butter, in its simplest form.
- 15.A metal alloy is made from copper and tin in the ratio 7:3. Work out the mass of tin in 250 g of the alloy.
Answer key
- (b) 450.00 kg — 1 m³ = 100 × 100 × 100 = 1,000,000 cm³, so 0.5 m³ = 500,000 cm³. Mass = density × volume = 0.9 × 500,000 = 450,000 g. Converting to kilograms by dividing by 1000 gives 450,000 ÷ 1000 = 450.00 kg. Skipping the m³-to-cm³ conversion and multiplying 0.9 × 0.5 = 0.45 treats the volume as if it were already 0.5 cm³, giving 0.45 kg. Finding the mass correctly in grams, 450,000 g, but not converting to kilograms leaves 450000.00 kg, out by a factor of 1000. Using the area conversion factor of 10,000, as if converting m² to cm², instead of the volume factor of 1,000,000 gives 0.5 × 10,000 = 5,000 'cm³', and a mass of 0.9 × 5,000 = 4,500 g, which is 4.50 kg.
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.
- (a) 3.375 — Method: the volume scale factor between similar shapes is the length scale factor cubed, not the length scale factor itself. Working: the length scale factor is 12 ÷ 8 = 1.5, and 1.5³ = 3.375. Answer: 3.375. Jayden's answer, 1.5, is only the LENGTH scale factor — he never cubed it to get the volume scale factor. 2.25 comes from squaring the length scale factor instead of cubing it, which would give the area scale factor. 4.5 comes from multiplying the length scale factor by 3 (the number of dimensions) instead of cubing it.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (c) Firm B — £3 per mile against Firm A's £2 per mile — Firm A's gradient is (14 − 4) ÷ 5 = 2, so it charges £2 per mile. Firm B's gradient is (21 − 6) ÷ 5 = 3, so it charges £3 per mile. £3 is more than £2, so Firm B charges more per mile. Swapping the two firms' gradients gives the answer with Firm A at £3 and Firm B at £2, which has the labels the wrong way round. Dividing the change in miles by the change in cost, instead of the other way round, gives 5 ÷ 10 = £0.50 for Firm A and 5 ÷ 15 = £0.33 for Firm B and so names Firm A — that is the gradient upside down. And a positive fixed charge does not mean two firms charge the same rate: the rate is found from the gradient, not from whether the intercept is positive.
- (b) £250 — Since cost is proportional to the cube of the radius, C = kr³. Using r = 3, C = 54: 3³ = 27, so 54 = k × 27, giving k = 54 ÷ 27 = 2. The equation is C = 2r³. When r = 5: 5³ = 125, so C = 2 × 125 = 250. Treating the relationship as proportional to r² instead of r³ gives k = 54 ÷ 9 = 6 and then C = 6 × 25 = 150, which models area scaling, not volume scaling. Treating it as proportional to r itself gives k = 54 ÷ 3 = 18 and then C = 18 × 5 = 90. Finding k correctly from the cube but then multiplying it by the radius instead of by the cube of the radius gives 2 × 5 = 10, which applies the right constant to the wrong power of r. The cost of a container of radius 5 cm is £250.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (d) 7/5 — The number of unbroken crayons is 60 − 25 = 35. The comparison is with the broken crayons, so the broken crayons are the denominator: 35/25. Both parts divide by 5: 35 ÷ 5 = 7 and 25 ÷ 5 = 5. The fraction is 7/5, which is greater than 1 because there are more unbroken crayons than broken ones.
- (c) 32 km/h — Method: to change mph into km/h, multiply by the number of kilometres in a mile. Working: 20 × 1.6 = 32 km/h. So the cyclist's speed is 32 km/h. Distractor 12.5 km/h comes from dividing by 1.6 instead of multiplying. Distractor 21.6 km/h comes from adding 1.6 instead of multiplying by it. Distractor 20 km/h comes from not converting the units at all.
- (d) 60 km/h — Method: use the formula v = d ÷ t with the distance and time given. Working: 180 ÷ 3 = 60 km/h. So the average speed is 60 km/h. Distractor 540 km/h comes from multiplying the distance and time instead of dividing. Distractor 90 km/h comes from dividing by 2 instead of 3. Distractor 18 km/h comes from dividing by 10 instead of 3, a decimal-point slip.
- (a) 3 hours — Method: for a fixed pool the rate of flow multiplied by the time taken is constant, so multiplying the rate by a factor divides the time by that same factor. Working: tap B's rate is 2 times tap A's rate, so tap B's time is 6 ÷ 2 = 3 hours. Answer: 3 hours. The distractors: 12 hours comes from multiplying the time by 2 as well, which treats the time as directly proportional to the rate and has the faster tap taking longer; 4 hours comes from reading ‘twice as fast’ additively, as two hours quicker, and working out 6 − 2 instead of scaling the time by a factor of 2; 1.5 hours comes from applying the factor of 2 twice, halving 6 to 3 and then halving again.
- (b) 2/5 — Method: a fraction taken 'of the total' has the whole batch as its denominator, so add the two masses first and then write the butter over that total. Working: the total mass is 450 g + 300 g = 750 g, so the fraction is 300/750; the highest common factor of 300 and 750 is 150, and 300 ÷ 150 = 2 while 750 ÷ 150 = 5. Answer: 2/5 of the batch. The distractors: 2/3 comes from comparing the butter with the flour, 300/450, a part-to-part fraction when the question asks for a part compared with the whole; 3/5 comes from writing the flour over the total, 450/750, which answers about the wrong ingredient; 3/2 comes from writing the flour over the butter, 450/300, which both uses the wrong denominator and reverses the order.
- (b) 75 g — Method: split the total mass into the number of parts shown by the ratio, then find the mass of tin. Working: the ratio 7:3 has 7 + 3 = 10 parts, so one part is 250 ÷ 10 = 25 g, and the mass of tin is 3 × 25 = 75 g. So the alloy contains 75 g of tin. Distractor 175 g is the mass of copper, not tin. Distractor 125 g comes from splitting the alloy into two equal halves, ignoring the ratio. Distractor 25 g is the value of one part, found correctly but never multiplied by 3.
Build your own mix at the worksheet builder.