Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A cleaning solution is made by mixing disinfectant and water in the ratio 1 : 9. Priti wants to make 6 litres of the solution in total. Work out how much disinfectant she needs.
- 2.Two broadband providers show their monthly cost on straight-line graphs, with the cost in pounds on the vertical axis and the data used in gigabytes on the horizontal axis. Provider X's line passes through (0, 15) and (100, 35). Provider Y's line passes through (0, 5) and (100, 45). Work out which provider is cheaper for a customer who uses 40 gigabytes in a month.
- 3.A candidate wants to estimate the instantaneous rate of change of a reservoir's water level, in metres, at t = 5 days after heavy rain began. The reservoir's water level is plotted against time, in days, since the rain began. The candidate uses the chord joining the points at t = 0 days and t = 20 days to estimate the rate of change at t = 5 days. Give a reason why this is likely to be a poor estimate.
- 4.A charity collects donations from adults and children in the ratio 5:2. Altogether, £238 is collected. Work out how much more the adults donate than the children.
- 5.To make orange paint, red and yellow paint are mixed in the ratio 6:15. Write the amount of red paint as a fraction of the amount of yellow paint, in its simplest form.
- 6.Two mathematically similar logos are printed on a poster. They have areas 20 cm² and 45 cm². Nadia says that the length scale factor from the smaller logo to the larger logo is 45 ÷ 20 = 2.25. Give a reason why Nadia is incorrect, and work out the correct length scale factor.
- 7.y is always the same multiple of x. When x = 6, y = 15. Work out the value of y when x = 10.
- 8.After a 20% discount, a jacket costs £48. Work out the original price of the jacket.
- 9.The concentration of a pollutant in a lake, in arbitrary units, follows the recurrence C_{n+1} = 0.75C_n + 40, with C_0 = 500: each week, 25% of the pollutant breaks down naturally, and then a further 40 units enter the lake from run-off. An ecologist classifies the lake as safe once C_n first drops below 300. Find the first whole number of weeks after which the lake is safe.
- 10.Write 75p : £1.50 as a ratio of whole numbers in its simplest form.
- 11.Two mathematically similar cubes have edge lengths 2 cm and 6 cm. Write the ratio of the volume of the smaller cube to the volume of the larger cube in its simplest form.
- 12.40% of a number is 12 more than 25% of the same number. Work out the number.
- 13.Priya invests £750 in a savings account that pays simple interest. After 3 years, the account contains £840. Work out the annual rate of simple interest.
- 14.A straight-line graph passes through the origin and the point (4, 10). The line represents y = kx. Write down the ratio x : y in its simplest form.
- 15.A worker is paid £13.20 per hour. Work out this rate of pay in pence per minute.
Answer key
- (a) 0.6 litres — The ratio 1 : 9 means the solution has 1 + 9 = 10 equal parts in total. Each part is 6 ÷ 10 = 0.6 litres, and disinfectant is 1 part, so Priti needs 0.6 litres of disinfectant. Giving 0.667 litres divides by 9, the number of parts of water, instead of the total number of parts, 10 (6 ÷ 9 ≈ 0.667). Giving 6 litres is the total amount of solution, not just the disinfectant's share of it. Giving 5.4 litres works out the water's share (6 × 9 ÷ 10 = 5.4), not the disinfectant's.
- (b) Provider Y — £21.00 against Provider X's £23.00 — Provider X's gradient is (35 − 15) ÷ 100 = 0.2, so cost = 15 + 0.2 × 40 = 15 + 8 = £23.00. Provider Y's gradient is (45 − 5) ÷ 100 = 0.4, so cost = 5 + 0.4 × 40 = 5 + 16 = £21.00. £21.00 is less than £23.00, so Provider Y is cheaper: 'Provider Y — £21.00 against Provider X's £23.00'. Getting both costs right but naming Provider X as cheaper compares the two numbers the wrong way round — £23.00 is more than £21.00, not less. Comparing only the fixed fees, £15.00 and £5.00, ignores the cost of the 40 gigabytes actually used. Reading off the costs at 100 gigabytes, £35.00 and £45.00, directly from the graph answers a different usage from the 40 gigabytes the question asks about.
- (a) It's an average over 20 days, which may miss the day-5 rate. — Method: a chord's gradient is the AVERAGE rate of change across the whole interval it spans; it only closely approximates the INSTANTANEOUS rate of change at a point inside that interval when the rate of change is roughly constant across the interval, which usually means the interval needs to be short. Working: here the chord spans 20 days while the point of interest, t = 5, is only a quarter of the way along it, so if the reservoir's level rose or fell at different rates over that time, the chord's gradient will not be close to the true gradient of the curve at t = 5 — this is the correct reason. Claiming the chord's gradient needs the water level at every day in between is wrong: a chord's gradient needs only the two endpoint values, at t = 0 and t = 20. Claiming a chord can only estimate the rate at its own endpoints is wrong: a chord between two points can be used to estimate the instantaneous rate of change at any point inside the interval, including one that is not an endpoint — that is exactly the technique being used here, and it is the SIZE of the interval that makes the estimate poor, not the fact that t = 5 is an interior point. Claiming the units do not match is wrong: the chord's gradient and the instantaneous rate of change are both measured in metres per day, so the units are the same. A chord is only a good estimate of an instantaneous rate when the interval it spans is short enough that the rate does not change much within it — always check how long the interval is compared with how far it is to the point you actually want.
- (a) £102 — Method: find the value of one part of the ratio, then work out each group's share before comparing them. Working: the ratio 5:2 has 5 + 2 = 7 parts, so one part is £238 ÷ 7 = £34. Adults donate 5 × £34 = £170 and children donate 2 × £34 = £68, so adults donate £170 − £68 = £102 more than children. So the difference is £102. Distractor £68 is only the children's donation, without finding the difference. Distractor £170 is only the adults' donation, without finding the difference. Distractor £136 comes from doubling the children's donation instead of subtracting it from the adults' donation.
- (b) 2/5 — The ratio red : yellow is 6:15, so write red over yellow: 6/15. Divide both numbers by their highest common factor, 3: 6÷3 = 2, 15÷3 = 5, giving 2/5. (5/2 comes from writing the ratio the wrong way round, yellow over red, 15/6, which simplifies to 5/2. 2/7 comes from comparing the red paint to the total amount of paint, 6 parts out of 21. 5/7 comes from comparing the yellow paint to the total amount of paint, 15 parts out of 21.)
- (d) 1.5 — Method: the length scale factor is the square root of the area scale factor, not the area scale factor itself. Working: the area scale factor is 45 ÷ 20 = 2.25, and the square root of 2.25 is 1.5. Answer: 1.5. Nadia's answer, 2.25, is the AREA scale factor — she never took the square root to get back to the length scale factor. 4.5 comes from doubling the area scale factor instead of taking its square root. 0.67 comes from taking the square root in the wrong direction, finding the scale factor from the larger rug to the smaller rug instead of the other way round.
- (c) 25 — Find the constant multiplier from the given pair: 15 ÷ 6 = 2.5, so y is always 2.5 times x. When x = 10, y = 10 × 2.5 = 25. 19 comes from assuming an additive relationship instead of a multiplicative one — adding the difference 15 − 6 = 9 onto 10. 4 comes from using the multiplier the wrong way round (6 ÷ 15 = 0.4) and then multiplying by 10. 15 comes from simply repeating the given value of y, without applying the multiplier to the new value of x at all.
- (b) £60 — £48 represents 100% − 20% = 80% of the original price. 1% = £48 ÷ 80 = £0.60, so 100% = £0.60 × 100 = £60.
- (a) 4 weeks — Apply the recurrence week by week. C_1 = 0.75 × 500 + 40 = 375 + 40 = 415. C_2 = 0.75 × 415 + 40 = 311.25 + 40 = 351.25. C_3 = 0.75 × 351.25 + 40 = 263.4375 + 40 = 303.4375. C_4 = 0.75 × 303.4375 + 40 = 227.578125 + 40 = 267.578125. C_3 = 303.4375 is still above 300, but C_4 = 267.58 has dropped below it, so the lake first becomes safe after 4 weeks. Taking 25% of the ORIGINAL 500 every week instead of 25% of the current amount, a flat 125 each time, gives 500 − 125 + 40 = 415, then 415 − 125 + 40 = 330, then 330 − 125 + 40 = 245, which crosses 300 a week too early and gives the wrong answer of 3 weeks. Continuing one extra step to C_5 = 0.75 × 267.578125 + 40 = 200.68 + 40 = 240.68 and calling it 5 weeks overshoots, since the concentration had already dropped below 300 at C_4. Forgetting the 40 units of run-off each week and only applying the decay gives C_1 = 0.75 × 500 = 375, then C_2 = 0.75 × 375 = 281.25 — this is already below 300 after only 2 weeks, because without the run-off the concentration falls much faster.
- (c) 1:2 — Convert £1.50 into pence: £1.50 = 150p, so the ratio is 75 : 150. Dividing both parts by 75 gives 1 : 2. Getting 50 : 1 comes from not converting the units at all and simplifying 75 : 1.5. Getting 2 : 1 has the two parts the wrong way round. Getting 3 : 4 comes from reading 75p as 3/4 of a pound and then comparing it with £1 instead of £1.50.
- (c) 1 : 27 — The edge lengths are in the ratio 2 : 6, which simplifies to 1 : 3. Volumes scale with the cube of the length ratio, so the volume ratio is 1³ : 3³ = 1 : 27. Giving 1 : 3 uses the length ratio without cubing it. Giving 1 : 9 squares the length ratio, which is the rule for areas, instead of cubing it, which is the rule for volumes. Giving 27 : 1 has the ratio the right way round for larger to smaller, not smaller to larger as the question asks.
- (b) 80 — Method: the difference between 40% and 25% of the number is 15% of the number, and that difference is 12. Working: 15% of the number is 12, so 1% of the number is 12 ÷ 15 = 0.8, and the number is 0.8 × 100 = 80. Check: 40% of 80 is 32, 25% of 80 is 20, and 32 − 20 = 12. Answer: 80. The distractors: 30 comes from solving 40% of the number = 12; 48 comes from solving 25% of the number = 12; 15 is the percentage difference written as the answer.
- (b) 4% — Method: find the total interest earned, share it equally across the number of years to find one year's interest, then write it as a percentage of the amount invested. Working: total interest = £840 − £750 = £90, so one year's interest is £90 ÷ 3 = £30, and £30 as a percentage of £750 is (£30 ÷ £750) × 100 = 4%. Answer: 4%. 12% comes from treating the total interest of £90 as if it were earned in a single year, (£90 ÷ £750) × 100 = 12%, forgetting to divide by 3 years. 0.04% comes from finding the correct decimal, £30 ÷ £750 = 0.04, but forgetting to multiply by 100 to convert it into a percentage. 112% comes from writing the final amount, £840, as a percentage of the amount invested, £750, without first subtracting the £750 to find the interest alone.
- (c) 2 : 5 — The point (4, 10) gives x = 4, y = 10, so x : y = 4 : 10. Dividing both parts by their highest common factor, 2, gives 2 : 5 in simplest form. Inverting the whole ratio gives 5 : 2, which is y : x instead of x : y. Dividing only the x-part by 2 and leaving the y-part as 10 gives 2 : 10, but scaling one part on its own changes the ratio: 2 : 10 is the same as 1 : 5, not 4 : 10. Dividing only the y-part by 2 and leaving the x-part as 4 gives 4 : 5, the same one-sided mistake made on the other part of the ratio.
- (a) 22p — First convert the hourly rate to pence: £13.20 = 1320p. Then convert from per hour to per minute by dividing by 60, since there are 60 minutes in an hour: 1320 ÷ 60 = 22p per minute. Working out 1320 × 60 = 79200p multiplies by 60 instead of dividing, going the wrong way between per hour and per minute. Working out 13.20 × 10 = 132p converts pounds to pence using the wrong power of ten, and dividing that by 60 carries the error through to give 2.2p. Working out 13.20 × 100 = 1320p converts the currency correctly but stops there, leaving the rate as pence per hour rather than completing the second conversion to pence per minute. The rate of pay is 22p per minute.
Build your own mix at the worksheet builder.