Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.Two scale plans of the same football pitch are drawn: Plan A has a scale of 1 : 1000 and Plan B has a scale of 1 : 200. A pitch length is 8 cm on Plan A. Work out the length of the same pitch on Plan B, in centimetres.
- 2.A tangent to a curve at the point where x = 3 passes through the points (1, 2) and (5, 14). A candidate says: "The gradient of the tangent at x = 3 is 3, because 14 − 2 = 12 and 12 ÷ 4 = 3." Which statement is correct?
- 3.A gardener mixes 300 ml of plant feed concentrate with 1.2 litres of water to make a spray. Write the ratio of concentrate to water in its simplest form.
- 4.Before a charity campaign, donations were £6400 per month. Donations grew by 8% in the first year after the campaign, and then fell by 3% in the second year as interest faded. Work out the amount donated per month at the end of the second year, to the nearest pound.
- 5.A shop's profit, P pounds, is in direct proportion to the number of items sold, n. When 15 items are sold, the profit is £45. Write down the ratio n : P in its simplest form for this shop.
- 6.A company had 8000 employees. The number of employees decreased by 5% in the first year, and then increased by 5% in the second year. Work out the number of employees at the end of the second year, to the nearest whole number.
- 7.Maya is paid £105.30 for working 9 hours. Work out her rate of pay, in £ per hour.
- 8.Leah puts £4000 into a savings account paying 3% compound interest each year. At the end of 2 years she takes out all of the money and spends £1500 of it on a laptop. Work out how much of the money she has left.
- 9.1 metre = 100 cm. Work out how many square centimetres there are in 1 square metre.
- 10.A delivery driver travels 45 km in the first 30 minutes of a journey, and then a further 75 km in the next 1 hour. Work out her average speed for the whole journey, in km/h.
- 11.A scale drawing of a garden uses a scale of 1 : 20. Write down a formula for the real length, L metres, in terms of the length on the drawing, d centimetres, given that 1 metre = 100 centimetres.
- 12.A kettle uses 2.1 kWh of energy. A toaster uses 0.9 kWh of energy. Write the energy used by the kettle as a fraction of the energy used by the toaster, giving your answer in its simplest form.
- 13.A factory machine produces bottles at a constant rate. In 45 minutes it produces 810 bottles. The factory needs 2,160 bottles for an order. Working at the same rate, work out how many minutes it will take to produce the order.
- 14.Which of these ratios is equivalent to 6 : 10 : 14?
- 15.Tap A fills a swimming pool in 6 hours. Tap B pours water twice as fast as tap A. The time taken to fill the pool is inversely proportional to the rate of flow. Work out how long tap B takes to fill the pool.
Answer key
- (c) 40 cm — First find the real pitch length using Plan A's scale: 8 × 1000 = 8000 cm. Now find its length on Plan B using Plan B's scale: 8000 ÷ 200 = 40 cm. Assuming both plans use the same scale and leaving the length as 8 cm ignores that Plan B has a different scale. Using the ratio of the two scales upside down, 200 ÷ 1000 = 0.2, then 8 × 0.2 = 1.6, gives 1.6 cm — Plan B is drawn to a larger scale than Plan A, so lengths on it should be bigger, not smaller. Dividing by 2000 instead of 200 gives 4 cm, ten times too small.
- (a) The gradient is 3; the candidate's method is right. — The gradient of a tangent, like any straight line, is the change in y divided by the change in x between two points on it. Here the tangent passes through (1, 2) and (5, 14), so the change in y is 14 − 2 = 12 and the change in x is 5 − 1 = 4. The gradient is 12 ÷ 4 = 3, so the candidate's calculation is correct. Subtracting in the wrong order, (2 − 14) ÷ (5 − 1), gives −12 ÷ 4 = −3, the wrong sign. Adding the two changes instead of dividing them, 12 + 4 = 16, does not find a gradient at all. Dividing the change in x by the change in y instead of the other way round, 4 ÷ 12 = 1/3, inverts the calculation completely. Before accepting or rejecting a claimed gradient, always redo the calculation yourself in the same order — change in y over change in x — rather than trusting the arithmetic as given.
- (c) 1 : 4 — Convert to the same unit: 1.2 litres = 1200 ml, since 1 litre = 1000 ml. This gives the ratio 300 : 1200. Divide both parts by their highest common factor, 300, to get 1 : 4. Giving 3 : 12 divides by 100 only, which is a common factor but not the highest one. Giving 1 : 1.2 has not converted 1.2 litres into millilitres, so the two parts are not in the same unit. Giving 4 : 1 swaps the order, comparing water to concentrate instead of concentrate to water.
- (d) £6705 — After the first year: £6400 × 1.08 = £6912. After the second year: £6912 × 0.97 = £6704.64, which rounds to £6705 (nearest pound). £6720 comes from treating the +8% and −3% changes as a single net +5% change applied to the original amount instead of applying each change in turn: £6400 × 1.05 = £6720. £6912 comes from applying only the first year's growth and stopping there, without applying the second year's fall. £7104 comes from adding the two percentages together as +11% and applying that to the original amount instead of applying each change to the correct starting amount in turn: £6400 × 1.11 = £7104.
- (c) 1 : 3 — n : P = 15 : 45. Dividing both parts by their highest common factor, 15, gives 1 : 3. Inverting the ratio, 3 : 1, swaps profit and number of items. Dividing only the n-part by 15, getting 1, but leaving the P-part as 45 gives 1 : 45 — only one side has been simplified. Dividing only the P-part by 15, getting 3, but leaving the n-part as 15 gives 15 : 3, the opposite partial mistake.
- (b) 7980 — After the first year: 8000 × 0.95 = 7600. After the second year: 7600 × 1.05 = 7980. 8000 comes from assuming a 5% decrease followed by a 5% increase returns exactly to the starting number — it does not, because the increase acts on the smaller, already-reduced number. 8400 comes from applying only the second year's 5% increase to the original number: 8000 × 1.05 = 8400. 7600 comes from applying only the first year's 5% decrease and stopping there, without applying the second year's increase.
- (a) £11.70 — Rate of pay = total pay ÷ hours worked, so £105.30 ÷ 9 = £11.70 per hour. Working out £105.30 − 9 = £96.30 subtracts the number of hours from the total pay instead of dividing. Working out £105.30 × 9 = £947.70 multiplies total pay by hours worked instead of dividing. Misplacing the decimal point in the correct answer gives £117.00 instead of £11.70. Maya's rate of pay is £11.70 per hour.
- (c) £2743.60 — Each year the balance is multiplied by 1.03. After the first year: 4000 × 1.03 = 4120. After the second year: 4120 × 1.03 = 4243.60, so that is what Leah takes out. She then spends £1500 of it, which leaves 4243.60 − 1500 = 2743.60. She has £2743.60 left.
- (b) 10000 cm² — Method: an area conversion factor is the square of the length conversion factor, because both sides of the square are scaled. Working: a square metre is a square of side 100 cm, so its area is 100 × 100 = 10000 cm². Answer: 10000 cm². The distractors: 100 cm² comes from using the length factor without squaring it; 200 cm² comes from doubling the length factor instead of squaring it; 1000000 cm² comes from cubing the factor, which is the conversion for a volume, not an area.
- (a) 80 km/h — Average speed = total distance ÷ total time. Total distance = 45 + 75 = 120 km. Total time = 30 minutes + 1 hour = 1.5 hours. 120 ÷ 1.5 = 80 km/h. 60 km/h comes from treating the 30 minutes as a whole hour, giving a total time of 2 hours instead of 1.5 (120 ÷ 2). 82.5 km/h comes from averaging the two separate speeds (45 ÷ 0.5 = 90 km/h and 75 ÷ 1 = 75 km/h, then (90 + 75) ÷ 2) instead of using total distance over total time. 75 km/h comes from using only the second part of the journey (75 km in 1 hour) and ignoring the first part.
- (c) L = d/5 — The scale 1 : 20 means each cm on the drawing represents 20 cm in real life, so the real length in cm is 20d. Converting to metres by dividing by 100: L = 20d/100 = d/5.
- (d) 7/3 — Put the kettle's energy over the toaster's energy: 2.1/0.9. Multiply both numbers by 10 to clear the decimals: 21/9. Divide both by their highest common factor, 3: 21÷3 = 7, 9÷3 = 3, giving 7/3. (3/7 comes from writing the energy values the wrong way round. 4/3 comes from finding the difference, 2.1 − 0.9 = 1.2 kWh, and writing it as a fraction of the toaster's energy, 1.2/0.9. 7/10 comes from comparing the kettle's energy to the total energy used by both appliances, 2.1/3.0.)
- (b) 120 minutes — Method: find the rate in bottles per minute, then divide the order size by the rate. Working: rate = 810 ÷ 45 = 18 bottles per minute. Time = 2,160 ÷ 18 = 120 minutes. Wrong options: 1,350 minutes comes from subtracting 810 from 2,160 instead of using the rate; 48 minutes comes from dividing the order size by the original time (2,160 ÷ 45) instead of the rate; 108 minutes comes from rounding the rate to 20 bottles per minute before dividing.
- (c) 9:15:21 — 6 : 10 : 14 simplifies to 3 : 5 : 7 (divide every part by 2). Multiplying every part of 3 : 5 : 7 by 3 gives 9 : 15 : 21, so 9 : 15 : 21 is equivalent to 6 : 10 : 14. Adding 2 to every part of 6 : 10 : 14 gives 8 : 12 : 16, which is not equivalent — ratios are equivalent when every part is multiplied by the same number, not when the same number is added to every part. Doubling only the first two parts, 6 × 2 = 12 and 10 × 2 = 20, but leaving the third part unchanged at 14, gives 12 : 20 : 14 — a scaling applied to two parts and not the third. Cancelling the first two parts correctly, 6 ÷ 2 = 3 and 10 ÷ 2 = 5, then treating the three numbers as a sequence and making the third part the sum of the first two, 3 + 5 = 8, gives 3 : 5 : 8 — the third part was never divided by 2 at all.
- (a) 3 hours — Method: for a fixed pool the rate of flow multiplied by the time taken is constant, so multiplying the rate by a factor divides the time by that same factor. Working: tap B's rate is 2 times tap A's rate, so tap B's time is 6 ÷ 2 = 3 hours. Answer: 3 hours. The distractors: 12 hours comes from multiplying the time by 2 as well, which treats the time as directly proportional to the rate and has the faster tap taking longer; 4 hours comes from reading ‘twice as fast’ additively, as two hours quicker, and working out 6 − 2 instead of scaling the time by a factor of 2; 1.5 hours comes from applying the factor of 2 twice, halving 6 to 3 and then halving again.
Build your own mix at the worksheet builder.