Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.A machine is bought for £8500. Its value depreciates by 6% each year. Work out the value of the machine after 3 years, to the nearest pound.
- 2.y is directly proportional to x. When x = 7, the value of y is 21. Work out the value of x when y = 12.
- 3.Write 350 ml : 1.4 l as a ratio in its simplest form.
- 4.Priya invests £750 in a savings account that pays simple interest. After 3 years, the account contains £840. Work out the annual rate of simple interest.
- 5.A sprinter's distance from the start line, in metres, is plotted against time, in seconds. A tangent to the graph at t = 2 seconds has gradient 6. A tangent at t = 8 seconds has gradient 9.5. Which statement correctly compares the sprinter's speed at these two times?
- 6.y is inversely proportional to x, so y = k ÷ x. When x = 5, the value of y is 8. Work out the value of k.
- 7.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 8.An online shop's total number of orders received is recorded at the end of each day for five consecutive days: Day 1, 1,284 orders; Day 2, 1,509 orders; Day 3, 1,830 orders; Day 4, 2,296 orders; Day 5, 2,510 orders. Work out between which two consecutive days the average rate of increase in orders was greatest.
- 9.A journey takes 4 hours at an average speed of 60 km/h. The time taken is inversely proportional to the average speed. Work out how long the same journey takes at an average speed of 80 km/h.
- 10.Noah runs 2 km in 10 minutes. Work out how long he takes to run 5 km at the same speed.
- 11.Two numbers a and b are in the ratio a : b = 3 : 4. Given that a = 15, work out the value of b.
- 12.The mass of a length of copper pipe is proportional to its length. A pipe of length 4.5 m has a mass of 12.6 kg. Work out the mass of a pipe of the same type of length 9.5 m.
- 13.Write the ratio 0.75 : 2 as a ratio of whole numbers in its simplest form.
- 14.£5000 is invested in an account paying 4% compound interest each year. Work out the total interest earned after 3 years.
- 15.An architect builds a scale model of a staircase before construction. The model is mathematically similar to the real staircase, at a scale of 1 : 10. The model covers a floor area of 0.4 m² on the plan. Work out the floor area the real staircase will cover, giving your answer in m².
Answer key
- (d) £7060 — A 6% decrease each year means the value becomes 100% − 6% = 94% of the previous year's value, and 94% = 0.94, so the multiplier is 0.94. Apply it once for each of the 3 years: £8500 × 0.94 = £7990 after 1 year, £7990 × 0.94 = £7510.60 after 2 years, £7510.60 × 0.94 = £7059.96 after 3 years, which rounds to £7060 to the nearest pound. (£6970 comes from using simple depreciation instead of compound, taking 6% of the original £8500 three times: £8500 − 3 × £510 = £6970. £7990 is the value after only 1 year, forgetting the remaining 2 years. £7511 is the value after only 2 years, £8500 × 0.94² = £7510.60, forgetting the third year.)
- (a) 4 — Method: find the constant of proportionality from the pair given, write the equation, then substitute the new value of y and solve. Working: k = 21 ÷ 7 = 3, so y = 3x; putting y = 12 gives 12 = 3x, and x = 12 ÷ 3 = 4. Answer: 4. The distractors: 36 comes from multiplying by the constant instead of dividing by it, 12 × 3, which is the proportion set up upside down; 84 comes from multiplying 12 by the 7 from the first pair, using a value of x as though it were the constant; 9 comes from working out 12 − 3, treating the equation as y = x + 3 rather than y = 3x.
- (d) 1:4 — Convert 1.4 l to millilitres: 1.4 l = 1400 ml. The ratio is 350 : 1400. Divide both parts by 350: 350 ÷ 350 = 1 and 1400 ÷ 350 = 4, giving 1 : 4. Misreading 1.4 l as 14 (moving the decimal point) gives 350 : 14, which simplifies to 25 : 1 — a very different, implausible ratio. Dividing by 175 instead of 350 gives 2 : 8, which still shares a common factor of 2, so it is not fully simplified. Swapping the order gives 4 : 1, litres to millilitres the wrong way round.
- (b) 4% — Method: find the total interest earned, share it equally across the number of years to find one year's interest, then write it as a percentage of the amount invested. Working: total interest = £840 − £750 = £90, so one year's interest is £90 ÷ 3 = £30, and £30 as a percentage of £750 is (£30 ÷ £750) × 100 = 4%. Answer: 4%. 12% comes from treating the total interest of £90 as if it were earned in a single year, (£90 ÷ £750) × 100 = 12%, forgetting to divide by 3 years. 0.04% comes from finding the correct decimal, £30 ÷ £750 = 0.04, but forgetting to multiply by 100 to convert it into a percentage. 112% comes from writing the final amount, £840, as a percentage of the amount invested, £750, without first subtracting the £750 to find the interest alone.
- (d) Faster at t = 8s — still accelerating — The gradient of a tangent on a distance-time graph is the instantaneous speed, in m/s. At t = 2 seconds the speed is 6 m/s; at t = 8 seconds it is 9.5 m/s, which is faster, so the sprinter is still accelerating between these two times. Saying the sprinter is slower at t = 8s reverses the comparison — 9.5 is greater than 6, not less. Writing 9.5 − 6 = 3.5 and calling this 'metres further covered' turns the difference of two speeds into a distance, which the units do not support: a difference of two speeds is itself a speed, not a distance. Taking 9.5 m/s, the larger of the two instantaneous speeds, as the average speed for the whole race confuses a speed at one instant with an average over the whole distance, which would need the total distance and total time, not two tangent gradients.
- (d) 40 — Substitute x = 5 and y = 8 into y = k ÷ x to get 8 = k ÷ 5, so k = 8 × 5 = 40. Getting 13 comes from adding the two numbers (5 + 8) instead of multiplying. Getting 1.6 comes from dividing 8 by 5 instead of multiplying. Getting 3 comes from subtracting the two numbers (8 − 5) instead of multiplying.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) Day 3 to Day 4 — Method: the average rate of increase between two consecutive days is the difference in the number of orders divided by the number of days between them, which here is just the difference itself, since each gap is one day; comparing all four differences finds which is greatest. Working: the differences are 1,509 − 1,284 = 225 (Day 1 to Day 2), 1,830 − 1,509 = 321 (Day 2 to Day 3), 2,296 − 1,830 = 466 (Day 3 to Day 4), and 2,510 − 2,296 = 214 (Day 4 to Day 5); 466 is the greatest of the four, so the rate of increase was greatest from Day 3 to Day 4. Choosing Day 4 to Day 5 comes from picking the interval that ends on the highest total number of orders, 2,510, confusing the SIZE of the total with the RATE at which it grew. Choosing Day 1 to Day 2 comes from assuming the rate must be greatest at the very start, without working out any of the four differences. Choosing Day 2 to Day 3 comes from comparing only the first two differences, 225 and 321, and stopping there without checking Day 3 to Day 4 or Day 4 to Day 5. Finding the greatest rate of change from a table always means computing every difference between consecutive values and comparing them all — the day with the highest total, or the first pair you check, is not a shortcut.
- (c) 3 hours — Method: in inverse proportion the product of the two quantities is constant, and here that product is the distance. Working: 60 × 4 = 240 km, so at 80 km/h the time is 240 ÷ 80 = 3. Answer: 3 hours. The distractors: 5 hours 20 minutes comes from treating the relationship as direct, working out 4 × 80 ÷ 60; 2 hours 40 minutes comes from cutting the time by the fraction the speed rose by — the speed went up by one third, so the time was cut by one third — which is not how inverse proportion works; 4 hours comes from dividing the 240 km by the original speed of 60 km/h again instead of by the new speed.
- (d) 25 minutes — Method: find the time for one kilometre, then multiply by the number of kilometres — the unitary method with a rate. Working: 10 ÷ 2 = 5 minutes per km, and 5 × 5 = 25. Answer: 25 minutes. The distractors: 20 minutes comes from multiplying the 10 minutes by 2, the distance in the given rate, instead of by the scale factor 2.5; 50 minutes comes from multiplying 10 by 5, treating the 10 minutes as the time for a single kilometre; 15 minutes comes from adding the 5 km on to the 10 minutes, adding quantities that are not the same kind.
- (d) 20 — Method: equivalent ratios are linked by a single multiplier, so find it from the part you know and apply it to the other part. Working: 15 ÷ 3 = 5, so the multiplier is 5, and 4 × 5 = 20. Answer: 20. The distractors: 16 comes from adding the difference between the ratio parts, 4 − 3 = 1, to 15, treating the ratio as a difference; 60 comes from multiplying 15 by 4 without first dividing by 3; 11.25 comes from using the ratio the wrong way round, working out 15 × 3 ÷ 4.
- (d) 26.6 — Find the constant multiplier — the mass of each metre of pipe: 12.6 ÷ 4.5 = 2.8, so the mass is always 2.8 times the length. For a length of 9.5 m, the mass is 9.5 × 2.8 = 26.6 kg. 17.6 comes from assuming an additive relationship instead of a multiplicative one — adding the increase in length (9.5 − 4.5 = 5) onto 12.6. 3.4 comes from using the multiplier the wrong way round (4.5 ÷ 12.6, rounded to 1 d.p.), then multiplying by 9.5. 12.6 comes from simply repeating the given mass, without applying the multiplier to the new length.
- (d) 3 : 8 — Multiply both parts by 4 to clear the decimal: 0.75 × 4 = 3 and 2 × 4 = 8, giving 3 : 8, which has no common factor other than 1. Giving 75 : 200 multiplies by 100 instead of 4, and has not then been simplified down to 3 : 8. Giving 0.75 : 2 has not been converted into whole numbers at all. Giving 3 : 2 converts the first part correctly but leaves the second part unscaled.
- (c) £624.32 — A 4% rise is a multiplier of 1.04, applied once each year. After year 1: 5000 × 1.04 = 5200. After year 2: 5200 × 1.04 = 5408. After year 3: 5408 × 1.04 = 5624.32. The question asks for the interest, not the value of the account, so take away the amount invested at the start: 5624.32 − 5000 = 624.32. The total interest earned is £624.32.
- (a) 40 m² — A scale of 1 : 10 is a length scale factor of 10 from model to real. Areas scale with the square of the length scale factor: 10² = 100. 0.4 × 100 = 40, so the real staircase covers 40 m². Giving 4 m² uses the length scale factor, 10, without squaring it (0.4 × 10 = 4). Giving 0.04 m² divides by the scale factor instead of multiplying by its square (0.4 ÷ 10 = 0.04). Giving 400 m² cubes the scale factor, 10³ = 1000, as if area scaled like a volume (0.4 × 1000 = 400).
Build your own mix at the worksheet builder.