Printable · GCSE Higher · ages 14-16
Ratio, proportion and rates of change worksheet — GCSE Higher
Fifteen questions across the ratio, proportion and rates of change statements at Higher tier. Choose the non-calculator filter to rehearse Paper 1, which counts for a third of the marks.
Ratio, proportion and rates of change worksheet — GCSE Higher
MathsUKwww.geekhero.co.uk
- 1.An adult cinema ticket costs £15 and a child ticket costs £9. Write the ratio of the adult price to the child price in its simplest form.
- 2.Two mathematically similar jugs have heights 8 cm and 12 cm. The smaller jug holds 200 ml when it is full. Work out how much the larger jug holds when it is full.
- 3.A footpath is drawn 3 cm long on a map with a scale of 1 : 50 000. Work out the real length of the footpath, in metres.
- 4.A laptop costs £800 when new. Its value decreases by 25% of its value at the start of each year. Work out how much value the laptop loses in the second year.
- 5.A post 2 metres tall casts a shadow 3 metres long. At the same time a nearby tree casts a shadow 12 metres long. Work out the height of the tree.
- 6.A map's scale is given as '1 cm represents 2 km'. Write this scale in the form 1 : n.
- 7.A river 120 km long is drawn as a line 6 cm long on a map. Work out the scale of the map.
- 8.Aisha invests £3200 in Account A, which pays 5% compound interest each year. She also invests £3200 in Account B, which pays 3% simple interest each year. Work out how much more Account A is worth than Account B after 2 years.
- 9.A scale model of a shipping container is built at a scale of 1 : 30, using material with the same density as the real container. The model has a mass of 400 g. Work out the mass of the real container, giving your answer in kilograms.
- 10.In a fruit bowl, the ratio of apples to oranges is 5 : 3. Work out what percentage of the fruit in the bowl is apples.
- 11.A fixed job of fitting a solar array is shared between installers, and the time taken is inversely proportional to the number of installers working on it at once. With 4 installers the job takes 18 hours. Construct the equation connecting time T and number of installers n, then work out how long it would take with 6 installers.
- 12.The ratio of Josh's savings to Mia's savings is 4:7. Mia has £39 more than Josh. Work out Josh's savings.
- 13.A concrete block exerts a force of 45 N on the ground through a base with an area of 0.05 m². Work out the pressure on the ground, in N/m².
- 14.A tank is filled at a rate of 3 litres every 2 minutes. Given that 1 litre = 1000 cm³, work out the flow rate in cm³ per minute.
- 15.Cheng is paid an hourly rate that is proportional to the number of hours she works. She earns £52.50 for 7 hours. Work out how much she earns for 11 hours, assuming the same rate.
Answer key
- (a) 5:3 — Divide both prices by their highest common factor, 3: 15 ÷ 3 = 5 and 9 ÷ 3 = 3, giving the ratio 5:3. Choosing 3:5 comes from writing the ratio the wrong way round, as child price to adult price. Choosing 2:3 comes from using the difference between the two prices (15 − 9 = 6) as the first part of the ratio instead of the adult price, then simplifying 6:9 by dividing by 3. Choosing 5:8 comes from comparing the adult price with the total cost of both tickets (£15 out of £24) instead of comparing it with the child price.
- (a) 675 ml — How much a jug holds is a volume, and volumes of similar solids scale with the cube of the length scale factor. The length scale factor is 12 ÷ 8 = 1.5, so the volume scale factor is 1.5 × 1.5 × 1.5 = 3.375. The larger jug holds 200 × 3.375 = 675 ml. Multiplying the scale factor by 3 instead of raising it to the power 3 is the mistake to guard against here.
- (b) 1500 m — Method: multiply the map length by the scale to get the real length in centimetres, then divide by 100 to change centimetres into metres. Working: 3 × 50 000 = 150 000 cm, and 150 000 ÷ 100 = 1500. Answer: 1500 m. The distractors: 15000 m comes from dividing the 150 000 cm by 10 instead of 100; 150 m comes from dividing by 1000, the conversion for kilometres; 50000 m comes from writing the scale itself as the answer and ignoring the 3 cm measured on the map.
- (a) £150 — Value after year 1: £800 × 0.75 = £600. Value after year 2: £600 × 0.75 = £450. The loss during the second year alone is £600 − £450 = £150. £450 comes from giving the value remaining after 2 years, not the amount lost during the second year. £200 comes from working out the loss during the first year instead of the second: £800 − £600 = £200. £350 comes from working out the total loss over both years instead of just the second year's loss: £800 − £450 = £350.
- (c) 8 m — Method: in the same sunlight every object has its height and its shadow in the same ratio, so write 2:3 = h:12, find the multiplier that takes 3 to 12 and apply it to the height. Working: 12 ÷ 3 = 4, so the tree's shadow is 4 times the post's shadow; the height must be scaled by the same 4, giving 4 × 2 = 8 m. Answer: 8 m. The distractors: 18 m comes from setting up the proportion upside down, 12 ÷ 2 × 3, which scales by shadow over height instead of height over shadow; 24 m comes from multiplying the 12 m shadow by the post's height of 2 m and never dividing by the post's shadow of 3 m; 4 m is the scale factor 12 ÷ 3, given as a length instead of being used to scale the 2 m post.
- (b) 1:200000 — '1 cm represents 2 km' means 1 cm on the map is 2 km in real life. Convert 2 km into centimetres, the same unit as the 1: 2 km = 2000 m = 200 000 cm. So the scale is 1 : 200 000. Converting only as far as metres gives 1 : 2000 — the conversion to centimetres was never finished. Losing a zero in the conversion gives 1 : 20 000, ten times too small. Writing 1 : 2 without converting units at all compares 1 cm to 2 km directly, which is not a valid ratio since the units do not match.
- (a) 1 : 2 000 000 — Method: a scale is a ratio between two lengths written in the same unit, reduced so that the map distance is 1. Working: 120 km = 120 × 1000 × 100 = 12 000 000 cm, so the ratio is 6 : 12 000 000, and dividing both parts by 6 gives 1 : 2 000 000. Answer: 1 : 2 000 000. The distractors: 1 : 12 000 000 comes from writing the real length in centimetres without dividing by the 6 cm on the map; 1 : 200 000 comes from taking 120 km as 1 200 000 cm, one conversion step short, before dividing by 6; 1 : 20 000 comes from converting 120 km to 120 000 m and treating those metres as centimetres.
- (c) £136 — 5% interest each year means the value becomes 100% + 5% = 105% of the previous year's value, and 105% = 1.05, so the multiplier is 1.05. Account A: £3200 × 1.05 × 1.05 = £3528. Account B (simple interest): £3200 + 2 × (£3200 × 0.03) = £3392. The difference is £3528 − £3392 = £136. (£128 comes from working out Account A with simple interest too, instead of compound: £3200 + 2 × (£3200 × 0.05) = £3520, then £3520 − £3392 = £128. £3528 is the value of Account A on its own, not the difference between the two accounts. £3392 is the value of Account B on its own, not the difference.)
- (c) 10,800 kg — Method: since the model and the real container are similar and made of the same material, mass scales with volume, so the mass scale factor is the length scale factor cubed. Working: 30³ = 27,000, so the real container's mass is 400 × 27,000 = 10,800,000 g, which is 10,800,000 ÷ 1,000 = 10,800 kg. Answer: 10,800 kg. 12 kg comes from using the length scale factor directly, 400 × 30 = 12,000 g, without cubing it. 360 kg comes from squaring the length scale factor instead of cubing it, 400 × 30² = 360,000 g. 10,800,000 kg comes from correctly cubing the scale factor but then forgetting to convert the mass from grams into kilograms.
- (b) 62.5% — Total parts = 5 + 3 = 8. Apples make up 5 parts, so the percentage is 5/8 × 100 = 62.5%. A student who finds the oranges' share instead gets 3/8 × 100 = 37.5%. A student who assumes an even split gets 50%. A student who inverts the fraction gets 8/5 × 100 = 160%.
- (d) 12 hours — Since time is inversely proportional to the number of installers, T = k/n. Using n = 4, T = 18: 18 = k ÷ 4, so k = 18 × 4 = 72. The equation is T = 72/n. When n = 6: T = 72 ÷ 6 = 12. Using the original number of installers instead of the new one gives T = 72 ÷ 4 = 18, the wrong value substituted. Treating more installers as needing more time, as if T were directly proportional to n, gives k = 18 ÷ 4 = 4.5 and then T = 4.5 × 6 = 27, the opposite relationship to the one described. Stopping at k = 72 and reporting it gives the time the job would take a single installer working alone — the constant still has to be divided by the new number of installers before it answers the question asked. With 6 installers, the job takes 12 hours.
- (b) £52 — Method: the difference between the two ratio numbers tells you how many parts the £39 difference represents. Working: the difference in parts is 7 − 4 = 3, and this represents £39, so one part is £39 ÷ 3 = £13. Josh's savings are 4 × £13 = £52. So Josh has £52. Distractor £91 is Mia's savings, not Josh's. Distractor £39 comes from using the given £39 difference as the final answer, without scaling it to Josh's number of parts. Distractor £13 is the value of one part, found correctly but never multiplied by 4.
- (b) 900 N/m² — Pressure = force ÷ area, so 45 ÷ 0.05 = 900 N/m². Working out 45 ÷ 5 = 9 misplaces the decimal point in the area, treating 0.05 m² as 5 m². Working out 45 × 0.05 = 2.25 multiplies force and area together instead of dividing. Working out 45 + 0.05 = 45.05 simply adds the two given numbers, which does not give a pressure at all. The pressure on the ground is 900 N/m².
- (b) 1500 — The rate is 3 ÷ 2 = 1.5 litres per minute. Converting to cm³: 1.5 × 1000 = 1500 cm³ per minute. Getting 3000 comes from converting 3 litres to cm³ first (3000 cm³) and forgetting to divide by the 2 minutes. Getting 750 comes from dividing by the 2 minutes a second time after converting (1500 ÷ 2). Getting 2000 comes from converting the 2 minutes as if it were litres (2 × 1000) instead of using the correct rate of 1.5 litres per minute.
- (d) £82.50 — Find the hourly rate: £52.50 ÷ 7 = £7.50 per hour. For 11 hours: 11 × £7.50 = £82.50. £30 comes from working out the pay for only the extra 4 hours (4 × £7.50), and forgetting to include the original £52.50. £99 comes from misremembering the hourly rate as £9 instead of £7.50, then 11 × £9. £56.50 comes from adding the extra number of hours (4) straight onto the pay in pounds (52.5 + 4), confusing hours with pounds.
Build your own mix at the worksheet builder.